1 Guy Wormser LAL Orsay On behalf of the SuperB Project SuperB Information Day, Strasbourg, 23 September 2011 Status of SuperB Project.

Slides:



Advertisements
Similar presentations
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Advertisements

Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
K. Kumar, W. Marciano, Y. Li Electroweak physics at EIC - Summary of week 7 INT Workshop on Pertubative and Non-Pertubative Aspects of QCD at Collider.
This is the last message in this gathering of North American PI’s with an interest in the INFN hosted SuperB project. I will try to deal with issues on.
Future Planning for SLAC Persis S. Drell. December 5, 2003SLAC Scenarios2 Scenarios Study 2003: Process  Started early in 2003  Inclusive of SLAC faculty,
European approval calendar: ECFA meetings in Sept and Nov – first one is closed, and the Nov. meeting is open. Nakada Com. report in Sept, discuss, and.
David Hitlin US/Canada SuperB Meeting July 25, Super B US/Canada Meeting Introduction David Hitlin July 25, 2008.
Sapienza University of Rome a short presentation ERASMUS STAFF MOBILITY WEEK 2011 Sapienza University of Rome EU Research Programmes and visiting Professors.
SuperB update The next step in flavor physics in Europe.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
CLIC detector & physics study “news from the ET ” Lucie Linssen L. Linssen, IB meeting, 18 April
INFN Site Report Michele Michelotto 1. INFN new statute 2  The Research Ministry requested all the research agencies to present a new statute  Management.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
Guy Wormser, SuperB workshop, 25 July 2006 Super B Factory workshop Round Table Guy Wormser LAL Orsay.
1 Tunnel implementations (laser straight) Central Injector complex.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
CARE Governing Board R. Aleksan CARE Governing Board Meeting, November 25, Introduction et objectives.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Status of the SuperB Project A major new European particle physics project Fergus Wilson, RAL/STFC On behalf of the SuperB Project Beauty 2011, April 8.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
87 th Plenary ECFA Meeting July 2, 2010 SuperB update M.A.Giorgi INFN & Universita’ di Pisa.
New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
ZEUS Physics Overview A sampling of recent physics results –Charged current cross-section –Charm production in DIS –Exotic hadrons (glueballs and pentaquarks)
2 nd workshop on SuperB 16.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Status of the art 2nd Workshop on SuperB.
SuperB Adrian Bevan Recontres de Moriond XLIV, La Thuile, Italy 7-14 th March 2009.
2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Closeout Remarks 2nd Workshop on SuperB FRASCATI.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
SuperB project. The origin: infn roadmap 2006 early motivations – e+ e- after Dafne at LNF – SuperB’s synergy with ILC damping rings.
The SuperB Project A major new particle physics centre Fergus Wilson, RAL/STFC On behalf of the SuperB Project STORI 2011, October 11 th 2011.
Physics activities toward the TDR will be coordinated by A. Bevan, D. Brown, M. Ciuchini and A. Stocchi A document, also in Italian is needed by the end.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Goals for this meeting Marcello A. Giorgi Università di Pisa & INFN Pisa Isola d’Elba XIII General Meeting June 1, 2009.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
The Italian flavor factory reloaded The outcome of the “Fioni review”, the Ministry reaction and the SuperB INFN withdrawal The tau Charm option The current.
XV SuperB General Meeting Caltech Dicember , 2010 SuperB Today M.A.Giorgi INFN & Universita’ di Pisa.
Opening talk Annecy, March 16 , 2010 Guy Wormser LAL Orsay 15 Feb,2009
Meeting closeout Guy Wormser LAL Orsay Orsay February 18,2009
for the EURISOL Steering Committee
(Potential) Site and Utilities
Marcello A. Giorgi Università di Pisa & INFN Pisa
Marcello A. Giorgi Università di Pisa & INFN Pisa
Gybe The superB flagship project failed getting the extra support needed to meet the financial planning of a fresh costing reassessment, even in the case.
with colliding electron-positron beams (Super Charm-Tau Factory, SCT)
HEP with Accelerators Outline Physics in progress Organization
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
3rd Workshop on SuperB SLAC June , 2006
CMS Goal of the experiment
Status of Project Guy Wormser LAL Orsay Tsukuba, March 24,
Site: Roma Tor Vergata Campus
AMICI WP1 – Management, coordination and dissemination
B Factories: a truly remarkable story of competition and collaboration
V SuperB Workshop ENS May 9-11, 2007
Summary of Washington DOE Review
Marcello A. Giorgi Università di Pisa & Pisa
with colliding electron-positron beams (Super Charm-Tau Factory, SCT)
Organisation of the Physics activity toward the TDR
Detector Proto-Technical board Sep 30, 2010
Marcello A. Giorgi Università di Pisa & INFN Pisa
Presentation transcript:

