Page 1 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G000345-00-L Operating the Observatories Mark Coles.

Slides:



Advertisements
Similar presentations
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Advertisements

1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
Information and Technology Services Customer Services.
LIGO-G Z 23 October 2002NSF Review of LIGO Laboratory1 The Penn State LIGO Data Analysis Center Lee Samuel Finn Penn State.
Lancaster County Replacement Facility Development Strategy Presented by: CGL Capital Solutions May 19, 2011 A World of Solutions.
IUC Shared Services Project Commissioned by Ohio Intra-University Council Commissioned by Ohio Intra-University Council Involving all 14 four year public.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO Hanford Observatory FY2001 Budget Request Fred Raab October 3, 2000.
LIGO-G W LIGO Hanford Observatory Manpower Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Five-Year Mass Transit Fund Financial Forecast April 6,
CIRA Budget Overview Lance Noble, Finance Manager May 6, 2015.
LIGO-G L Peter Fritschel & Michael Zucker PAC18 meeting LIGO Livingston Observatory 18 May 2005 S5 Run Performance Goals.
CIT/MITLIGO-G P1 Advanced LIGO Operating Budget (FY 2009) Philip E. Lindquist NSF Review of Advanced LIGO June 11-13, 2003.
Managed Services. True Managed Services What’s the Difference? Monitoring Software sits on customer network and “watches” Software alerts based on pre-defined.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Operations & Administration Rick Finnegan April 22, 2008.
9.6% of the calls to Helpdesk did not stay on the phone long enough to get help.
IT CAREERS Prepared by: Careene McCallum-Rodney. Computer Technician  Computer technicians:  install,  repair,  maintain,  and analyze many different.
South Seattle Community College BUDGET HEARING Fiscal Year June 7, 2005.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
PCGRID ‘08 Workshop, Miami, FL April 18, 2008 Preston Smith Implementing an Industrial-Strength Academic Cyberinfrastructure at Purdue University.
Budget Proposal MISSION STATEMENT We will support student achievement by developing and sustaining exemplary educational experiences; creating.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Wireless LAN Expansion Proposal Presentation to the UTFAB Monday, March 5, 2007 Scott Baily, Associate Director for Networking,
LIGO-G L LIGO Livingston Observatory Mark Coles Observatory Head LIGO Livingston Observatory California Institute of Technology.
Public Meeting on ERCOT’s Proposed 2004 Budget September 3, 2003 Preliminary - Subject to ERCOT Board Approval.
Building and Maintaining Regional Optical Networks Gregg Shepperd Principle Services Product Manager, Fujitsu Internet2 Spring Conference April 25, 2007.
Markland J. Benson, Computer Systems Manager, White Sands Complex, (575) , Technology Infusion of CodeSonar into the Space.
South Seattle Community College BUDGET HEARING Fiscal Year June 6, 2006.
1 Managing the development and purchase of information systems (Part 3) BUS Abdou Illia, Fall 2005 (Week 12, Wednesday 11/16/2005)
April 25, 2002 LIGO-G L Mark Coles1 All hands meeting topics Modification of the reporting structure Broadening staff participation in commissioning.
LIGO-G M Management and Operation Plans/Budget Stan Whitcomb NSF Annual Review 8 November 2004 Caltech.
Page 1Coles – LIGO at Livingston PAC 9 Dec , 2000 G L LIGO at Livingston Mark Coles.
Total Cost of Ownership for Technology Resources at Mission College Description and Recommendations.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
ORGANIZING IT SERVICES AND PERSONNEL (PART 1) Lecture 7.
Public Works 1 FY 2013 Sources and Uses. Public Works 2 FY 2013 Sources and Uses.
Service excellence for customers world-wide The Cost Of Test: A Perspective from a Test Service Provider SETNET User Group 21 February,
February 26, 2001LIGO-G B-P1 LIGO Future Operations (FY ) Budgets, Schedules, and Milestones NSF Review February 26, 2000 Hanford, Washington.
Community Activities Budget Justification, Proposal All costs are inflated at 2.5% / year. Costs in years 2 and 4 are higher to hold SITS. Direct Costs:Year.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
LIGO-G E PAC9 Meeting LIGO Laboratory at Caltech 1 The LIGO I Science Run Data & Computing Group Operations Plan 9 th Meeting of the.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
LIGO PAC11, Nov 2001 Syracuse proposal to NSF LIGO-G Z 1 Proposal to NSF: “Research in Gravitational Wave Detection with LIGO” Peter R.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
Distance Learning and Telemedicine Grant Program Terry L. Kokinda General Field Representative-Tennessee USDA, Rural Utilities Service Loan Origination.
Mandatory Fees at UMBC Overview on Mandatory Fees for Graduate Program Directors April 10, 2013.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
ADC Operations Shifts J. Yu Guido Negri, Alexey Sedov, Armen Vartapetian and Alden Stradling coordination, ADCoS coordination and DAST coordination.
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
Jeff Kern NRAO/ALMA.  Scaling and Complexity ◦ SKA is not just a bigger version of existing systems  Higher Expectations  End to End Systems  Archive.
Chapter 1 Computer Technology: Your Need to Know
Managing the Delivery of Information Services
City Council FY 2017 Recommended Budget
LQCD Computing Operations
Cost Concepts and Design Economics
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Preliminary Proposed Budget April 26, 2016
EVLA Operations Jim Ulvestad
Division of Business & Finance Accounting Services Information Technology and Plant Operations 2017 Budget Hearing April 22, 2016.
Milpitas Unified School District
Presentation transcript:

