OTE Building PMG Report June 25, 2012 Rhonda Merchut 1.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Project Planning: Assembling a Mortenson “Integrated Work Plan”
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR April 25, 2014.
Contamination Cleanup Grant Program Implementation Workshop.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Muon Campus AIP Review MC-1 Building GPP Update Russ Alber FESS Engineering January 23, 2013.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Project Close Out CTC-470.
Project Management Richard Ravin NAU MBA Agenda  Background  Current Position Home Building Business  Project Management vs. Program Management.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
4th Quarter Contractor Business Meeting December 5 th, 2014 Yesika L. Kain Plant Engineering Facilities Session.
Greenfield District Utility/RR Engineer, INDOT
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Office, Technical, & Education Building at the Illinois Accelerator Research Center Fermi National Accelerator Laboratory WFO FRA Robert Kephart-
CDF Decommissioning Status Jonathan Lewis D&D Task Force 22 November 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011.
State Home Construction Grant Program 2014 Grant FundingGrant Program Timeline Grant Application and Award Update.
Redevelopment Grant Program Implementation Workshop Spring 2010.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – April 2007 Construction Workshop 24 April 2007.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Construction Review LaVon M Marshall Greenfield District Utility/RR Engineer, INDOT June 11, 2015.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
Muon Campus MC-1 Building GPP Update Russ Alber FESS Engineering November 28, 2012.
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Task Manager Construction Coordinator Training -- EMS-- Fermilab 95% of Asbestos found is either Amosite or Chryosotile95% of Asbestos found is either.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
Office, Technical, & Education Building at the Illinois Accelerator Research Center Fermi National Accelerator Laboratory WFO FRA Robert Kephart-
OTE Building PMG Report March 2, 2012 Rhonda Merchut 1.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
OTE Building PMG Report 02/07/2011 (December 2010 & January 2011 update) Rhonda Merchut.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
UW Medicine Lake Union Phase 2
CONTRACT DOCUMENTS & CONSTRUCTION
Prince Frederic Hall Tech One Lauren Kandt PSU AE Construction Sowers
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Hopewell Valley Regional School District
David Salazar, Chief Facilities Executive
SNC/SCANA – New Build Configuration Management
CONVENTIONAL FACILITIES STATUS
Construction Considerations
FIVE PROJECT PHASES.
CONVENTIONAL FACILITIES
Conventional Facilities
Presentation transcript:

OTE Building PMG Report June 25, 2012 Rhonda Merchut 1

Agenda Coordination OTE Building Project State Activities Fiscal Schedule HOK status Summary Action Items 2

3 IASU Update Finishing punchlist work. TeV D&D Coordination Continued schedule coordination – working with OTE construction subcontractor to finalize dates for interior CDF work.

CDF Refurbishment Revised project scope to be developed with consideration of ORKA. – Upgrade to crane controls – may be required sooner than current CDF schedule – Cooling evaluation on-going – Means of egress evaluation – exit over berm? – Assembly Hall floor elevation 706’ vs 710’ 4

OTE Building Status: Subcontractor’s QC & Safety Plans finalized. Schedule refinement, reporting, and cost curve development continues. Shop drawing review underway. LEED procedures & Action Plan development in progress. 5

OTE Building Construction Status: Existing utilities relocated for CDF tie-in. Crane stop modifications for bridge complete subject to final field verifications. Julies completed, Excavation permits issued. Underground utility work underway. Chiller relocation underway Buffalo Wallow ditch re-grading underway. 6

Mobilize 7 Construction Fence Existing Utility locates New Utility/Caisson locates CDF Exit Protection

8 Erosion control Bike path detour

9 Buffalo Wallow storm drain cleanup

10 New Storm & San Sewers

11 Existing Chiller relocation

Two Week Look Ahead Complete chiller relocation Jet out existing storm line Continue site utilities Remove section of CDF ramp wall for caisson – ramp will remain operational Mobilize and install 36 caissons - 4/day – Coordinate w/TD, CDF 12

State DCEO Activities Quarterly Report Due 6/30/12: $185K costed primarily for T&M, A/E construction support, burden. DCEO line item revised budget to be submitted for required Budget Modification Request based on Barton Malow schedule of values 13

Revised Budget 14 As required by the State Grant Recovery Act, the grants were required to be fully obligated by 5/31/12. NO CONTINGENCY FUNDING REMAINED Final HOK change order T&M reduced Does not reflect SA-1

Contingency Management Sources available to fund change orders: – The IGPP funding can be used for underground interference (manmade) and related site work changes; – De-scope from anticipated T&M work; – De-scope from A/E support work; – DOE backstop; – De-scope from main construction work (will not recover all funds); – Value engineering main construction work 15

Contingency Opportunities status: SA-1: $68,333 credit to construction contract – De-scope Alt X Ground Floor resin panels – Ceiling grid simplification – Bike detour simplification Omit off-site testing of curtain wall under consideration De-scope T&M: $90K - $71K for design change order (HOK close out) – Native Prairie garden T&M cancelled DOE Guidelines: 3%-8% ($544,560-$1,452,160) 16

Construction 17

Resource Loaded Schedule 18 Pacing MS Major Submittals Construction

Resource Loaded Schedule 19 Construction IGPP

Resource Loaded Schedule 20 Per Subcontract: MS 3 Project Complete 11/22/13 Closeout IGPP

PP Tracking Milestones 21

HOK Status A tentative agreement has been reached. – Legal working on final language – FESS has received deliverables 22

Summary Action Items Evaluate Outfitting needs, costs, and schedule including VoIP. Continue contingency opportunities identification. Revise and submit to DCEO revised line item budget. Continue cost loaded schedule refinement & cost curve development with Subcontractor. Continue shop Drawing, change order review Construction coordination, oversight, tenant coordination. 23