Missouri Waste Control Coalition Environmental Conference July 14, 2015 CCR Rule What Location Restrictions Mean for Missouri.

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
GIS for Environmental Science ENSC 3603 Class 23 4/7/09.
Seismic Code Highlights Determining what level of Seismic Restraints are Required Arkansas Fire Prevention Code 2002 Based on the IBC 2000.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
League of Women Voters of the Piedmont Triad July 18, 2013.
Wetlands  Wetland – “those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Mass Wasting & Subsidence
How to Build a Groundwater Model Activity Source Created by the USA Groundwater Foundation; modified from the Science Olympiad event, Awesome Aquifers.
G3 – Environmental Geomechanics (Dr Sam Yuen)
Clark Matt Aaron. wetlands are lands where saturation with water is the dominant factor determining the nature of soil development and the types of plant.
Wetlands are lands where saturation with water is the dominant factor determining the nature of soil development and the types of plant and animal communities.
Freshwater Wetlands By Caulay Vermeulen. Global Map I could not find a global map specific to freshwater wetlands but this map shows global reservoirs.
Yield Determination Purpose Groundwater Classification Yield Methods Recent Issues.
Section 404 of the Clean Water Act 404(b)(1) Guidelines Field Exercise
Residential Construction Unit 1 Mr. Todzia.  Definition-Legal requirements designed to protect the public by providing guidelines for structural, electrical,
Chapter F.A.C. Updates Solid Waste Program.
Module 7: Construction Phase
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Wetland Creation Why and How Char Ison and Caleb Asbury.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Coal Combustion Residuals Final Regulation August 19, 2015 Frank Ney U.S. Environmental Protection Agency – Region 4.
Missouri Geological Survey Joe Gillman The Central U.S. is Earthquake Country: The Science Behind Earthquakes Hazard Preparedness Response.
CCR Final Rule Utility Perspective on Key Compliance Items
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
FOREST FUNCTIONS FOR DISASTER MITIGATION By: Maj. Gen. Pushpendra Singh, Executive Director, DMI, Bhopal.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
David Dippel, P.G. Frank Zeng, P.E. Waste Permits Division Municipal Solid Waste Permits Section 2015 TCEQ Environmental Trade Fair.
GEOS 348 Environmental Geology. ENVIRONMENTAL GEOLOGY LINKAGES BETWEEN SOUND SCIENCE AND POLICY INTERDISCIPLINARY APPROACH WITHIN THE SCIENCES MULTIDISCIPLINARY.
Inland Wetlands Alternate Names: Marshes, bogs, swamps Presented by: VC and AMB.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Ohio Wetland Real Estate Issues. Definition Definition Federal Regulations Federal Regulations Permits Permits Solutions Solutions Legal Statues Legal.
Environmental Toolbox. Technical Module Introduction.
Lynne Welsh Massachusetts Department of Environmental Protection.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
PowerSouth Energy Cooperative:
USDA Natural Resources Conservation Service “Helping people help the land"
2015 Coal Handling and Storage Conference
Wetlands in the Water Framework Directive main arguments and issues Bruxelles January 29, 2003.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Definitions.
Journal #12 What is an aquifer?
Santa Barbara County LCP Amendment 1-09-A and –B Land Use and Development Code (LUDC) & Rezone Th17 b & c.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Gary J. Pendergrass, PE, RG Midwest Environmental Compliance Conference May 13, 2015 | Overland Park, Kansas USEPA Coal Combustion Residuals Rule: Impact.
Results of the Review of MSW Landfill Regulations from Selected States and Countries Landfill Facility Compliance Study presented to California Integrated.
ENGINEERING CHALLENGES OF SITING RENEWABLE ENERGY AT LANDFILLS Ronald Johnson, PE, GE Brownfields Conference 2011 Philadelphia, PA April 5,
Tailings Dam Stability
Where critical areas & agriculture meet
Department of Environmental Quality
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Numfon Eaktasang ,Ph.D Thammasat University
Environmental Law Fall 2018
Lab Director, Center for Environmental Quality Wilkes University
Scientific or Engineered Landfilling of Waste
Control of Hazardous Energy
INDOT Storm Water Management
RCRA Requirements for Land-Based Units
May 15, 2018 David Paylor, Director
Environmental Law Fall 2019
Presentation transcript:

Missouri Waste Control Coalition Environmental Conference July 14, 2015 CCR Rule What Location Restrictions Mean for Missouri

CCR Rule The Rule establishes five location restrictions to ensure units are appropriately sited. ─Placement above the uppermost aquifer ─Wetlands ─Fault areas ─Seismic impact zones ─Unstable areas Units are prohibited from being sited in these areas unless specific demonstrations can be made. Demonstrations must be made by a qualified Professional Engineer.

Qualified Professional Engineer Qualified professional engineer means an individual who is licensed by a state as a Professional Engineer to practice one or more disciplines of engineering and who is qualified by education, technical knowledge and experience to make the specific technical certifications required under this subpart. Professional engineers making these certifications must be currently licensed in the state where the CCR unit is located.

