Comparative analysis of the National Rural Networks (NRNs) in the EU Member States Martin Law Contact Point of the European Network for Rural Development.

Slides:



Advertisements
Similar presentations
Joint Action for ECHIM European Community Health Indicators and Monitoring Antti Tuomi-Nikula National Institute for Health and Welfare (THL), Helsinki,
Advertisements

1 The EPO Co-operation Programme to reorient patent information centres Heidrun Krestel European Affairs, Member States 4 October 2010.
Peer Reviews and new Compendium on CSR Presentation to HLG meeting 20 December 2013, Brussels.
HR 08 IB SPP 02 TWINNING PROJECT “ENHANCEMENT OF CAPACITY FOR EFFECTIVE MANAGEMENT OF EU COHESION POLICY FUNDS” 1 The most significant results of Component.
The Swedish Rural Network and The European Rural Development Network, ERDN Presentation at the Leader Networking Event LEADER: A Collective Perspective.
Guidelines for the administration of axis 4 LEADER 17th July 2014, Nitra Mgr. Veronika Korčeková, MA Ministry of Agriculture and Rural Development of the.
1 Star-net A self-sustainable network to promote the participation of SMEs from NMS+AC on FP7- ICT Theme Dr. Herbert Zeisel (DLR) 4th September 2007, Malta.
Page 1 Key changes relating to Credit Rating Agencies Changes to the ECAI status by January 2014 Key changes due to CRA III from issuer perspective 31.
EIP-AGRI The EIP must bridge the gap between research and farming practice focussing on real, existing issues and research needs from the ‘field’ and involve.
The CAP towards 2020 Implementation of Rural Development Policy State of Play of RDPs Gregorio Dávila Díaz DG Agriculture and Rural Development.
National Rural Development Network and experiences with Leader Implementation in Slovakia.
Jean-Michel Courades, DG AGRI F3 European Rural Development Network
WP3: Peer Learning Activity, 9th/ 10th of April 2008, Vienna With the support of the Lifelong Learning Programme of the European Union 1 Work package 3.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE Foreign Relations Department Projects Group TurkStat Meeting of the Policy Group on Statistical.
Information session first joint ERANID call (Task 5 DOW) Belgian Science Policy Office 30 September 2015.
International Credit Mobility Call for Proposals 2016.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
COCOF Meeting 24th March 2009 Regional governance in the context of globalisation Kai Böhme SWECO ADT Consulting (FR), Archidata (IT), AUREX (SK), Berman.
"The role of Rural Networks as effective tools to promote rural development" TAIEX/Local Administration Facility Seminar on Rural Development Brussels,
EQAVET Secretariat Survey Draft analysis NRPs meeting Oct 2014 NRPs meeting, Brussels October 2014.
Insurance Comparison Websites: EIOPA Good Practices
European Network for Rural Development (EN RD)
2010, European Year for combating poverty and social exclusion
Implementation of the Leader Axis in the EU
Eurojust cases involving crimes against children
ESF transnational calls – Member State plans
Phasing out the use of lead shot in wetlands (1)
5. Areas under organic farming
European Investment Bank Group
Ag.no. 15 Lessons from the 2015 A65 exercise
Erasmus+ Come to study or teach in Europe Erasmus+
GBV survey: progress EUROSTAT 20 March 2018.
Education and Training Statistics Working Group, May 2011
ESS Security and Secure exchange of information Expert Group (E4SEG) DIME/ITDG Item 8 ESS Security Assurance Pascal Jacques ESTAT B2 Local Security Officer.
State of legal transposition (1)
Report on WISE Art.8 and GIS issues
State of play Article 5 reports
MISSOC NETWORK MEETING Amsterdam, 6-7 June 2016
Education and Training Statistics Working Group
Agenda Item 2.1 SES 2014: follow-up
1.
on Priority Substances Strategic Coordination Group
Technical Working Group meeting 21 March 2012 Brussels
Update on legal issues Strategic Coordination Group
2a. Status of WFD reporting
Reporting – Art 17 of HD and Art 12 of BD
Item 8.1 Implementation of the 2016 Adult Education Survey
2b. Status of WFD reporting
Programme adoptions Cohesion Policy:
Item 7.1 – Overview of 2012 UOE data collection
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
Update on legal issues Strategic Coordination Group
WFD River Basin Management Plans :
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
EuroGroups register First results of measures on advancement
Legal and implementation issues update
Meeting of Water Directors State of transposition and implementation
ESS Security and Secure exchange of information Expert Group (E4SEG) Item 1 of the agenda IT security assurance DIME/ITDG SG Meeting London 15/2/20189.
State of Play RBMPs and WISE reporting (9/07/10)
FISIM State of play Agenda Item 3.
Update on implementation WG F 27 April 2010 Maria Brättemark
European Statistical Training Programme (ESTP)
Update on legal issues Strategic Coordination Group 23 February 2010
Update on status of reporting and validation process
Overview of the implementation of the SEA directive
Doc.A6465/14/04 Ag.16 A65 country manuals
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
Transposition and implementation of WFD
LAMAS Working Group June 2015
Financing Natura 2000 Progress with MFF, Pas/Ops and PAFs
Presentation transcript:

