Overview of harvesting system Planning Falling and bucking Transport Loading Yarding Unloading Road construction.

Slides:



Advertisements
Similar presentations
Trail Bridges – A Common Sense Approach to Selecting Bridge Sites Presenter: James Scott Groenier, P.E. Project Leader, MTDC, WIT Prepared for: NOHVCC.
Advertisements

Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
Site Grading Site Grading Civil Engineering and Architecture
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Earthwork Operations & Equipments
Timber Harvest Planning Course Learning Objective: Be able to describe the harvest planning process including different levels (or types) of harvest plans,
Chapter 3 Measuring Excavation and Sitework
Measuring Sitework, Excavation, and Piling
Earthmoving Materials and Operations
Advanced Hydrogeology Malcolm Reeves Civil and Geological Engineering.
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
Drainage Channel Restoration Construction Project Wood Co. Engineer’s Office Great Lakes Protection Fund A.D. Ward, D. Mecklenburg, R. McCall, D.J. Mears.
Lecture 3 Earthmoving Materials
CTC-375 Construction Methods
Chapter 13 Site Plan Layout.
Trimble  Quantm  Haul Road Optimization Presenters Name.
Functions of Several Variables. Constructing Functions of Several Variables The temperature at points in the xy-plane is proportional to the square of.
Trebuchet Design Project ENGR-5 Fall 2003 Professors Gary M. Litton and Michael Golanbari Matt Ritchie Hoan Cai Rong Srey Thienan Nguyentan.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Wes Marshall, P.E. University of Connecticut March 2007
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Planning for Earthwork Construction
Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart.
1 FRPA Quiz Show Harvesting & Roads Module FRPA Training Program February 2004.
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
Highway Route Surveys And Location
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Road Construction Technology
Highway Subgrade (1) Introduction
Earthwork & Volumes Spec Requirements End Areas End-area Volumes
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
Soil And Rock General Soil Characteristics Trafficability – ability of soil to support weight of vehicles under repeated traffic –Controls traffic on unimproved.
SMART MINING How can we be good managers of Earth’s mined resources and make smart choices for today and the future?
Watershed Analysis Presented to the Washington State Forest Practices Board By Mary McDonald and Marc Engel Department of Natural Resources, Forest Practices.
Western Program Highlights Presentation to FERIC Wildland Fire Detection Workshop June 6, 2006 Presentation to FERIC Wildland Fire Detection Workshop June.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
Trimble GCS900 Grade Control System. Definition: Construction The act or result of – Conceptualizing (we need a airstrip) – Interpreting and planning.
Transportation Complete the notes page provided for you over Ch. 26.
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
Dr. T.N.Singh Professor Rock Mechanics, Natural disaster, Climate change, Mining Research, Surface Mining.
Overview of harvesting system Planning Falling and bucking Transport Loading Yarding Unloading Road construction.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
The Force of Moving Water
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 12 Earthwork.
The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Highway Engineering CE 431
Simplex Method for BLENDING OF AGGREGATES The contract specifications of a building project require that the course aggregate grading for concrete mixing.
Site Grading Site Grading Civil Engineering and Architecture
Supervised by Dr. Sami Hijjawi Prepared by Hamza Saifan
Various Fields in Civil Engineering By R.Janani
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF BRIDGE PROJECTS
Long sections eg road cuttings Deep sections eg basement excavations
Costs: Harvest and process: $20-$30 per dry ton.
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF HIGHWAY PROJECTS
Marcellus Well Pad Constructability
Costs: Harvest and process: $20-$30 per dry ton.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Kastanis- Existing Conditions
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
DESIGN PROCEDURE FOR UNDERGROUND QUARRIES
CONSTRUCTION OF NEW AND REHABILITATION OF EXISTING NON-MOTORISED FACILITIES IN BIRKENHEAD Contract number. 206Q/2017/18.
Presentation transcript:

Overview of harvesting system Planning Falling and bucking Transport Loading Yarding Unloading Road construction

Planning Reconnaissance Road and cutblock layout Permits Contract management

Need to know for road layout Constraints imposed by; Users Environment (wildlife, hydrology, geology…) Construction methods Economics (delivered wood cost compared to value) Design methods Grade and centerline layout Curve layout Crossing design Mass haul

Road Construction Subgrade Ballast (surface course) Crossings

Need to know for road layout Environmental constraints Users, productivity and safety (dictates geometry of road) How much material (and what type) has to be excavated and moved? What structures have to be constructed What is the cost

Example Road Cost (5m stabilized road surface) CriteriaCost $/lineal meter No rock, 0 -1m cut at centerline30-50 No rock,1-3m cut at centerline50-70 No rock, 3m cut at centerlineDetailed estimate Toe rock, 0 -1m cut at centerline50-70 Toe rock,1-3m cut at centerline70-90 Toe rock, 3m cut at centerlineDetailed estimate Rock at CL, 0 -1m cut at centerline70-90 Rock at CL,1-3m cut at centerline Rock at CL, 3m cut at centerlineDetailed estimate End Haul cost depends on volume removed and distance to spoil site Ballasting cost will depend on quarry or fluvial deposit