1 Guy Wormser LAL Orsay On behalf of the SuperB Project SuperB Information Day, Strasbourg, 23 September 2011 Status of SuperB Project

Talk outline Physics goal of SuperB in a nutshell The SuperB projet scope SuperB is approved !!! The site has been decided The Cabibbo Laboratory Consortium The accelerator project Formation of the detector collaboration Conclusion

Documentation White Paper "SuperB Progress Reports" –Physics: –Accelerator : –Detector: Guy Wormser Nagoya University July

Flavour physics in the LHC era SuperB very ambitious goal is to unravel the structure of the New Physics and the mechanisms causing its very specific flavor pattern Very good sensitivity to NP thru CP violation asymmetries and rare decays Double-prong attack on the quark and lepton sectors 4 4

A conversation between Flavour Physics and LHC energy frontier discovery program When evidence is found for New Physics at the LHC, attention will turn to understanding the overall framework – Is it SUSY? What type of symmetry breaking? – Is it extra dimensions? Are they warped? SuperB/LHCb will be crucial to an understanding of the flavor sector of any type of new physics –Is there charged lepton flavor violation? –Are there new CP phases ? –Is there a charged Higgs ? –Is there minimal flavor violation in the (s)quark sector? 5

Is there a no-loose theorem? In the assumption of a MFV scenario, is the LHC mass range well covered? Is the sensitivity in the leptonic sector meaningful in the LHC era? The answer is PROBABLY YES if you can integrate at least 75 ab -1 with a Super B machine This requires a luminosity in excess of during 5 years

First indications from the LHC No indications so far of « light » new particles No indications so far of « heavy » Higgs boson No indications so far of BSM signal from initial look in the B s system Critical role for SuperB in a « Standardissimo » picture Guy Wormser Nagoya University July

The machine requirements Guy Wormser INSTR08 conference February

SuperB Luminosity model Guy Wormser La Thuile Workshop March ab -1

SuperB scope The SuperB project covers : –An asymmetric e+e- collider for B, tau and charm physics with a polarized e- beam –A very intense light source with 3, growing up to 10, light beamlines –A SuperB detector –A very large computing system –Site and infrastructure Guy Wormser La Thuile, March

Synchrotron light SuperB SuperB will have very competitive properties as a light source, from its bends or from ondulators

Light from ondulators Guy Wormser Nagoya University July

SuperB as a light source Italian Institue of technology (IIT) in charge of that part of the project Presently writing detailed specifications for the beam lines Initial plan : 3 to 6 beam lines Guy Wormser Nagoya University July

Progetti Bandiera (not by alphabetical order!) March Gennaio 2011 F.Forti - Stato di SuperB 14

Funded Flagship Projects December 2010 Slac January 24, Marcello A. Giorgi

SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has been endorsed by “CIPE” ( the institution responsible for infrastructure long term plans) A financial allocation of 256 Million Euros in six years has been approved for the “SuperB Flavour Factory” Approved !

INFN Triennal plan ( ) 25 Gennaio 2011 F.Forti - Stato di SuperB 17

Key milestones Site choice Summer 2011 Start civil engineering End 2011 Machine end Detector TDR end 2011 Start machine installation Early 2013 First collisions Beg 2016 ( Many machine elements are reused from PEP-II ) Guy Wormser La Thuile Workshop March

Machine cost (from CDR2 document) Machine cost : 238 M€ (without contingency) 190 M€ (M&S + manpower (48 M€) –Takes into account reuse of PEP-II components (replacement value 85 M€) Site cost 130 M€ (without contingency) Total needed 368 M€ (514 M€ with contingency and full VAT) Ressources available around 500 M€ taking into account INFN ressources, manpower contributions, contributions from Russia and from IIT. Guy Wormser Nagoya University July