Comparative analysis of the National Rural Networks (NRNs) in the EU Member States Martin Law Contact Point of the European Network for Rural Development Brussels, 1 October 2008

Overview of presentation  State of play / timetable  Number of networks  Where the networks are located  Main activities performed by the network  Financial allocation

State of play NRNs fully operational:  BE-FL since 5 December, 2007  DE since January, 2008  DK since 1 March, 2007  EE since May, 2007  FR since April, 2008  FI since October, 2007  IT since April, 2008  LV since 25 July, 2008  LU since June, 2008  NL since October, 2007  SK since 1 October, 2008  SI since April, 2008  SE since May, 2007  UK NRN since June, 2008  UK-ENG since April, 2008  UK-NIE since September, 2008  UK-WAL staff in place from January 2008, and fully operational since April 2008

STATE OF PLAY NRN not quite operational:  HU – NRN starts 1 October Expected to be fully operational soon further to the adoption of legal acts on procedures  CY - the office has been equipped, and a tender for personnel will be published soon

STATE OF PLAY Not yet operational:  AT The tender procedure started in May 2008, final decsion will be taken in October  BE-WAL The tender for the WAL RN made in July and waiting formal approval. Date when operational is not yet known.  BG The tender procedure will be open in early October. The foreseen deadline to establish the NRN is the end of  CZ NRN will be launched by the end of The Action plan of the NRN for the period has already been approved. Now in the negotiation phase regarding the NRN’s methodology.  ES The NRN was approved on 17. July 2008 (Decision C(2008)3857) but is not yet operational. It will be in place by the end of 2008/ early  GR The Ministerial Decision is under preparation.  IE A tender has been published with a deadline of the 5. October The Network will be in place by the end of  LT To be established in November (or December at the latest) 2008  MT There will be a tender procedure. Right now the tender is under preparation in order to establish the necessary structure for running the network which will consist of a permanent secretariat to manage the network and one assistant within the managing authority.  PL To be fully operational by end of 2008  PT To be operational by end of 2008  RO NRN validated on 24 September The Functioning and Organisation Regulation and the Action Plan of the Network was approved. Process for the tender procedure for the Support Unit of the Network (SUN) (that will implement the network) likely to take3-5 months.  UK- SCO informal networks at sub regional level already exist. The inauguration of the Scottish network will take place 21/22 November. The aim is to have the web site up and running early in 2009.

