Human Research Facility HRF Ultrasound Training 1 Neil Travis Johnson Space Center 2010 HRF Ultrasound Training Instructor:Neil Travis 281-218-3239

Slides:



Advertisements
Similar presentations
How to hook up a Projector to a Laptop
Advertisements

© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 6 1 Chapter 6: Laptops and Portable Devices IT Essentials: PC Hardware.
Data Projector Setting Up/Connecting Laptop & Data Projector.
PC PASSPORT SPREADSHEET BEGINNERS LEARNING OUTCOME 1.
Opening the Chassis There are two screws at the top of the system and three at the base that should be removed to enable to (Delete) removal of the rear.
CHDD BOL Equipment Primer Rooms CD 326 & CD 391 Behavioral Evaluation Center Behavior Observation Laboratory.
This presentation is intended to assist you in troubleshooting basic problems that can occur with hardware and software. NOTE: This presentation contains.
Components: Sansa Clip Mp3, earbuds, USB cable, Quick Start Guide.
Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
5.3 Installing the blade server in a BladeCenter unit.
University of Maryland Center for Environmental Science Chesapeake Biological Laboratory IP Phone Training.
Setting up and using an LED projector with computer & video input device MEDT 7477 Submitted by: Team 6 Has Slone.
CRC Technology Training November Help and How-To.
Motherboard Further Information Click on the image for details about each component.
How to Perform Preventive Maintenance of the Personal Computer Properly Shut Down of the Computer Properly Shut Down of the Computer Unplug all Connection.
CS-334: Computer Architecture
Riso Digital Education Center Appendix for SRC Training Basic Course 1.
Portable/Desktop Projectors Small and light, ideal projectors for transports.
Mark Neil - Microprocessor Course 1 Decoding and Using a 4x4 Keyboard.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Preparing … First of all, recycle monitor power using AC power switch. Connect serial cable between your PC and monitor. (RS-232 Connector). Refer to Appendix.
Version 4 Multimedia Podium User Guide Version 4 Multimedia Podium User Guide Revision Date: September 2014.
Version 4.2 Multimedia Podium User Guide Version 4.2 Multimedia Podium User Guide Revision Date: January 2010.
Plex Training. 2 Course Objectives Learn how to Log on and Change Passwords in Plex Learn the Common Functions on the Control Panel Learn how to Log into.
Basic PC Building Presentation for the Rochester Computer Society, Inc by Tony Dellelo Nov/07.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
We Design It Replacing Hard Drives Tutorial Seven Easy Steps By: James Landon Carie Jackson Odetta Rodriguez Michelle R. Person Miceala Vega.
1 Semester 2 Module 2 Introduction to Routers Yuda college of business James Chen
1 Chapter 2 ROUTER FUNDAMENTALS By: Tassos Tassou.
PC Support & Repair Chapter 3 Computer Assembly. Objectives After completing this chapter, you will meet these objectives: ▫ Open the case. ▫ Install.
Cypress-Fairbanks I.S.D. 04/04/05 PC6 Word Processor Training Assistive Technology
Computer Maintenance PC Disassembly and Reassembly 1 Copyright © Texas Education Agency, All rights reserved.
Should be on Up to hear patient button presses Down to mute. In either case the #1 and #2 lights should light with each button press. Leave the 5 to the.
Diagnostic & Troubleshooting Date 06/09/00, Page 1 Diagnostic & Troubleshooting s.
Computer Maintenance PC Disassembly and Reassembly UNT in partnership with TEA, Copyright ©. All rights reserved1.
Operating Systems  By the end of this session, you will know: What an Operating System is. The functions it performs.
Vela NDU EAS Controller BEFORE connecting any hardware, verify that the NDU front power LED indicator is OFF. BEFORE connecting any hardware, verify that.
Booting. Booting is the process of powering it on and starting the operating system. power on your machine, and in a few minutes your computer will be.
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
A Pictorial Operation Guide in Five Easy Steps The Birck LEGO Scanning Probe Microscope March
Software Overview The software that controls the Place n’ Paste is designed to be robust and error proof. With minimal intervention from the user, the.
Ladibug Document Camera DC 170 BY ART LEBEAU SOURCED FROM THE MANUFACTURERS USER GUIDE.
Datron World Communications Inc. RT7000 HF TRANSCEIVER FIELD MAINTENANCE PROCEDURES.
Using a Digital Projector and Airliner tablet The purpose of this short training session is to familiarize presenters with the basics of using both a digital.
Dr Mohamed Menacer College of Computer Science and Engineering Taibah University CE-321: Computer.
Printer. Keyboard In computing, a keyboard is a typewriter-style device, which uses an arrangement of buttons or keys, to act as mechanical levers or.
Topic: Solar Cell Angle Objective: ▫ Explore the effect that solar cell angle has on power generation. Summary: Students use a solar cell and multimeter.
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 32 – Video System Troubleshooting.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
1 * * * Updated for NTS software version , * * *
AUDIO VISUAL TRAINING Vaughn Eames-Lite Class. LITE CLASSROOM EQUIPMENT Lite Class LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
Alpha/Numeric Keypad Functions using AVR Preliminary Design Review Luke R. Morgan ECE /17/2008.
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
1 * * * Updated for NTS software version , * * *
Introduction to LabVIEW
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
NWTS Vascular Access and Ultrasound Training Guide to NWTS Ultrasound equipment Guide to vascular access techniques in Paeds Sonosite’s Ultrasound physics.
Lyndon B. Johnson Space Center Human Research Facility (HRF) HRF WORKSTATION 2 Brian Barras 1 HRF WORKSTATION 2 OVERVIEW/NOMINAL OPERATIONS Trainer: Brian.
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 39 – Laptop Components.
Holter Monitor 2 Bioastronautics Flight Research Program Johnson Space Center, Houston, TX 1 Holter Monitor 2 Training Presentation Alonso Fuentes Hardware.
CCNA 2 v3.1 Module 2 Introduction to Routers
Chapter Objectives In this chapter, you will learn:
Network Video Switching Control System Presentation
K TO 12 CHS MODULE FOR GRADE 9, PP
McCrometer Nano Board Test Procedure
How to Perform Preventive Maintenance of the Personal Computer
How to choose a good motherboard ?
2. ATP INITIALIZATION PLACE ATP SWITCH TO “1” OR “NORMAL” POSITION A
Nellcor™ Bedside SpO2 Patient Monitoring System, PM100N - Home use
Presentation transcript:

