M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.

Slides:



Advertisements
Similar presentations
NEMO Fase1 OPTICAL DATA TRANSPORT F. Ameli, M. Bonori, I.N.F.N. Sez. Roma1. VLVυT - Amsterdam 5-8 October Architecture Working Group NEMO Phase 1.
Advertisements

Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
A.Margiotta, SNOW 2006, Stockholm, 6 May 2006 Status Report of the NEMO Project (NEutrino Mediterranean Observatory) Towards a km 3 Neutrino Telescope.
ANTARES and KM3NeT John Carr Centre de Physique de Particules de Marseille IN2P3 / MICINN meeting Madrid, 12 Jan 2009.
Kay Graf Physics Institute 1 University of Erlangen ARENA 2006 University of Northumbria June 28 – 30, 2006 Integration of Acoustic Neutrino Detection.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
Status of the ANTARES Neutrino-Telescope Alexander Kappes Physics Institute University Erlangen-Nuremberg for the ANTARES Collaboration WIN´05, 6.–11.
Timing calibration in ANTARES Juan José Hernández Rey IFIC – Instituto de Física Corpuscular Universitat de València  C.S.I.C. (for the ANTARES collaboration)
June 9, 2002 Hallewell ANTARES RICH ANTARES : A deep-sea 0.1 km² neutrino telescope Greg Hallewell – CPP Marseille Representing the Antares Collaboration.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
ANTARES: a system of underwater sensors looking for neutrinos Miguel Ardid IGIC- Universitat Politècnica de València on behalf of the ANTARES Collaboration.
Martino Ruppi – KM3NeT 16 – 18 April Pylos Clock distribution and absolute time calibration in NEMO phase 1 Martino Ruppi INFN di Bari.
Hanoi, Aug. 6-12, 2006 Pascal Vernin 1 Antares Status report P.Vernin CEA Saclay, Dapnia On behalf of the Antares collaboration P.Vernin
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
CEA DSM Irfu The ANTARES Neutrino Telescope A status report Niccolò Cottini on behalf of the ANTARES Collaboration 44 th Rencontres de Moriond February.
V.Bertin CPPM / ANTARES Coll. - Moriond ANTARES : A deep-sea 0.1 km² neutrino telescope Vincent Bertin - CPPM-Marseille on behalf of the Antares.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
Isabella Amore Laboratori Nazionali del Sud - INFN, Catania International School of Cosmic Ray Astrophysics 15th Course: "Astrophysics at Ultra-high Energies"
M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Timing calibration in NEMO M. Circella Istituto Nazionale.
Detector Status J. Brunner 12/09/2014. Highlights Line 3 Optical Margins Line 5 UPS Situation Data Taking Status Planned Operations.
Shore Station1 EFNI H K Shore Station Block diagram Form factor Power setup Special for BARI Special for MILOM Planning Outcome of brainstorm.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
The ANTARES Project Sino-French workshop on the Dark Universe Stephanie Escoffier Centre de Physique des Particules de Marseille On behalf of the ANTARES.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
The ANTARES Neutrino Telescope and its Dark Matter Capabilities
VLV T – Workshop 2003 Read Out and Data Transmission Working Group Synchronous Data Transmission Protocol for NEMO experiment.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
NEMO-O DE NEMO First results from the NEMO Test Site G. Riccobene, for the NEMO Collaboration The NEMO Collaboration is performing the Phase 1 of the project,
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
F. Simeone – University “Sapienza” and INFN Sec. Roma1RICAP 11 Conference Roma May 2011 The data acquisition and transport design for NEMO phase.
F. Simeone – INFN, Sez. Roma1 RICAP07 Conference, Rome June 2007 Data taking system for NEMO experiment RICAP07.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
Status and Perspectives of the BAIKAL-GVD Project Zh.-A. Dzhilkibaev, INR (Moscow), for the Baikal Collaboration for the Baikal Collaboration September.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Status of the LIDO East Sicily Station F.Bruni.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
M. Circella, INFN Bari Time-calibration in NEMO VLVnT08 Time calibration in NEMO M. Circella, INFN Bari Time calibration The NEMO Phase 1&2 towers Time.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
Giorgio Riccobene, LNS-INFN KM3NeT WPF/L Meeting, NIKHEF 5-7/07/2010 Status of the Acoustic Calibration System for KM3NeT.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NeT-Italy Collaboration meeting 28/11/2014 Sistema di trasmissione dati su fibra ottica: Junction Box Sara Pulvirenti.
PPM 30/10/2012. In-situ validation programme Oct/Nov 2012: VEOC prototype in Atlantic (monitor fibres, pressure) Dec(?) 2012: multi-PMT.
Using VDSL2 over Copper in the Vertical String
DAQ read out system Status Report
On behalf of Patrick Lamare
Write-up and Definitions for Cost Model
Interdisciplinary Activity ANTARES
Data transport architecture over fiber and/or copper
Junction Boxes for KM3NeT
ANTARES.
ANTARES time calibration
Final (?) line_0 configuration (follows steering group consideration 5/5/2004) Line Zero meeting, Nov
Presentation transcript:

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 La Seyne sur Mer The ANTARES site 2 ~40 km ~2475 m depth

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 © F. Montanet 12 lines 25 storeys / line 3 PMTs / storey ~900 PMTs ~70 m 100 m 350 m 14.5 m Submarine links Junction Box cable to shore Anchor/line socket a storey 2500m depth 3 The ANTARES apparatus

M. Circella – ANTARES connectionINFN Comm. II, 5/6/ Hydrophone RX Local Control Module (in the Ti-cylinder) Optical Beacon for timing calibration (blue LEDs) 1/4 floors 17” glass sphere 10” PMT Ham. R stages Basic detector element: storey

M. Circella – ANTARES connectionINFN Comm. II, 5/6/ Architecture of the Data Acquisition System 100 Mb/s link SCM MLCM 2 MLCM 3MLCM 4MLCM 5 1 Gb/s link MUXMUX deMUXdeMUX to shore (MEOC) JB Line 1 Line 2 LCM OM Shore Station La Seyne-sur-mer Demux/ Mux Computer farm LCM MLCM 1 ANTARES: a large undersea LAN…

M. Circella – ANTARES connectionINFN Comm. II, 5/6/ Clock distribution STARTSTOP TDC STARTSTOP GPS E/O/E TX RX Main Electro-Optical Cable 40 km from shore to Junction Box Single bidirectional fibre (1534 nm / 1549 nm) Junction Box 1  16 passive splitter String Control Module BIDI modules O/E and E/O converters by sectors (5 storeys) Local Control Modules LCM clock boards 1534 nm  1549 nm 1310 nm  1550 nm On-shore Station Link Cables m fibre 1534 nm  1549 nm

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 Junction box 7  Receives ~ 3700V 50Hz from shore station & provides 50Hz to 16 galvanically independent outputs {transformer with 16 secondaries} (& individually protected by re-armable circuit breakers);  Distributes clock synchronisation signals on fibreoptics to up to 16 outputs  Collects DAQ data via fibreoptics from up to 16 outputs  Junction Box internal control system and DAQ triply-redundant Deployment, December 2002

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 Cable characteristics: 2 electrical wires: Voltage : 500 VAC, Current : ~2.5 A, wire section : 3 mm 2 2 single mode optical fibres for slow control and data transmission (used with 200 GHz DWDM) 2 single mode optical fibres for clock distribution (1 fibre for redundancy) Optical losses < 2 dB per optical channel Length of the link : 120 m to 350 m Weight of the link : < 50 kg in water Dry cable for link, equipressure for jumper The underwater interlink connections 8

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 lines installed on the sea-bed from a DP-ship underwater interlink cables deployed on drums connection of interlink cables to junction box and lines performed by a manned or unmanned (ROV) underwater vehicle lines can be recovered in case of need by activating an acoustic release system ANTARES construction operations 9

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 L11 L9 L10 L12 L7 L8 L6 L4 L2 L3 L5 L1 IL m N Junction box Submarine cable to shore Status of ANTARES in Dec To be deployed and connected Installed & connected

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 After December 2007 connection operation: 10 detection lines + instr. line connected Junction Box status in early (At least) two connectors bad Implemented solution: two lines of the apparatus share the same JB connector! (required: modified cables, modified lines for DWDM and power) L3 L4 L6 L8 Spare L1 L10 L2 L9 L7 IL L5

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 Line deployment 12 Line being loaded on the ship Ready for deployment Action! Lines are installed within a few meters from nominal positions

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 IFREMER ‘VICTOR6000’ Remotely Operated Vehicle (ROV) Line connection 13

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 Remote tests of the underwater connections (OTDR) 14

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 New ‘Y-cables’ used for multiplexing two lines on one single junction box output May 2008 connection operation 15

M. Circella – ANTARES connectionINFN Comm. II, 5/6/ 'Y-cables' deployed and connected to the Junction Box Line 9 + Line 11 connected with a 'Y-cable' Line 10 connected with second 'Y-cable' Line 12 connected with standard cable interlink cable to Line 4 changed (line functionality recovered!) attempt to repair JB connector 9 seismograph (connected to Line 12) installed 1 bad interlink cable recovered Operations performed in May 2008 (23-25 and 28-30) detection lines + instrumentation line in data acquisition since end-May!

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 Junction Box status in June L3 L10 L6 L8 L9/ L11 L1 L12 L2 L4 L7 IL L5

M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 L11 L9 L10 L12 L7 L8 L6 L4 L2 L3 L5 L1 IL07 seismometer 100 m N Junction box Submarine cable to shore Status of ANTARES in June Installed & connected! + Possibility of connecting a secondary junction box for multidisciplinary activities (IFREMER project)