NUMBER OF NETWORKS  One network covering all axes: AT (For the Leader axis, an adequate sub-network will be installed), BG, CY, CZ (The NRN will cover all axes of the Rural Development Programme (RDP) but mainly axis IV - Leader), DK, EE, FI, FR (one network with two levels of implementation, a national one and 26 regional levels- all of them working on all axes)‏, DE (In some of the 'Länder' there will be regional networks, which will be covering mainly axes 3 and 4.), GR, HU, IE, IT, LT, LV, LU, MT, NL, RO, SK, SI, ES, SE (Local Action Groups –LAGs- will have their own network meetings and other activities).  More than one network: BE 2 networks BE-FL, BE- WAL UK 4 regional rural networks are being established The initial co-ordination of the UK NRN between the four countries of the UK was established in June 2008.The UK NRN will identify and focus on the commonalities and gaps between the four country networks.

 Within administration - Member State decides that the Network Unit should be part of the Managing Authority  Outsourced - Member State decides that the tasks of the Network Unit have to be performed by independent bodies selected via public procurement.  Partially outsourced - The Network Unit shall be set up within the administration of the Managing Authority, but, certain functions shall be outsourced partially via one or several contracts WHERE IS THE NETWORK LOCATED?

 Within the Managing Authority: BE-FL, CY, CZ (However a majority of the activities of the NRN are expected to be outsourced), DE, DK, EE, FI, GR, IT, LT, LV, LU, MT, PL, PT, SI, ES, SE, UK- WAL  Outsourced: AT, BE-WAL, BG, IE, NL, RO, UK NRN, UK-NIE, UK-ENG, UK-SCO  Partially outsourced: FR - At the national level, the network steering is done by the managing authority (Ministry of agriculture and fisheries) in partnership with another Ministry (DIACT). Some tasks may be externalised to private bodies through a call for tender. At the regional level there may be organisational differences. SK - The NRN will be located in the Agency for Rural Development (hosting organisation), which is the organisation of the Ministry of Agriculture (partly budgeted by the Ministry of Agriculture). HU - The Governing Unit (Permanent Secretary of HNRN) is going to operate in the Ministry of Agriculture and Rural Development. The Network’s services will be provided by the Permanent Secretary, the Institute of Rural Development, Education and Advisory (background institute of the Ministry), and by External Agency.

MAIN ACTIVITIES  Training – different fields, topics, beneficiaries;  Analysis, information, communication, dissemination and exchange of information (instruments, such as: web-site, leaflets, newsletters, seminars, other promoting methods);  Support for cooperation (study and exchange visits, tools to search for the partners);  Support for the implementation of the RDP.

ADDITIONAL TASKS  Cooperation/Coordination with the European Network (AT, CY, ES, EE, FI, HU, LU, RO, FR)  Support for LAG activities: training, networking, conferences (BE-FL, CZ, PT, SE,UK-WAL); enhancing and supporting the networking between LAGs (MT); building up and strengthening the capacity of Leader LAGs (BG, RO, FR)  Identifying the problems and factors / practices responsible for unsuccessful rural actions ("bottlenecks") in rural development and make authorities aware of them (NL, PT, SI)  Support for inter-institutional cooperation (DE, IT, NL, PL, UK)  Technical assistance for pilot projects (ES)  Survey on the needs in relation to measures under Axis 3-4 (HU), all axes (BG)

ADDITIONAL TASKS cont’d  Focus on specific topics linked with the four axes of RDR (NL, ALL, FR). For example: Identify new and promising initiatives in the area of (multifunctional) agriculture and village development, nature, social cohesion, quality of life and joint co- decision-making (NL); Focus on specific products (local certified/traditional), tourist activities and services, Information technology, promotion of services for farmers (ALL)  The national network will build on existing network structures, further to a mapping exercise of existing smaller networks with the national rural network. (DK)  Consolidation and extension of the Network in the period of implementation of the Rural Development Programme (RDP), (BG)  Information about national and international development possibilities; (HU)  To identify the factors that have hindered cooperation practices, especially within the Leader axe and to establish the set of needs to increase and improve cooperation; (PT)  Database of experts and the advisors (CZ, FI, SI)  Institutional capacity building (BG, RO)

Thank you for your attention!!!