Placement above the uppermost aquifer ─Applies to new CCR landfills, new and existing CCR surface impoundments, and all lateral expansions. ─The unit must be constructed with a base no less than five feet above the uppermost aquifer. ─Or – must demonstrate that there will not be an intermittent, recurring or sustained hydraulic connection between any portion of the base of the CCR unit and the uppermost aquifer due to normal fluctuations in groundwater elevation.

Placement above the uppermost aquifer ─Uppermost aquifer means the geologic formation nearest the natural ground surface that is an aquifer, as well as lower aquifers that are hydraulically interconnected with this aquifer within the facility’s property boundary. Upper limit is measured at a point nearest to the natural ground surface to which the aquifer rises during the wet season. ─Existing surface impoundments have to complete the demonstration within the prescribed timeframe. ─New CCR units must complete the demonstrations prior to receiving CCR. ─Those units that fail to comply with either standard must cease receiving CCR and close. ─This location restriction generally applies to CCR units located in alluvial settings, rather than upland settings.

Wetlands ─Applies to new CCR landfills, new and existing CCR surface impoundments, and all lateral expansions. ─Units cannot be located in wetlands absent a demonstration by the O/O that ensures the CCR unit will not degrade sensitive wetland ecosystems.

Wetlands ─The term “wetlands” refers to those areas defined in 40 CFR ─Wetlands means those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.

Wetlands ─If in doubt, a wetlands delineation should be conducted by a qualified wetlands scientist.

Fault Areas Applies to new CCR landfills, new and existing CCR surface impoundments, and all lateral expansions. A unit cannot be located within 200 feet of the outermost edge of a Holocene fault absent a demonstration that an alternative setback distance of less than 200 feet will prevent damage to the structural integrity of the CCR unit. Existing surface impoundments have to complete the demonstration within the prescribed timeframe. New CCR units must complete the demonstrations prior to receiving CCR. Those units that fail to comply with either standard must cease receiving CCR and close.

Fault Areas Missouri faults from MGS GeoSTRAT database.

Fault Areas Missouri faults from MGS GeoSTRAT database. Holocene faults (those with movement within the last 10,000 years) are limited to those in the New Madrid Fault Zone.

Seismic Impact Zones Applies to new CCR landfills, new and existing CCR surface impoundments, and all lateral expansions. A unit cannot be located in a seismic impact zone absent a demonstration that all structural components, including liners, leachate collection and removal systems, and surface water control systems, are designed to resist the maximum horizontal acceleration in lithified earth material for the site. Existing surface impoundments have to complete the demonstration within the prescribed timeframe. New CCR units must complete the demonstrations prior to receiving CCR. Those units that fail to comply with either standard must cease receiving CCR and close.

Seismic Impact Zones Seismic impact zone means an area having a 2% or greater probability that the maximum expected horizontal acceleration, expressed as a percentage of the earth’s gravitational pull (g), will exceed 0.10 g in 50 years.

Seismic Impact Zones USGS Seismic Hazard Map

Seismic Impact Zones USGS Seismic Hazard Map

Seismic Impact Zones Demonstration - All structural components, including liners, leachate collection and removal systems, and surface water control systems, are designed to resist the maximum horizontal acceleration in lithified earth material for the site. o Newer units may have design documents which satisfy demonstration. o Older units would need analysis by a seismic engineer with expertise in dynamic soil-structure interaction.

Unstable Areas Applies to new and existing CCR landfills, new and existing CCR surface impoundments, and all lateral expansions. A unit cannot be located in an unstable area absent a demonstration that recognized and generally accepted good engineering practices have been incorporated into the design of the CCR unit to ensure that the integrity of the structural components of the CCR unit will not be disturbed. Existing landfills and surface impoundments have to complete the demonstration within the prescribed timeframe. New CCR units must complete the demonstrations prior to receiving CCR. Those units that fail to comply with either standard must cease receiving CCR and close.

Unstable Areas Unstable areas means a location that is susceptible to natural or human-induced events or forces capable of impairing the integrity, including structural components of some or all of the CCR unit that are responsible for preventing releases from such unit. Unstable areas can include poor foundation conditions, areas susceptible to mass movement, and karst terrains. Recognized and generally accepted good engineering practices means engineering maintenance or operation activities based on established codes, widely accepted standards, published technical reports, or a practice widely recommended throughout the industry. Such practices generally detail approved ways to perform specific engineering, inspection, or mechanical integrity activities.

Unstable Areas What constitutes unstable areas in Missouri? ─Improper fill ─Steep slopes ─Differential settlement ─Shrink-swell potential ─Mines ─Karst

Unstable Areas Karst areas in Missouri

Summary There will be lot of closures, and a need to identify suitable replacement sites. All demonstrations, whether for existing sites or replacement sites, will need to withstand citizen suits. Must find ways to maintain existing coal-fired power plants.

Questions? Gary J. Pendergrass, PE, RG Principal Geological Engineer GeoEngineers, Inc S. Delaware Springfield, MO ph