SAHV Annual Review… Overview of Changes.. Section 2 Changes Definition of “Disconnection Point” Change = Removal of the word “total”. Disconnection Point.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

HR Forum: Inclement Weather May 4, University continues certain operations during periods of inclement weather due to the needs of students, the.
Course Material Overview of Process Safety Compliance with Standards
Regulation Grant Brown Bag Session February 12, 2013.
Appendix B* AFGE National Constitution Standard Local Constitution * Only Articles of the Constitution that are related to the Financial Officers are Covered.
Today’s Meeting There are approximately 25 people killed by electricity per year in Australia (average for the last 7 years), 700 people are hospitalised.
Exercise 1 TDT 4235 Tor Stålhane IDI / NTNU. Intro The strength of ISO9001 and many other standards is that they focus on “What shall be done” and leave.
LeaveTraq Training for Managers HUMAN RESOURCES DIVISION OF FINANCE.
UK BP/SE/NSI 24 Colin Hepton Keadby 400kV Substation.
Safety Training: Technical Training Clearance Procedure Authorized Employee This course is best viewed with headphones or speakers, the audio.
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
DUCK RIVER EMC Lockout/Tagout Procedures For Overhead and Underground Line Work (De-energizing Lines and Equipment for Employee Protection)
IS Audit Function Knowledge
Telemedicine Credentialing and Privileging October 16, 2014.
September/October Prerequisite Skills Policies Governing the Services for Students with Disabilities NC IEP Team….  (4) A representative.
Research Administration Forum June 17, Agenda Tuition Costs (David) Conflict of Interest Disclosures (David) Revised Division Approval Form (David)
11 Travel Policies BPM - Section 500 Changes Effective July 1, 2011 University of Missouri.
Controlling Hazardous Energy
Lockout Tag out Training2009. Control of Hazardous Energy Policy Personal locks & keys will be issued to employees by their Safety/Training Coordinator.
8th RESS IG IMMA contribution RESS-8-9. IMMA L6/L7 contribution IMMA has decided to provide the global expertise on L6/L7-vehicles at WP29 to address.
Network security policy: best practices
SAS No. 70 BADM 559 Jong Choi. Overview of SAS 70 Definition ▫SAS 70 helps service auditors to assess operational and technical controls of a service.
NANCY H. SMITH DOC PERSONNEL, BENEFITS SECTION 919/ VOLUNTARY SHARED LEAVE.
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
Aging.ohio.gov/services/ombudsman Guardianship in Ohio Ombudsman Continuing Education.
Key changes from OHSAS 18001:1999
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
1 SEVIS Sticky Wickets: Leaves & Transfers Office of Minority and International Students.
Old Policy – which no one ever seem to have heard of.
Lockout/Tagout for Affected Employees Understand the Basics.
Establishing an Electrically Safe Work Condition May is Electrical Safety Month Training A product of the EFCOG Electrical Safety Task Group.
Policy Council and Program Planning. The Head Start Program Planning Cycle National Center on Program Management and Fiscal Operations (PMFO)
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
Implementation of the Mental Health Act 2007 Section 12(2) Approved Doctors.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
1 CIP Cyber Security – Personnel & Training Steve Garn CIP Compliance Workshop Baltimore, MD August 19-20, 2009 © ReliabilityFirst Corporation.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
1 Proposed amendments to the National Environmental Management Act, 1998 (NEMA) October 2007 Presentation by Joanne Yawitch DDG EQP.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Drs. Krishna and Webb October 31,  6  6.1  6.2  6.3  6.4  7.1, 7.2, 7.3, 7.4  7  7.3  7.4  LUNCH ANSI Training 2013: Webb/Krishna.
ADT490 TroubleShooting Grounds. 2 Prior to Troubleshooting ‣ Before starting to work on the FACP, what do you do? 2.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Coordinating Nonpublic School Services Jack Clark Allentown City School District Cindy Rhoads Regional Coordinator, DFP.
California Community Colleges Chancellor’s Office Quality Distance Education Webinar Attendance Accounting And Reporting for Distance Education Courses.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Developing a Local Authority Policy for Safety Audit Jo Horton - Road Safety Engineer Kent County Council
Global Marketing © Chevron 2009 Rev. 1 Electrical Safety Awareness Plus.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
Financial Support to Third Parties
Vessels and Facilities that are Temporarily Out of Service or Laid-up
Proctor Training Required for all Proctor Volunteers
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Zero Tolerance Rules What?
Oleh : Ir. Sjaifuddin Thahir, MSc.
System Lock Out/Tag Out and Line Breaking GSS24
Management of Change Report Errors to Management.
Proctor Training Required for all Proctor Volunteers
Oleh : Ir. Sjaifuddin Thahir, MSc.
This takes approximately 5 minutes or less from start to finish
Control of Hazardous Energy
POWER SYSTEM COMMISSIONING AND MAINTENANCE PRACTICE
TRTR Briefing September 2013
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
Training Presentation Truck Controller- Surfacing
CR-GR-HSE-419 Safety of excavation works
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

SAHV Annual Review… Overview of Changes.

