Contents Major issue states and transitions Tools.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Advertisements

PbD-SE Technical Committee First Meeting December 05, 2012.
OASIS OSLC CCM TC Inaugural Meeting 04 February /04/14OASIS Presentation to OSLC CCM TC.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: IEEE Down Selection Process Date Submitted: January 18, 2005.
March 20, 2001CSci Clark University1 CSci 250 Software Design & Development Lecture #17 Tuesday, March 20, 2001.
Proposed TC Issues Process Martin Chapman. Purpose An issues driven process helps to 1.Untangle un-conflate problems 2.Narrow focus to solving particular.
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
OData Technical Committee Kick-off July 26, 2012.
CTI STIX SC Monthly Meeting August 19, 2015.
CMIS4DAM TC Inaugural Meeting 03 December /03/14OASIS Presentation to CMIS4DAM TC.
Report from the Abstract Process Clarification Sub- Committee Monday June 21, 2004.
Chris Albrecht Legal Counsel JGC Leadership Training
TOSCA Technical Committee Kick-off December 12, 2011.
SCA TCs Proposed Issues Process Martin Chapman, Assembly Co-chair Anish Karmarkar, BPEL Co-chair Ashok Malhotra, Policy Co-chair Mike Edwards, Assembly.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
Consideration Of Updates And Additional Revisions To Procedures For Conducting Board and Committee Activities Board Item # 2.
Doc.: IEEE /0698r0 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group March 2015 Report.
Doc.: IEEE / 0404r0 Submission March 2015 Slide 1 TGax PHY Ad Hoc March 2015 Meeting Agenda Date: Authors:
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
Doc.: IEEE /0507r0 Submission TGaj CC12 on 10 April 2014 Report Author: Date: NameCompanyAddressPhone Haiming WANGSEU/CWPAN 2.
Doc.: IEEE /1623r0 Submission November 2006 Jim Petranovich, Conexant Systems, Inc.Slide 1 PHY Ad Hoc Nov 1 Agenda and Minutes Notice: This document.
Agenda & OASIS Procedures
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4r Opening and Closing for.
Doc.: /0036r0 SubmissionSlide 1 11/03/2016 Slide 1 IEEE White Space Radio Opening Report Notice: This document has been prepared to assist.
Note At the 2008/03/12 TC meeting the BPEL4People TC formally adopted the SCA TC issue process for issue resolution. The following slides document v3 of.
Idaho Conservation District’s Resolutions. Resolution res·o·lu·tion noun 1. a formal expression of opinion or intention made, usually after voting, by.
Doc.: IEEE /0186r0 Submission January 2007 Guenael Strutt, MotorolaSlide 1 RFI London Update Notice: This document has been prepared to assist.
CLUE WG IETF-85 Mary Barnes (WG co-chair) Paul Kyzivat (WG co-chair)
Legal Citation Markup TC Inaugural Meeting 12 February /12/14OASIS Presentation to LegalCiteM TC.
OASIS VIRTIO TC Inaugural Meeting 30 July /04/13 OASIS Presentation to PKCS 11 TC TC Process Overview TC Process is created by OASIS Board, carried.
BU Power Tools & Accessories – PT&A Task management – Definitions
OASIS Overview TC Process & Administration
OASIS OSLC CCM TC Inaugural Meeting 04 February 2014
OASIS TC Process Overview
CTI STIX SC Monthly Meeting
Chris Albrecht Legal Counsel
Meeting Procedure.
OCPP TC Inaugural Meeting 07 September 2016
Proposed TC Issues Process
OASIS eTMF TC Inaugural Meeting 16 December 2013
OASIS Overview TC Process
OASIS Overview TC Process
CSAF TC Inaugural Meeting 16 November 2016
OASIS OSLC Core TC Inaugural Meeting 12 November 2013
OASIS Overview TC Process & Administration
OSLC Domains TC Inaugural Meeting 30 September 2016
ARIP TC Inaugural Meeting 22 May 2015
OASIS Overview TC Process
CTI TC Inaugural Meeting 18 June 2015
Legal Citation Markup TC Inaugural Meeting 12 February 2014
OSLC PROMCODE TC Inaugural Meeting 26 March 2014
Note Well Any submission to the IETF intended by the Contributor for publication as all or part of an IETF Internet-Draft or RFC and any statement made.
WS-RX TC Process for Specification Development
WS-RX TC Process for Specification Development
IBOPS TC Inaugural Meeting 23 September 2014
Liaison Report Date: Author: July 2006 Month Year
Sponsor Ballot Comment Resolution
IEEE MEDIA INDEPENDENT HANDOVER DCN:
OSLC Automation TC Inaugural Meeting 25 March 2014
COEL TC Inaugural Meeting 15 July 2015
Chris Albrecht Legal Counsel
BIOSERV TC Inaugural Meeting 08 July 2015
TGn-LB97-General-adhoc-report
What is a CA document? Date: Authors: March 2005 March 2005
IEEE MEDIA INDEPENDENT HANDOVER DCN:
OASIS VIRTIO TC Inaugural Meeting 30 July 2013
TGn Proposed Draft Revision Notice
TGn-LB97-General-adhoc-report
Presentation transcript:

Contents Major issue states and transitions Tools

New Issues Raised by TC Members at and in between meetings Must be recorded in the S-RAMP project in OASIS JIRA May be recorded by ING to the TC mailing list –Subject should be “NEW ISSUE: [title]” – must describe the problem in as much detail as possible – MAY propose a solution Issue number allocated at this stage even though may not be accepted as an issue

New Issue Template Title: What is the topic Raised By: Name Target: What spec/section is affected, incl version Description: Explanation of problem Proposal: Optional but encouraged

Open Issue No issue in a TC may be worked upon unless it is opened –Only discussion on new issue is to clarify and decide whether to open or not An opened issue is –a new issue that has been voted to be opened Does not imply acceptance of any proposed resolution – a closed issue that has been voted to be reopened Discussion of an issue can take place in meetings and on the mailing list –All s MUST contain a subject line that includes “ISSUE: [issue number]”

“Resolved” Issues A solution to an issue has been agreed by vote of the TC The solution requires changes to a document A resolved state means changes are agreed, but have not yet been incorporated into an agreed working draft –Precise wording changes as far as possible –Some resolutions may delegate to editors Sub-State of “Applied” to denote editors have incorporated the resolution

“Deferred” Issues An issue that is valid but agreed to be addressed in a future version of the spec. Agreed by the TC It is not closed.

Closed Issue An issue that will not be worked on anymore by the TC –A new issue deemed out of scope, inappropriate, malformed etc –A duplicate of another issue –An open issue that is now no longer relevant. –A resolved issue whose applied changes have been incorporated into a committee draft Sub-state to record whether rejected, duplicate, fixed, no action

Re-opening an Issue A Closed Issue can be re-opened. Requires a Two-Thirds Majority vote run by the TC chair(s) –Hence a very strong justification needed –Standing rule required Re-opening does not undo a previously resolved issue (i.e. “un-edits”), but new resolution must take old resolution into account.

Tools to raise new issue using template (optional) Use S-RAMP project in OASIS JIRA to record all issues –Allocate issue numbers –Record state changes –Record resolutions and major decisions on an issue. –Always include public links to Minutes where decisions made. Issue discussions SHOULD NOT take place on JIRA –Discussions on TC list and TC meetings –Using OASIS tools is essential for tracking IPR contributions