Human Research Facility HRF Ultrasound Training 1 Neil Travis Johnson Space Center 2010 HRF Ultrasound Training Instructor:Neil Travis

Human Research Facility HRF Ultrasound Training 2 Neil Travis Johnson Space Center 2010 Introduction On-Orbit usages Session Objectives Ultrasound Overview Cabling and Power on Scanning Operation Power Down Protocol

Human Research Facility HRF Ultrasound Training 3 Neil Travis Johnson Space Center 2010 Current/Upcoming Usage Ultrasound ‘Lite’ –“Reserve” on increments when the ultrasound is not being used –Preventative maintenance by performing a thermal cycle of the unit –Uses L12-5 scanhead and keyboard only (no FSD) Integrated Cardiovascular –I20 and Subsequent –Uses P4-2 scanhead Vessel Imaging –Uses C5-2 and L12-5 scanhead Ocular Scanning –Uses L12-5 scanhead

Human Research Facility HRF Ultrasound Training 4 Neil Travis Johnson Space Center 2010 Possible Set-up for Contingency Ultrasound

Human Research Facility HRF Ultrasound Training 5 Neil Travis Johnson Space Center 2010 CMRS Ultrasound Probe (C5-2) Flat Screen Display Ultrasound Keyboard HRF Ultrasound

Human Research Facility HRF Ultrasound Training 6 Neil Travis Johnson Space Center 2010 Ultrasound Session Objectives Identify the components: front panels switches, connectors and indicators, and scanheads. Complete all power and data cable connections in the correct configuration. Perform pre-power up and power up procedures for Ultrasound. Recognize Ultrasound Lite operations. Perform power down of Ultrasound.

Human Research Facility HRF Ultrasound Training 7 Neil Travis Johnson Space Center 2010 HRF Ultrasound Basics Modified Commercial Off-The-Shelf imaging system Video Tape Recorder Flat Screen Display –powered by 28V pass-through power from the workstation Keyboard 3-lead ECG Image Collector Software –Located on HRF PC 1 3 probes on-board: –L12-5 –P4-2 –C5-2

Human Research Facility HRF Ultrasound Training 8 Neil Travis Johnson Space Center 2010 HRF Ultrasound Probes L12-5 Probe Cerebrovascular Generic Musculoskeletal Peripheral vascular Small parts P4-2 Probe Adult Cardio Abdomen Transcranial Doppler CARD CSI Generic C5-2 Probe Abdomen Generic Thoracic

Human Research Facility HRF Ultrasound Training 9 Neil Travis Johnson Space Center 2010 Scanning Activity Find the corroded Artery: Use reference use Cue Card at N1 to N3 for scanning

Human Research Facility HRF Ultrasound Training 10 Neil Travis Johnson Space Center 2010

Human Research Facility HRF Ultrasound Training 11 Neil Travis Johnson Space Center 2010 Operational Notes Ultrasound is a 2-switch turn on. –The Front Panel power switch is turned on first –Wait approximately 15 seconds –The Keyboard power is switched on. All cables are male – female connections –A pin to pin connection is possible. 2 cooling fans are in the rear of the ultrasound. In the event of fan failure, the corresponding LED on the front panel will be lit. –We do not receive direct ground notification of fan failures in the Ultrasound

Human Research Facility HRF Ultrasound Training 12 Neil Travis Johnson Space Center 2010 Operational Notes If error banners appear, hold down the “Superkey” (lower section F of Ultrasound Cue Card) while pressing the “3D” key (top row section F of Ultrasound Cue Card). –This sequence typically happens twice to completely close the error. –Repeat until all banners close. If banners persist, a quick reboot (accomplished by recycling keyboard power, i.e. switching the keyboard power switch to Standby), may be required.