SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.

Slides:



Advertisements
Similar presentations
23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
Advertisements

DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
The Silicon Vertex Detector of the Belle II Experiment
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
23 July 2012 Thoms Bergauer (HEPHY Vienna) Sensor Irradiations and Testbeams 12 th B2GM Bad Aibling.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
DSSD update. 2Manfred Valentan, 3 rd Open Meeting of Belle27-9 July 2009 Outline DSSD design in Vienna: How it is done First test batch of SVD DSSDs Status.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Logistics 1 – To/Between Assembly Sites M.Friedl (HEPHY Vienna) 2 October 2014.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
Florian Buchsteiner (HEPHY Vienna)
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY.
Electronics & Machine Shop
Schedule So far: academic exercise to check if all makes sense
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Mini-drawers, FE-ASIC , Integrator
Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.
SALTRO16 activities in Lund
SVD group organization, schedule, milestones
Presentation transcript:

SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012

What Happened Since February?  Sensors  Micron delivered trapezoidal sensors with new atoll design  Construction database under development  Ladder assembly  Double-origami ladder built at IPMU, Japan  4 construction sites for series production  Mechanics  Design completed for all layers  Cooling  Detail design converging  Mockup tests ongoing  Electronics  DC/DC converters and other parts tested  FADC design completed, layout in progress 24 September 2012M.Friedl (HEPHY Vienna): SVD Status2 Concerns/recommendations In Feb 2012 BPAC report (all addressed)

SVD Schedule  In early 2012, a detailed schedule was worked out and is now maintained by Christian  More than 200 unique items with dependencies, duration and responsible persons  MS Project & PDF versions are available at  Present schedule: start of physics run on 30 November September 2012M.Friedl (HEPHY Vienna): SVD Status3

24 September 2012M.Friedl (HEPHY Vienna): SVD Status4 Sensors Ladder Assembly Mechanics Cooling Electronics Summary

Sensors  HPK  About 70% of sensors delivered already  Micron  3 new wafers (big trapezoidal + baby sensors) delivered in August 2012  Now with atoll type p-stop very similar to HPK design  Sensor tests show excellent quality  Will be tested in beam & irradiated & tested again in October 2012  Construction Database being developed 24 September 2012M.Friedl (HEPHY Vienna): SVD Status5

Sensors Milestones  HPK  12 November 2012: L3 sensor order  April 2013: L4-6 sensor delivery to be completed  July 2013: L3 sensor delivery to be completed  Micron  November 2012: beam test & irradiation analysis  3 December 2012: place order with Micron  September 2013: final Micron sensor delivery  Ladder assembly starts in July September 2012M.Friedl (HEPHY Vienna): SVD Status6

24 September 2012M.Friedl (HEPHY Vienna): SVD Status7 Sensors Ladder Assembly Mechanics Cooling Electronics Summary

Ladder Assembly Sites  Discussion among all parties during summer 2012 B2GM  Plan for sharing of production:  L3: Melbourne  L4: Tata (at CERN due to export restrictions)  L5: HEPHY Vienna  L6: IPMU  We also agreed that it is important to keep some flexibility in our plan, so that one site can help another if trouble/delay occurs 24 September 2012M.Friedl (HEPHY Vienna): SVD Status8

Ladder Assembly  Single Origami modules (HEPHY, 2010 and 2011)  Double Origami module (IPMU, 2012)  Both: collaborative effort of HEPHY, IPMU and Tata 24 September 2012M.Friedl (HEPHY Vienna): SVD Status9

Ladder Assembly Milestones  Prototype  December 2012/January 2013: full L5 prototype ladder  Thereafter: final optimization of jigs  Series Production  L3 starts in July 2013  L4-6 start in September 2013  Duration 1 year for each layer  SVD Assembly  Starting in September KEK 24 September 2012M.Friedl (HEPHY Vienna): SVD Status10

24 September 2012M.Friedl (HEPHY Vienna): SVD Status11 Sensors Ladder Assembly Mechanics Cooling Electronics Summary

Mechanics  Detailed design for all layers completed 24 September 2012M.Friedl (HEPHY Vienna): SVD Status12

Mechanics: Open Issues  Ladder mount on end rings  Not finalized yet, but converging  Thermal Contact for L3 hybrids  heat pipes look promising 24 September 2012M.Friedl (HEPHY Vienna): SVD Status13

Mechanics Milestones  Collaborative support  Regular “brain-storming meetings” with experienced engineers from MPI Munich & DESY (many thanks!)  Machining support by MPI, DESY and Cracow  Mockups  Exist for all parts (some in early stage, others matured)  Precise (close to final) overall SVD mockup to be built at KEK from November 2012 until April September 2012M.Friedl (HEPHY Vienna): SVD Status14

24 September 2012M.Friedl (HEPHY Vienna): SVD Status15 Sensors Ladder Assembly Mechanics Cooling Electronics Summary

Cooling  Cooling Mockup at DESY  Operated with XFEL CO2 unit (similar to MARCO which will become available by the end of 2012)  Distribution & Routing  Number of lines is defined  First design for manifolds and routing available, to be optimized for available space and cable paths  2 options for transfer lines  Expecting close-to-final state in September 2012M.Friedl (HEPHY Vienna): SVD Status16

24 September 2012M.Friedl (HEPHY Vienna): SVD Status17 Sensors Ladder Assembly Mechanics Cooling Electronics Summary

Electronics: Front-end  All Origami versions and most other parts (edge hybrids, pitch adapters) are ready  Remaining parts can simply be derived from existing designs and will be ready by the end of 2012  New idea: all barrel sensors to be read out with Origami? 24 September 2012M.Friedl (HEPHY Vienna): SVD Status18

Electronics: Junction Box  Junction Box 24 September 2012M.Friedl (HEPHY Vienna): SVD Status19  Rad-hard DC/DC converters instead of regulators  Tested with APV25 hybrids: no noise penalty

Electronics: FADC Milestones  FADC  Design completed  Analog & digital level translation boards built and tested OK  Now working on PCB layout  Surrounding components  FADC Controller, Buffer, Backplane  Will be designed after FADC  Full prototype system to be built in Q1/2013  Based closely on existing readout system built in 2007  Big system test with PXD and beam in October DESY 24 September 2012M.Friedl (HEPHY Vienna): SVD Status20

Electronics: FTB (DAQ Link)  Firmware development ongoing  Optical link tests at 2.54 and Gb/s successful  Second iteration of PCB for minor corrections underway 24 September 2012M.Friedl (HEPHY Vienna): SVD Status21

24 September 2012M.Friedl (HEPHY Vienna): SVD Status22 Sensors Ladder Assembly Mechanics Cooling Electronics Summary

 Lots of progress in all fields  Detailed (and maintained) schedule available on the web  Sensors  all deliveries to be completed in 2013  Ladder assembly  Prototype ladder in early 2013, series production in late 2013  Mechanics  Overall geometry solved, now optimizing details  Cooling  Mockup tests at DESY  Electronics  DC/DC converters tested OK, FADC layout in progress 24 September 2012M.Friedl (HEPHY Vienna): SVD Status23