Page 1 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Operating the Observatories Mark Coles

Page 2 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Motivation for presentation Costs to operate the LIGO sites increase in 2002 and beyond. One might think the costs should decrease, since installation work will have concluded I will describe factors contributing to anticipated increased costs for observatory operation

Page 3 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Roadmap for presentation 1.Brief overview of FY2001 operations budget. –“Fixed” costs. –“Variable” costs related to activity. –FY2001 budget is based on experience with site operations since FY97. We have developed a fairly mature understanding of fixed costs needed to sustain the sites. 2.Comparison of budget requirements for round-the- clock operation in FY02 with installation and commissioning requirements in FY01.

Page 4 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L FY2001 Operations Budget Fixed Costs –Approximately 50% of budget is resident staff labor 7 scientific staff (including LDAS scientist installing/commissioning system) 6 engineering support – 2 software, 1 ea: vacuum, optics, electronics, facilities (maintain installed infrastructure) 9 operations/tech support (specialists in network support, electronics, vacuum, optics, etc.) transition to become operators –Approximately 20% of budget is for building and site maintenance, utilities, etc. (more at LLO where utility costs are higher) –Approximately 5% of budget is for vacuum system operation at each site (more at LHO where system is larger – includes LN purchases) –Approximately 4% of budget supports computer and network operations at sites – (includes maintenance contracts and supplies) –Approximately 3% of budget is for phones, administrative supplies, incidental electronics and optics supplies. –Approximately 3% other miscellaneous expenses (repairs, travel by site staff, etc.) Fixed Costs total approximately 85% of FY01 Operations Budget

Page 5 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L FY2001 “Variable” Costs Approximately 15% of budget at each site needed to complete installation/commissioning (more in percentage and absolute values at LHO since 2 IFO’s) –Approximately 7-10% of budget supports travel to sites (again more at LHO where there are two IFO’s)

Page 6 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L FY2001 Operations Budget One might expect operating budget to decrease by about 5-8% at conclusion of commissioning –Elimination of installation costs for tooling, supplies, services, contract labor related to installation –Travel should remain about the same level to support campus participation in data taking But there are also budget increases that occur

Page 7 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Major Contributing Factors to Proposed Budget Increase Costs stated relative to FY01 site operations budget: +15% (~$1380 annually) –Replacement of control and data acquisition electronics on 4 year cycle –recommended by NSF review panel +6% (~$540K annually) –Networked data distribution via OC3 –recommended by NSF review panel +6% (~$515K annually) –Maintenance and replacement of control room computer eqpt, custom electronics, and embedded controllers. –Represents about 10% of total value of control room computers and 5% of total value of custom electronics and VME controllers

Page 8 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Major Contributors to Proposed Budget Increase (ctd) Costs stated relative to FY01 site operations budget: +11.5% (~$1062K annually) Labor: –+6% - Operations personnel to staff continuous running of the interferometer and to support around the clock analysis and management of data on-site –+3% - Additional resident scientific staff at each site to provide effective liaison to utilize LSC visitors. To effectively utilize LSC visitors so they can be productive requires some investment of time by site staff to work with them, coordinate visit, etc. A small investment by LIGO to get leverage a big payoff from LSC –+2.5% - An explicitly dedicated outreach budget with material and labor support

Page 9 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Detail - Staffing Increment to Support Full Time Operation Operating philosophy: 2 operations specialists per 8 hour shift, plus scientific staff –Level of scientific staff coverage to be dictated by experience – most likely at least one scientist per shift for initial operation (requires visitors from campuses to sustain this), and hopefully reduced coverage if/when operations become routine. –Role of scientist is to be the “eyes and ears” of the scientific community that will analyze the data – identify what are unique features of interferometer, environment, configuration, etc. That should be known by those looking at the data. Important to maintain travel budget from campuses to sites to fully support this role Around the clock operation requires 9.7 operations specialists vs 9 budgeted during commissioning phase – assuming normal operation, no training courses, flu epidemics, etc. –Additional operating staff needed to make operation robust; handle exceptional conditions

Page 10 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Staffing Increment Detail (ctd) +2 FTEs each site to staff control room operations and other repairs, calibrations, LSC liaison +1 FTE each site: Full time systems administration for general computing (now being done part time by operators) +1 FTE each site: Staff to support 24 hour LDAS operation –Present budget has one scientist dedicated to installation and commissioning of system –Additional tech support required for system support and maintenance and for data management, “data librarian” to manage data distribution +1 FTE each site: LSC liaison scientist. +1 FTE each site: Outreach staff

Page 11 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Budget Summary FY02 budget deltas for recurring operations: –-8%elimination of installation costs –+21%replacement of computing and electronic hardware –+6%network distribution of data –+11% labor to support 24x7 operation and outreach NET INCREASE: ~30% recurring Additional $506K (non-recurring) for engineering of active seismic isolation system for LIGO upgrade (2 years only)