Magnetic Field Engineering Update CM36 IIT Craig Macwaters 17/6/13 1.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Major items from field affected component list MICE Magnetic shielding review C.Macwaters 23/9/13.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Shielding the Turbomolecular Pump: an update 14 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
MICE CM32 8 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Magnetic Shielding for Tracker components Craig Macwaters – STFC MICE CM33 Glasgow.
MICE CM32 25 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
S A Griffiths CM42 June 2015 Electrical & Control.
MQXC Nb-Ti 120mm 120T/m 2m models
Update of MVD services and requests
MICE Partial Return Yoke Mechanical Design
Introduction Jason Tarrant – Integration Engineering Step IV Removal
as a prototype for Super c-tau factory
Presentation transcript:

Magnetic Field Engineering Update CM36 IIT Craig Macwaters 17/6/13 1

Contents… Tracker shielding can analysis Kiril Marinov (Daresbury) Tracker shielding can prototype Craig Macwaters Tracker individual shields - KM Integration engineering update Jason Tarrant (RAL) 2

Field in AIR x-sect, looking upstream to Q9 PSU Turbo Lid CCG CH ~250G ~400G ~600G 3 The tracker cryo problem… Pink=100mT=1000Gauss

4 Front Weiner PSU ~250G Lid heater box ~15G (need to move ) Cold Head ~350G Turbo side Turbo pump ~50G & Power fail valve Turbo Controller ~150G Cooling fan AFE transformer ~800G Inverted Mag cold cathode gauge ~75G Many sensitive items…

5 What about a big shielding can? Kiril Marinov at DL has worked on magnetic modelling and analysis and full details on modelling website CM looked at physical 2M Slot for waveguides Slot for services 1.2M

Numerical results

7 Interferences

8 Interferences…

9 Step4 – Possible position of shielding cans – still many problems! x x x x X = original position of cryostats New positions approximately 70 to 80 cm further away Shielding can Pure Iron 120cm ID 200cm high 8+cm thick 7 Tonnes each

Position of south cryos Cones represent centre of can Radius approx 60cm Takes up a lot of thoroughfare Half On/Off platform WAVEGUIDE LENGTHS!!

External waveguide (cm) Station ID1 st Set2 nd Set Spectrometer Solenoid model in MICE hall Old IC cryostat model Investigating waveguide reach

12 Henry trying to stretch the waveguides! Real size Cryostat model

13 116cm diameter can – relatively large Half height model

14 Tight routing – right on the limit and this is using empty conduit Real waveguides will be stiffer with smaller bend radius Could we tilt the can & cryostat? Dummy waveguide routing

Possible new position of tracker racks : Ovals show a 7M reach from both cryo pairs Tr2? Tr1? Tr2? Tr1? Tr2? 7M ovals allow a further 2.8M for vertical drops. Making 9.8M total for AFE backplane to VME crate for VLSB cables.

Baseline position for tracker racks (behind North Shield Wall)

17 Tracker rack1? Visualisation of rack behind NSW Checked OK by fire officer Very tight on VLSB cable lengths Need to detail and model Need to move RF Cage east gate

18 Tracker Shielding can summary Heavy, 4 x 7 Tonnes! Floor load? How easily can we move these big cans into and out from the beamline. Under south mezz would not be able to use the crane. Rails? South cryo positions completely foul Jason’s compressor hose distribution Cost 4 x £20K? WAVEGUIDE lengths probably just too short. Could we angle the cryostats inwards? Many issues so we decided to investigate local shielding…

Magnetic shield for Weiner PSU - KM 19

Concept: a shielding box with a pair of “chimneys” B in max <<<B 0 540X620X280 AISI mm thick steel Air outtake, inner diameter 60 mm, outer 80 mm, 60 mm high Air intake, inner diameter 60 mm, outer 80 mm, 60 mm high Top

Design considerations The “chimneys” serve several purposes… Access for cabling Bottom-to-top air convection Possibility of additional fans or using compressed air The position of the air intake/outtake pair does not need to be in the centre. If needed, a second pair could be a added. There is a 50 mm gap between the PSU and the shield. This can be increased, but larger shielded volumes require thicker walls. Heat loss needs to be quantified as it will affect the design

Method The shield is placed between the poles of a window-frame magnet generating uniform field along Z of 30 mT The shield has been rotated around its three main axes and assessed in each configuration Weiner quote the PSU as able to tolerate up to 25 mT. In all the subsequent plots the external field is always along the Z axis.

External field parallel to the air in/outtake axis B(X=0,Y,Z) Approx 5mT

External field perpendicular to the air in/outtake axis B(X,Y,Z=0) Approx 13mT

PSU Shield Summary Three orientations of the structure with respect to applied magnetic field have been considered. With a typical external field of >30 mT the field inside the shielded area is well below the target value of 20 mT. Better shielding can be achieved with thicker walls and longer chimneys. This design show satisfactory shielding with 5mm box. A prototype should be built and tested. This will help with eliminating a number of uncertainties, e.g. model validation, effect of welding on the magnetic properties of the steel, assessing power dissipation etc. Mechanically the box needs to be designed in such a way that opening and closing features do not affect the shielding performance.