Section 2 Changes Definition of “Disconnection Point” Change = Removal of the word “total”. Disconnection Point – An adequate break created by the total removal or absence of Conductors and deemed no longer a source of inadvertent energisation. The break Shall:- –not be able to be re-established by normal Switching operations, and –maintain Exclusion Zone appropriate to the voltage or maintain electrical non-flashover distance appropriate to the voltage as defined by the Electricity Entity, and –be created in accordance with an Approved Procedure to establish a Disconnection Point Operational Effect: When it is not possible or practical to totally remove conductors (e.g. large bridges on 110kV towers) a break may be classed as adequate under the definition if all the dot points are met. **This change mostly applies for Powerlink. Energex’s policy is that by default the conductor is totally removed to provide the break. Only under limited circumstances will the exception be allowed. Section 2 Changes

Definition of “Not Electrically Connected” Change = Removal of the word “total”. Not Electrically Connected – Electrical Apparatus Disconnected from all sources of Supply by the total removal or absence of Conductors, appropriate to the voltage and insulating medium and, not able to be Energised by Switching and identified in accordance with an Approved Procedure Operational Effect: When it is not possible or practical to totally remove conductors (e.g. large bridges on 110kV towers) a break may be classed as adequate under the definition if the conditions in this definition AND all the dot points in the definition of Disconnection point are met. **This change mostly applies for Powerlink. Energex’s policy is that by default the conductor is totally removed to provide the break. Only under limited circumstances will the exception be allowed.

Changing Isolation Points on an Permit (4.1) Change = Insert: “…prior to isolation points being altered…” If Isolation Points change during the course of work, under an Access / Test Permit, then prior to Isolation Points being altered, all current related Access/Test Permits Shall be Surrendered and cancelled and new Access/Test Permits issued reflecting the new Isolation Points. Operational Effect: No real effect – this is just a more specific wording to remove ambiguity. See also addition of similar paragraph to Section 5.3 regarding changing location of Operator Earths. Section 4 Changes

Earthing Requirements when Issuing Permits (5.3) Change = Alteration of wording : “…a minimum of one set of Operator Earths shall be applied…” Operator Earths Shall be applied to ensure Electrical Apparatus in the area where a Work Area is or can be established is Earthed prior to the issue of an Access / Test Permit. Operational Effect: Reduced poor wording and ambiguity regarding the number of earths required when issuing a permit. Sufficient Earths to adequately earth the work area is the minimum number required. It may be one – it may be more. Section 5 Changes

Requirement for Recipient to Remain on Site while TP is on Issue. (9.3) Change = Removal of wording: “A test permit should not remain on issue (e.g. overnight) unless the Recipient is in attendance.” Operational Effect: This restriction had no practical or safety benefit and actually created inefficiencies. A crew may now sign off a TP, leave the site, then return the next day and sign back on (as we currently do with an AP) provided all necessary checks are made to ensure the safety of the workgroup. Section 9 Changes

Responsibilities of Switching Coordinator when Suspending Permit. (9.16 & 9.17) Change = Insert new c) in 9.16: (old c now = d, old d now = e, old e moved to S9.17)) “c) before approval is granted, the Switching Co-ordinator Shall:- i) check if other work groups will be affected and advise affected Recipient/s to suspend or surrender their Access Permits ii) confirm with affected Recipient/s that their Access Permits have been suspended or surrendered and cancelled iii) confirm the status of the Electrical Apparatus at the time of the suspension of the work iv) cancel any surrendered Access.” Operational Effect: No real effect – more clearly outlines the responsibilities of the Recipient and Switching Coordinator and lists the responsibilities in a more naturally sequential order.

Section 9 Changes Minor Wording Changes Throughout… Definition of “Entity” – Now aligns with Electricity Act. Definition of “Should” removed due to conflicting legislative interpretations. All occurrences of “should” replaced with “shall” or “it is preferable to” as applicable. Document review period changed from one to two years.