MOU with SLAC ( July 2011 draft)

SuperB Machine is an international project –Brainpower will come from an international team consisting for the moment of : Italy, US, France, Russia, UK –Detailed project organization ongoing now. Should be ready in the coming weeks –Complete list of Work Packages being prepared. Important responsabilities will be entrusted to foreign collaborators –The matrix of who is doing what should be finalzed asap. Time to join! Marcello A. Giorgi 21

Budget flow At the end of 2010 an initial sum of 19 MEuros has been allocated A sum of 50 M€ has been reserved for 2011 budget Money is ready to flow as soon as the Nicola Cabibbo Laboratory is established. Readjustments likely to happen to reflect the spent-profile

The Tor Vergata site proposal Autonomous interest from a wide community of the University ( not only physicists) Feasibility evaluation perfomed for –Space –Electricity –Water –Permits

Site requirements OK –Extension of the order of square meters –2X150 Kilovolt electric supplies nearby –Water supply adequate and the possibility of additional supply from a number of pits –Vibration measurements: the good surprise –Site archaeology free

SuperB Site LNF About 4.5 Km Tor Vergata University campus

The International Site Review Committee visiting the Tor Vergata site

Detailed site view

Ground x-section Sea level altitude (m) Vegetal soil (topsoil) Grey pozzolanBrown pozzolan Tuff rock Ground water level

Guy Wormser La Thuile Workshop March

Vertical ground motion : is the highway a problem ? NO! Guy Wormser La Thuile Workshop March

The site vibrations are extremely small ! nm all around the ring ! Guy Wormser La Thuile Workshop March Vibration requirement

Official steps On May 24 a presentation to the academic community A letter from the Rector on May 28 making the site available The decision to move with this solution was taken by the May 29 INFN Board of Directors The site has been decided

Recent news for Cabibbo Lab consortium Guy Wormser Nagoya University July

Cabibbo Lab structure Guy Wormser Nagoya University July

SuperB Governance Three phases –INFN: the past and present starting phase –Consortium: as soon as possible (less than a year) as an independent legal entity Following main European infrastructures More flexibility in the organisation Can directly associate foreign partners (EGO like) An “intermediate solution” –European consortium (ERIC): the final structure

Governance A Cern like organisation –A director general and a directorate Departments under director’s supervision –A scientific evaluation committee Science Machine –A finance evaluation committee A known and working scheme

Crab waist for pedestrians In order to get very high lumi, need transverse beam size of nanometer scale To benefit from this, need effective sigma_z very small Extremely hard to do by conventionnal techniques Use long sigma-z at large angle This create vey large indesirable beam-beam effects Get rid of the beam-beam effects by pre- distorsion of the beams!!! Guy Wormser La Thuile Workshop March

Crab waist crossing, a superb idea by P. Raimondi (LNF)

Crab Waist Works: First Experimental Evidence Crab Sextupoles on all the time since the first time we tested them A luminosity of **32 was achievd in DAPHNE, 3 times higher than before, and in good agreement with simulations!

SuperB detector will be built by a « classical » international collaboration The detector will reuse BABAR components and will cost an extra 50 M€ INFN will cover on its own budget around 50% of this cost ~25 M€ will therefore have to be found from international partners. Presently participation of : Italy, Canada, France, Germany, Poland, Russia, Spain, UK, US Guy Wormser INSTR08 conference February

News from the detector ( Guy Wormser La Thuile Workshop March

Formal formation of the collaboration The process to form the detector collaboration has started in June 2011 –First meeting of the protocollaboration board –Setting up of the governance committee Process mostly completed by the end of the year No problem to join now or later Guy Wormser La Thuile Workshop March

Conclusions SuperB project has been approved by the Italian Government! A major project in Europe at the national scale, the first one in particle physics since HERA in the 80s! The site has been officially selected. The construction preparatory work has started The consortium “Nicola Cabibbo Laboratory” is being formed to manage the SuperB project A very ambitious and innovative machine, state-of-the art detector, and an aggressive planning First beams expected in 2016 Come and join to take part in this very exciting endeavour! 43

Slac January 24,2011 Marcello A. Giorgi 44 Extracts from official documents of Italian Government and Italian Parliament Ministerial act sent to parliament on DEC 3, 2010

Machine cost and ressources Guy Wormser Nagoya University July