Baseline Global Observation Scenario SDCG-9, Session 3 Gene Fosnight (USGS); Frank Martin Seifert (ESA) 25 Feb 2016, Frascati.

Slides:



Advertisements
Similar presentations
U.S. Department of the Interior U.S. Geological Survey Agency Report, WGISS #22 September 15, 2006 Lyndon R. Oleson U.S. Geological Survey Center for Earth.
Advertisements

SDCG-6 Oslo, Norway October 22-24, 2014 SDCG/USGS: Landsat 7 & 8 SDCG-6 Session 5: Roles and Responsibilities Data flows from CEOS agencies.
Kenya Data Cube Project Plans
Frank Martin Seifert EO Science and Applications Division ESA Earth Observation Programme SDCG-6 | 23 October 2014 | Oslo The European Copernicus Programme.
USGS Core Data Stream Report Session 7: Baseline Global Observation Scenario SDCG-7 Sydney, Australia March 4 th – 6 th 2015.
SDCG-5 ESA/ESRIN, Frascati, Italy February 24-26, 2014 SDCG-5 Session 4 Element 3 (R&D support) Intro Gene Fosnight.
SDCG-7 Session-9 Thursday, March 5, 2015 Country Reports and CEOS Analysis Tools SDCG-7 Sydney, Australia March 4 th – 6 th 2015.
Update on Global Forest Observations Initiative (GFOI) and the Space Data Coordination Group (SDCG) Stephen Briggs & Stephen Ward (Ake Rosenqvist, Frank.
Slide: 1 27th CEOS Plenary |Montréal | November 2013 Agenda Item: 30 Stephen Briggs, Stephen Ward Ake Rosenqvist, Eugene Fosnight, Frank Martin Seifert.
Module 2.1 Monitoring activity data for forests using remote sensing REDD+ training materials by GOFC-GOLD, Wageningen University, World Bank FCPF 1 Module.
The 26th CEOS Plenary – Bengaluru, India October, 2012 Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 Ad-hoc Space.
GEO Forest Carbon Tracking Task Europe (ESA), Australia (CSIRO), Norway (NSC), Japan (JAXA), Canada (CSA), Brazil (INPE), USA (USGS), Thailand (GISTDA)
Global Data Flows Study SDCG-8, Session 6 Frank Martin Seifert (ESA); Gene Fosnight (USGS) 24 Sep 2015, Bonn.
USGS Report U.S. Department of the Interior U.S. Geological Survey Kristi Kline USGS EROS Center.
SDCG-5 ESA/ESRIN, Frascati, Italy February 24-26, 2014 SDCG-5 Session 2 Landsat 7/8 status and 2013 Implementation.
Update on CEOS Support to GFOI S. Briggs, S. Ward ESA, GFOI Office SIT Workshop Agenda Item #9 CARB-3/4/5 CEOS SIT Technical Workshop EUMETSAT, Darmstadt,
Session 10: Space Data Support to GFOI R&D DLR Contributing Data Stream Report SDCG-7 Sydney, Australia March 4 th – 6 th 2015 Helmut Staudenrausch, DLR.
Frank Martin Seifert EO Science and Applications Division ESA Earth Observation Programme SDCG-8 | 23 September 2015 | Bonn Sentinel-1 and -2 Core Data.
Brian Killough / NASA, CEOS SEO SDCG-8 Session 7, Agenda Items 26 and 27 GFOI Space Data Services SDCG-8 DLR, Bonn, Germany September 23 rd -25 th 2015.
U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting October 2004 Attachment D Landsat Status Briefing: ETM+
U.S. Department of the Interior U.S. Geological Survey Mid Decadal Global Land Survey Project briefing to the ScanEx RDC 3 rd International Conference,
Remote sensing and in situ measurements in the Global Earth Observing System of Systems Curtis Woodcock, Boston University.
Space Data Coordination Component Eugene Fosnight on behalf of SDCG Exec Sydney, 2 nd March 2015.
Slide: 1 CEOS SDCG-2 Meeting|Reston, Virginia, USA| September 2012 CEOS Data Acquisition Plan – Global Baseline strategy (Level 1) EO monitoring.
SDCG-3, Sydney, Australia 7 th – 9 th February 2013 Nielsen Park, Sydney, Australia Basic Strategy & Core Data Stream Roles SDCG-3, Sydney 7 th – 9th February.
SDCG-3, Sydney, Australia 7 th – 9 th February 2013 SESSION 2: GLOBAL BASELINE STRATEGY Report Overall Status and.