Leybold SL80 turbo pump. This is the area that requires shielding Magnetic Shield for turbo pump and vacuum gauge - KM

Turbo shield design considerations The external field is of the order of 40 mT. The pump can tolerate 5 mT, regardless of field direction. The logical proposed solution is a 10 mm thick AISI 1010 capped cylinder, 300X110 mm. Reducing the shielded volume reduces the wall thickness. Halving the shield height has a big impact on performance. As discussed with Craig, dimensions will be finalized when/if the shields are engineered. Need to take account of backing line connection and cooling.

Turbo Shield Concept 300mm Φ110 Φ mm thick AISI 1010 steel ~8 kg Capped lids with aperture

Installation The two halves can be held together by steel bands. The gap can be controlled by a thin gauge during assembly, should not be much bigger than 0.1 mm.

Turbo Shield Performance B B Applied uniform field using window-frame magnet option in Opera. The field inside the shielded area is below the 5 mT limit The 220mm “safe” area can be extended further by 3-4 cm by a adding chimney. The external field is radial The external field is axial. 220mm ~1 mT ~0.5 mT

The vacuum gauge shield 200 Φ110 Φ mm thick AISI 1010 steel ~6 kg The same cylinder as used for the pump, only 200 mm long Φ70

Vacuum Gauge Shield Performance The field inside the shielded area is well below 5 mT. The acceptable limit is 10 mT The 140 mm “safe” area is more than sufficient as the gauge itself is ~100 mm long. The external field is radial The external field is axial B B 140mm ~1 mT~0.5 mT

Turbo & Gauge Shield Summary and further work Turbo pump shield surpasses the design specification of an internal field lower than 5mT, regardless of direction. The shield is ~8 kg, with a wall thickness of 10 mm. Shielding design for vacuum gauge is similar and straightforward 75% of the work on the cryostat shielding is now complete (PSU, pump and vacuum gauge) Cold head shield started, detailed material breakdown known Need to look at magnetic forces on all shielding items as this will inform engineering detail. Need to identify engineering effort Plan to move lid heater box. Require longer thermocouples and lid heater element. Main issue is cassette pressure gauge Also source pneumatic power cut-off valve for insulating vac Have shielding cans for 1553 transformer on AFE PCB

l Move Equipment in Areas of High Risk Compressors feeding cold heads originally located under south mezz were in high magnetic field and required move to west wall. l Rack Room 2 (north shield wall alternative) JT Partial Return Yoke Engineering (Holger to cover this) Integration Engineering update Jason Tarrant

Existing West Wall Existing high power cable to be moved 4 PPS system trunking West wall mezzanine will be this level Services to be moved or bridged by the west mezzanine

Platform, Compressor & Services West Wall Mezzanine Perforated flooring for thermal management < 30m Hoses 19 Compressors for Step IV + 12 for Steps V & VI in stands Air-con Move Cable trays for compressor hoses & power cables from ground floor compressors Cable trays for compressor hoses & power cables from first floor compressors Hose and cable tidy along south mezzanine corridor Control Rack

West Wall Compressor Move l What (Completion Date)  Distribution board move (March 2013)  Design, structural engineering and approval (May 2013)  South west air-con & supply services (June 2013)  Auxiliary equipment crane move (June 2013)  Mezzanine platform build on west wall of MICE Hall (Sep 2013)  Water services, including water plant relocation (Sep 2013)  Services installation & management (Jan 2014)  Some related infrastructure changes(Jan 2014) Lighting PPS Power cables  Compressor stands with integrated power (Feb 2014)  Compressor & services installation and ready to run (April 2014)

Rack Room 2 l Why  Same magnetic field problem as compressors but longer cable & services length available. Move out of the MICE Hall to new Rack Room 2 (RR2) was a logical step.  Allows operational changes and debug without breaking PPS or disrupting running. l Requirements  Capacity in RR2 to eventually house all racks for Step VI  Minimal change to building form as will be returned to ISIS  Fire safe, including services runs  Climate controlled space  Provide safe and easy access to racks

RR2 & MLCR Reconfiguration Existing Rack Room New Rack Room RR2 MLCR Cables Routed Under Stairwell & False Floor Luke Fry / February 2013

Rack Room 2 l What (Completion Date)  Asbestos removal work (May 2013)  Design, structural engineering & approval (July 2013)  Cable ways through walls and cable management (Aug 2013)  Building (doors, apertures, walls) (Nov 2013)  Air management & temperature control (Jan 2014)  Install services, power distribution & electrical (Jan 2014)  False Flooring (rack room and main walkway) & cable trays (March 2014)  Rack installation and ready to run (May 2014)

--- l Extra Slides

Delivery, Assembly & Handling Small equipment crane SS in lifting position with tandem lifting frame Floor plan showing legs of platform and room for delivery and assembly area of the MICE experimental devices Step V & VI stairway change (TBC)

43

Summary Three different strategies for improving shield performance have been considered: Adding a second layer of mu-metal to the steel? Adding steel only where the flux density is higher? Using co-axial cylinders with gaps (quasi-zero-gauss chambers)? Does not work at flux density levels typical for the MICE shielding problem. Works. Allows corrections to be made at a later stage Works. Could be implemented, if needed.