Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Tests of DFS and WFS at ATF2 Andrea Latina (CERN), Jochem Snuverink (RHUL), Nuria Fuster (IFIC) 18 th ATF2 Project Meeting – Feb – LAPP, Annecy.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Status of g ray generation at KEK-ATF ► Introduction ► Status of the cavity R&D ► Out Look French Labs. : LAL (Orsay) in Collaboration with CELIA (Laser.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
17 th ATF2 Collaboration Meeting Summary Glen White, SLAC Feb 14, 2014.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 DR -> IP Beam Transport Simulations with Intra-Train Feedback Glen White, SLAC Jan 19 th 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Wakefield effect in ATF2 Kiyoshi Kubo
ATF2 Status and Plans CLIC January 2016.
ATF2 Status Background for the installation planning of Collimator
FACET Tests Update A. Latina, J. Pfingstner, D. Schulte,
Expected hardware status and Priority of the commissioning task
In collaboration with P. N. Burrows, A. Latina and D. Schulte
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
Presented by Douglas BETT on behalf of the ATF2 Collaboration
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
Progress towards nanometre level beam stabilisation
Feed forward orbit corrections for the CLIC RTML
Presentation transcript:

Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical board KEK, February 13, 2014

Progress Reports ATF2 Status (Okugi) IP-BSM laser stabilisation is main current (crucial) issue. On- going investigation and improvements with help of company engineer. IP-BPM issues e.g. matching of reference and C BPM cavity, non-linearity of electronics. IP-BPM goal in context of goal-1. ILC versus ATF2-optics (10x1 and 1x1): tuning, tails,… FONT (Burrows) Y – Y’ coupled feedback loops with 2 kickers and 2+1 stripline BPMs. Resolution  0.3  m. Check of effects downstream: IP and additional stripline (sine/cosine-like locations). Matched by modeling. Tracking of time shows coupling from energy oscillations (?). P2&P3 quasi degenerate  IP angle phase  investigate! LW-OTR (Ainsworth) Point spread function method for sub-micron resolution spot size measurement, by unfolding smoothing effect from Gaussian distribution. Quad scans  13.5 pm vertical emittance. Optimization of analysis based on spring 2013 data. Plan publication. Systematic studies, including effects of non Gaussian tails. Cavity Compton (Delerue, Omori) Four-mirror Fabry-Perot cavities (Japan and France) for improved stability. Omori: 4000 finesse, issue of optical properties and mirrors for high power (small power losses cause heating) under study. Delerue: new laser, amplification and mirror improvements, 40 kW power stored (81kW at LAL), study of long term bevavior, lifetime measurement from Compton, see IBS effect GM feedback (Jérémie) Limited sensitivity. New correlation method introduced to take jitter better into account. Long term project, mainly offline analysis and simulation challenges. GM sensors currently planned at KEK until March 2016.

Proposals Halo collimation studies by IFIC and LAL (Faus-Golfe) Realism of analytic wakefield calculation OK even for relative comparison, remaining wakefield after retracting collimator, halo reemission from halo interception, halo generation drivers and possible reduction,… Two octupoles and QD0 for the ultra-low β optics by CERN (Marin) Alignment of octupoles, 1 spare FFTB mover available, an additional one would be needed, simulate also possibility to correct octupole errors more generically, not just those from measurements now in optics deck, weight of hybrid QD0, timescale, simulate experimental tuning procedure with octupoles, tail folding,… A new OTR/ODR beam size monitor for future linear colliders at ATF2 beam line by KEK, CERN and RHUL (Aumeyr) appropriateness of shift requests for installation and for commissioning, what beam sizes expected to be measured, OTR/ODR combined target, same teams are developing and installing, goal of low/high intensity and scalability to replace LW, instruments between installation and final usage, bunch length?,… Wake Free Steering (Kim, Snuverink, Latina) BPM resolutions, WFS/DFS compatible orbit, WSF/1-1 in ATF2 simulation ?, jitter subtraction from incoming orbit, emittance improvement after correcting other effects, experimental procedures,… PoP experiment on beam loading for truly conventional positron source at ATF injector (Urakawa) to be presented tomorrow…