SDCG-6 Oslo, Norway October 22-24, 2014 Baseline Global Observation Scenario SDCG-6 Session 3 E. Fosnight F.M. Seifert.
GEO Forest Carbon Tracking Outcomes in 2010 Per-Erik Skrøvseth (NSC) Osamu Ochiai (JAXA) Frank Martin Seifert (ESA) Ake Rosenqvist (for JAXA) CEOS Plenary,
SDCG-6 Oslo, Norway October 22-24, 2014 Current Draft of the SDCG 3-Year Work Plan SDCG-6 Session 3, Item #9 G. Dyke SDCG SEC.
Global Forest Observations Initiative (GFOI) Overview Frank Martin Seifert, ESA SDCG-8 Commercial Providers Day, Bonn, 23 September 2015.
U.S. Department of the Interior U.S. Geological Survey Entering A New Landsat Era – The Future is Now Tom Loveland U.S. Geological Survey Earth Resources.
GFOI Status & Issues Sept 2014 Stephen Briggs, Space Data Lead - CEOS SIT Technical Workshop, 16 th – 18 th September 2014.
Baseline Global Observation Scenario SDCG-8, Session 3 Gene Fosnight (USGS); Frank Martin Seifert (ESA) 24 Sep 2015, Bonn.
Spot 5 Take 5 ESA UNCLASSIFIED – For Official Use Frank Martin Seifert EO Science and Applications Division ESA Earth Observation Programmes GFOI/GOFC-GOLD.
Committee on Earth Observation Satellites Stephen Briggs & SDCG EXEC (Ake Rosenqvist, Frank Martin Seifert, Gene Fosnight, George Dyke, Stephen Ward) Plenary.
The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams.
Global Forest Observations Initiative Simon Eggleston GFOI SDCG 5, Rome, Italy, 25 Feb 2014,
Session Introduction Session 7: Baseline Global Observation Scenario SDCG-7 Sydney, Australia March 4 th – 6 th 2015.
Commercial Day – Objectives SDCG-8, Session 1 Gene Fosnight (USGS) 23 Sep 2015, Bonn.
SDCG-6 Oslo, Norway October 22-24, 2014 Baseline Strategy Update for SIT-30 SDCG-6 Session 6: Baseline Strategy Update Element-1 Strategy.
U.S. Department of the Interior U.S. Geological Survey 2015: Presentation is a product of the U.S. Geological Survey. Published by the Aerospace Corporation.
SDCG-6 Oslo, Norway October 22-24, 2014 SDCG Introduction FM Seifert, G Fosnight & SDCG Coordination Office LSI-VC.
USGS Agency Report U.S. Department of the Interior U.S. Geological Survey Kristi Kline USGS EROS Center WGISS-41.
SDCG-6 Oslo, Norway October 22-24, 2014 SESSION 4: Global Data Flows Study Gene Fosnight USGS, Frank Martin Seifert,
Status of Sentinel-3 activities at EUMETSAT SIT-31 Agenda Item # 13 ESA/ESRIN, Frascati, Italy 19 th -20 th April 2016 Committee on Earth Observation Satellites.
SDCG-6 Oslo, Norway October 22-24, 2014 GFOI SPACE DATA COMPONENT Accessing and Analysing Space Data GFOI Open Forum,
Global Forest Observations Initiative
Landsat Analysis Ready Data for LCMAP
Geoscience Australia – data cube progress
SESSION 4: GFOI Space Data Strategy
Global Baseline Data Acquisition
GFOI & SDCG Stephen Ward SIT Tech Workshop 2017 Agenda Item #12
Analysis Ready Data ..
WGISS-43 USGS Agency Report Kristi Kline USGS EROS Center
USGS Status Frank Kelly, USGS EROS CEOS Plenary 2017 Agenda Item #4.14
USGS Agency Update: CARD4L Production Roadmap
Presented by Ron Morfitt, U.S. Geological Survey (USGS)
Committee on Earth Observation Satellites
ARD Needs and Plans for Thematic Pilots
Satellite Sensors – Historical Perspectives
USGS Agency Status Landsat Operations Jenn Lacey 21 July 2016
CEOS Analysis Ready Data for Land (CARD4L) Framework Recap
SESSION 7: SDCG-9 Day 1 Closing, G. Dyke
SESSION 2: GLOBAL DATA FLOWS STUDY
Committee on Earth Observation Satellites
Agency Reports – USGS Jenn Lacey LSI-VC-5 Agenda Item #2 February 2018
GFOI Space Data Needs and Issues
CEOS ARD strategy – and SDCG role
CEOS strategy for GFOI Phase 2
Forest & Biomass (inc GFOI)
Presentation transcript:

Baseline Global Observation Scenario SDCG-9, Session 3 Gene Fosnight (USGS); Frank Martin Seifert (ESA) 25 Feb 2016, Frascati

Session Introduction Overview of 2016 Work Plan Outcomes Overview of Landsat, Sentinel, CBERS, and ISRO missions SDCG-9 Frascati, Italy February 22rd – 26th

Outcome 1: Acquire Data Multiple annual Global Coverages by 2016 of the world’s forested areas – 2016: Multiple global annual coverages of the world’s forested areas from a suite of core mission sensors Optical core missions with free and open data policies – Landsat 7 and Landsat 8 – operational - global – Sentinel-2a – commissioning and operational - global – CBERS-4 – 2014 launch and 2015 commissioning - regional Radar core missions with free and open data policies – Sentinel-1a – operational - global – Sentinel-1b – 2016 launch and commissioning – global – ALOS and ALOS-2 – PALSAR annual Mosaics SDCG-9 Frascati, Italy February 22rd – 26th

Outcome 2: Data Access Efficient and effective global flows of data – 2016: Complete and review global data flow study – 2016: Begin transition to Analysis Ready Data products Optical: Surface Reflectance products Radar: Orthorectified and slope corrected Optical and Radar – Tiled products – Composited products SDCG-9 Frascati, Italy February 22rd – 26th

Outcome 3: Data to Information Global coverage with consistent information products – Identify Space Agency and expert partner information product initiatives relevant to GFOI and MDG. GA Data Cubes ESA Thematic Exploitation Platforms (TEP) USGS Land Change, Monitoring, Assessment and Prediction (LCMAP) FAO SEPAL – Intercalibration and interoperability studies SDCG-8 Bonn, Germany September 23rd – 25th

Landsat 7 & 8 Status SDCG-9, Session 3 Gene Fosnight (USGS) 25 Feb 2016, Frascati

USGS Core Data Stream Report Landsat 7 and Landsat 8 Status Collection Management USGS Sentinel-2 hub SDCG-9 Frascati, Italy February 22rd – 26th

Landsat 7 & 8 acquisitions SDCG-9 Frascati, Italy February 22rd – 26th Landsat 8 Lifetime acquisitions Landsat 7 Lifetime acquisitions Landsat 7 & acquisitions

Landsat 7 status Median: 443 images/day Max: 529 images/day SDCG-9 Frascati, Italy February 22rd – 26th

Landsat 8 status Mid latitude (57°) – 421 images/day – Reject 1.5 image/day – 99.6% High latitude – 226 images/day – Reject 16 images/day – 93.3% SDCG-9 Frascati, Italy February 22rd – 26th

Landsat 7 & 8 combined Best Cloud Cover percent cloud cover <=10>10 & <=20>20 & <=30>30 & <=40>40 & <=50>50 Number of Scenes SDCG-9 Frascati, Italy February 22rd – 26th

Archive Distribution Products SDCG-9 Frascati, Italy February 22rd – 26th

Collection Definition Progress The USGS defined three basic categories of products – NRT (Near-real time) – products that are processed using ancillary data such as predicted ephemeris or bumper mode parameters that may be improved by reprocessing – Tier 1 – products that meet the criteria for the collection definition (i.e. enable time-series stacking, <11.9m RMSEr) – Tier 2 – products that do not meet the criteria for the collection definition and have been processed using the best known ancillary data A single collection (i.e. “collection 1”) for all sensors (excluding MSS) as opposed to a separate collection per sensor

Collection Definition Study Findings Summary Radiometric variability is not a factor – Operational land imager (OLI) temporal uncertainty is better than 0.3% on average Based on on-board calibrator – ETM+ and TM are better than 2% Based on top of atmosphere reflectance measured over pseudo- invariant calibration sites Geodetic accuracy vary by sensor, source data type, the quality of PCD, and level to which the data have been processed (L1T, L1GT, L1G) – Some data (e.g. TMA and LGAC) are of lower quality due to poor quality or missing PCD MSS is highly variable 14

Near-real Time (NRT) Products Three Modes of NRT data collection that do not satisfy geometric accuracy 1.ETM+ products generated using predicted ephemeris data 2.ETM+ products generated that utilize predicted bumper mode calibration coefficients 3.OLI_TIRS products that utilize a preliminary line of sight (LOS) model based on “estimated” position of the scene select mirror. TIRS coefficients will initially be updated periodically, initially quarterly, increasing in frequency to twice per month after sufficient telemetry has been collected These products will be made available for download as soon as they are processed and will roll off the download cache once they become Tier-1 or Tier-2 collection products 15

Tier-1 Collection Definition Summary Need to be geometrically corrected to enable multi- spectral time-series stacking – Geodetic accuracy threshold of less than 11.9m radial root mean square error (RMSEr) based on a post fit analysis of data relative to the Global Land Survey (GLS) 2000 ground control – Results in about 57% of OLI_TIRS – A higher percentage of OLI science are collected over areas without ground control (Antarctic, Coastal Areas, Islands, higher cloud cover) – L1GTs can’t perform post-fit verification to GLS so they are part of the TIER-2 category 73% of all ETM+ 60% of all TM The intent is to make the full Tier-1 collection available for immediate download

Tier-2 Product  Products that do not meet the definition of the collection and have been processed using the best known ancillary data  Definitive ephemeris  Latest bumper mode parameters  Latest TIRS LOS coefficients Data will be made available at the highest processing level through the Tier-2 collection (some low-demand data may be available near-line) 17

Landsat Global Archive Consolidation (LGAC) Over 3.5 Million scenes collected so far Critical goals are data access and data preservation Ingest of Pakistan TM data nearing completion Received and ingested TM data from India Received additional Phase II TM and ETM+ data from ESA Received MSS and TM data from Thailand and Saudi Arabia Continued work with stations to finish delivering data L7 ETM+ image from CUB (Brazil) L5 TM image from KIS (Sweden)

Sentinel-2 from EROS Release awaiting final approval Need to switch from science hub to International hub – current throughput only allows us to pull 30% of new data Releasing as tiles SDCG-8 Bonn, Germany September 23rd – 25th