The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.

Slides:



Advertisements
Similar presentations
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Advertisements

CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Far Detector Data Quality Andy Blake Cambridge University.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Muon System Safety Issues Burkhard Schmidt.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
06/04/2012Steve Hahn — AEM Meeting1 MINOS Status Report Rack cleanup –All racks vacuumed –All filters cleaned –Wiener power supply/chassis checked for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
CAL SHIFT MARCH 2004 Thomas Schörner-Sadenius Hamburg University CAL Meeting DESY 24 March 2004 Think carefully whether you consider being on shift.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Matthew Glenn AP2 Techno for Tanzania This presentation will cover the different utilities on a computer.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Calorimeter Status Electronics Installation and Commissioning
LAV front-end and readout status
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Muon Recording Studies and Progress for the MICE Tracker
Call to Fix HP Printer Installation Error Code 1603
University of California Los Angeles
DIRC Background Status
Cal DQM Report 11/26/03 – 12/03/03.
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015

V95 FEB Firmware Upgrade We have installed V95 FEB firmware in the detector. –Increases the number of hits a TriP chip can store from 8 to 20. Without it we will suffer some significant increase in dead time due to buffer fills. The dead time is analysis dependent. The deadtime increases faster than linearity with POT/spill. –V95 was used in test beam and was extensively tested. We downloaded the updated version of the CROC-E firmware that went with v95. This version was tested in the test beam. The update went well. –The DAQ ran well for 4 days with no problem. 2

V95 FEB Firmware Update Next, downloaded FEB firmware v95 in the FEBs in the detector. The download went well, although it takes somewhat longer, 3-4 hours, to get the DAQ running after a power outage. –Required new configuration file & offline unpacking changes. Both tested at the test beam. –Running PED & LI continuously. The DAQ has been running well. –The data is bad. We call this problem the V95 ADC Problem. –For Crate 0, only 1 or 2 gates out of 1000 have the V95 ADC Problem. –For Crate 1, most gates have at least 1 FEB with the V95 ADC Problem. 3

V95 ADC Problem A FEB reads out 64 pixels, # of pixels in multichannel PMT. –A FEB can be broken down into 2 sets of hardware of which each reads out 32 pixels. –If one of the 32 pixels of a set has the V95 ADC problem, all 32 pixels have the V95 ADC Problem. Since each PMT pixel is readout out by a hi, med, and low channel, we can determine whether the ADC value for a pixel makes sense. For all of the 32 pixels, the data does not makes sense and does not correspond to the input ADC charge. Most of the time a FEB data is OK. If we restrict the readout to only 1 crate: –For crate 0, we get a bad gate with about the same frequency as with 2 crates, ~ 1 in every 1000 gate. –For crate 1, the problem is gone. –The test beam, which did not have this problem, had 1 crate. 4

V95 ADC Problem A FEB does not know which crate it is on nor does it know the number of readout crates. In addition, crate 1, with the worst problem, is fine since it does not have the problem if crate 1 is readout alone. The difference between crate 0 & 1 has left the “experts” completely stumped. –A suggestion was made as what the problem was (which does not explain the difference between crate 0 &1), and the proposed solution did not help. If we do not solve this problem within 1 – 1 ½ weeks before beam starts, we will go back to V91. –We are changing the test beam DAQ to a 2 crate system so that we can hopefully replicate the problem there. 5

Other Necessary Tasks With the large effort and time we have put in on V95 ADC problem, other tasks have not been done. The following are the needed to be done: –During our testing of V95 a chain has failed, probably from a bad FEB. In addition on the same chain, the HV for a PMT is bad. It could be the same FEB. This will require removing 2 roof panels. To remove 2 roof panel & test the fixes, we need a working DAQ Although the other work on the detector is not absolutely necessary, this would be a good time to do it, ~ days of work with v91 –Get the veto HV working again. The code was on a computer which was removed from the Hall & replaced with the present DAQ computer. –Get a clone of logger, the online monitoring machine. This computer exists & needs to be brought into the hall and tested We do not need v91 to test this. –Clean the FEB power supplies DAQ can run while the power supplies are being cleaned. 6

Important to do Have the DAQ setup the 2 light injection (LI) boxes. –Right now 2 old DAQ computers setup the LI boxes. –The issue is a computer needs 2 serial ports to setup both LI boxes. The spare DAQ computer in the Hall needs a 2d serial port. V96 FEB & CROCE firmware, which increases the live time. –However, we need to solve the V95 problem before we can go to V96. – Getting ready to install v96 will require a lot of testing. Thanks –Geoff Savage, Donatella Torretta – Neutrino Division. –Cristian Gingu, Paul Rubinov – EED. –Experimental Computing Division, SLAM Group. 7