What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.

Slides:



Advertisements
Similar presentations
PM – TECHNICAL ANALYSIS WORK BREAKDOWN STRUCTURE PRESENTED BY: RASHMI TAK PGDM 09/40.
Advertisements

NEES Project Management Workshop June 16 June 18 1 Segment 3.
Project Planning and Scope
Presented by Heorot.net.  Understand the need for a PenTest Methodology  Identify the most-used methodologies  Understand Advantages and Limitations.
Project Scope Management
Project Scope Management
Elisati Hulu. Definition  “a deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project.
Projmgmt-1/17 DePaul University Project Management I - Work Breakdown Structure Instructor: David A. Lash.
Chapter 5: Project Scope Management
2. Discussion question It has been suggested that more ethical mistakes result from failure of imagination than from failure of moral principle. If you.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Project Management Session 7
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Planning & Organising two Introduction to WBS Work Breakdown Structure Presenter Tony Bosnich Adapted from Taija Puolitaival Oct 2014 © Unitec New Zealand.
Chapter 5: Project Scope Management
Chapter 5: Project Scope Management J. S. Chou, P.E., PhD.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Work Breakdown Structure Workshop
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
Development plan and quality plan for your Project
Project Scope Management
Planning. SDLC Planning Analysis Design Implementation.
Project Management Body of Knowledge PMBOK
Advanced Project Management Project Plan Templates
Work Breakdown Structure
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Statement of the Work SOW By: Wilmer Arellano FIU Spring 2008.
Project Management.
Work breakdown structure
Project Scope Management Process
Chapter 5: Project Scope Management Information Technology Project Management.
Chap 4 Defining The Project.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
Work Breakdown Structure (WBS) Development
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Week 2 Seminar: Project Scope Management
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Work Breakdown Structure Use and Demo
PLANNING ENGINEERING AND PROJECT MANAGEMENT
GLOBAL SCHOOL OF PROJECT MANAGEMENT UNIVERSITY FOR INTERNATIONAL COOPERATION Ing. Osvaldo A. Martínez Gómez, MAP, MSc. Essential Topics - Project Management.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
WBS-Construction of House cont. Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept Earlier.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Part II Lecture 11B.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
WBS Work Breakdown Structure © Unitec New Zealand.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
WEEK 3 Project Planning.
Information Technology Project Management, Seventh Edition.
Creating a Work Breakdown Structure with Microsoft Project.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Breakdown Work Structure Applying Management Tools to a Project.
By Wilmer Arellano Spring 2010
Project Management BBA & MBA
Systems Analysis and Design in a Changing World, 4th Edition
Chap 4 Defining The Project.
Work Breakdown Structure
Project Management.
Project Management Process Groups
Presentation transcript:

What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task list and a schedule can be constructed. Tasks and schedules are better handled in other ways, for example by using Gantt charts. A Work Breakdown Structure can show you at a glance: What the various elements of the project are How the necessary work is distributed between the elements of the project How the cost or budget is distributed between the elements of the project How the larger elements of the project are subdivided into smaller ones But it does not say anything about individual tasks or the order of execution.

The common elements identified in MIL-HDBK-881A, Appendix I are: Integration, assembly, test, and checkout; Systems engineering; Program management; Training; Data; System test and evaluation; Peculiar support equipment; Common support equipment; Operational and site activation; Industrial facilities; and Initial spares and repair parts

The 100% Rule...states that the WBS includes 100% of the work defined by the project scope and captures all deliverables – internal, external, interim – in terms of the work to be completed, including project management. The 100% rule is one of the most important principles guiding the development, decomposition and evaluation of the WBS. The rule applies at all levels within the hierarchy: the sum of the work at the “child” level must equal 100% of the work represented by the “parent” and the WBS should not include any work that falls outside the actual scope of the project, that is, it cannot include more than 100% of the work… It is important to remember that the 100% rule also applies to the activity level. The work represented by the activities in each work package must add up to 100% of the work necessary to complete the work package. Practice Standard for Work Breakdown Structures (Second Edition), published by the Project Management Institute, ISBN 1933890134, page 8

Level of Detail The first is the "80 hour rule" which means that no single activity or group of activities to produce a single deliverable should be more than 80 hours of effort. The second rule of thumb is that no activity or series of activities should be longer than a single reporting period. Thus if the project team is reporting progress monthly, then no single activity or series of activities should be longer than one month long. The last heuristic is the "if it makes sense" rule. Applying this rule of thumb, one can apply "common sense" when creating the duration of a single activity or group of activities necessary to produce a deliverable defined by the WBS. A work package at the activity level is a task that: can be realistically and confidently estimated; makes no sense practically to break down any further; can be completed in accordance with one of the heuristics defined above; produces a deliverable which is measurable; and forms a unique package of work which can be outsourced or contracted out.

A Work Breakdown Structure is not an exhaustive list of work A Work Breakdown Structure is not an exhaustive list of work. It is instead a comprehensive classification of project scope. A WBS is neither a project plan, a schedule, nor a chronological listing. It is considered poor practice to construct a project schedule (e.g. using project management software) before designing a proper WBS. This would be similar to scheduling the activities of home construction before completing the house design. Without concentrating on planned outcomes, it is very difficult to follow the 100% Rule at all levels of the WBS hierarchy. A WBS is not an organizational hierarchy. Some practitioners make the mistake of creating a WBS that shadows the organizational chart. While it is common for responsibility to be assigned to organizational elements, a WBS that shadows the organizational structure is not descriptive of the project scope and is not outcome-oriented. See also: responsibility assignment (RACI) matrix (also called a Staffing Matrix). WBS updates, other than progressive elaboration of details, require formal change control. This is another reason why a WBS should be outcome-oriented and not be prescriptive of methods. Methods can, and do, change frequently, but changes in planned outcomes require a higher degree of formality. If outcomes and actions are blended, change control may be too rigid for actions and too informal for outcomes. A WBS is not a logic model. Nor is it a strategy map.

Multi-Level Decomposition   0          XYZ Project 1          Support 11        Program Management 12        Implementation (Release) Management 13        Logistics Management 14        Technical Management 2          Product Development 21        Systems Development Environment 22        Communications Product Group 23        Office Automation Products Group 24        Business Application Products Group 25        System Management Products Group 26        Release Package Products Group 3          Implementation 31        Implementation Preparation 32        Release 1 - Transfer to Operations 33        Release 2 - Transfer to Operations 34        Release 3 - Transfer to Operations 4          Operations and Maintenance 41        Help Desk Services 42        Application Support and Maintenance 43        Operations Support

WBS Dictionary (First Level) 1          Support   This WBS element includes all management activities that typically span the entire project and are estimated in terms of level of effort rather than by reference to the specific work products produced. These include Program Management, Implementation (Release) Management, Logistics Management, and Technical Management. 11        Program Management This WBS element includes all management tasks at the level of the entire project including organizing, directing, coordinating, and controlling all of the resources required to accomplish project objectives, cost/schedule performance management, subcontractor management, and quality management. 12        Implementation (Release) Management This WBS element includes all of the effort to plan, control, and execute the implementation of all releases. 13        Logistics Management This WBS element includes all of the effort to establish and maintain a logistics support and provisioning program, including, for example, supplies, storage, spares, and repairs of material used by the project.  Material includes commercial off-the-shelf (COTS) software, and other tangible supplies. 14        Technical Management This WBS element includes all of the effort to direct and control the technical engineering effort to transform the operational needs into a specification of requirements and an optimum configuration, including risk and issue management and configuration management.