Draft for discussion1 OSLC PLM roadmap discussion Aug 30 th 2011 Rainer Ersch Gray Bachelor V0.4 updated at meeting Aug 30th.

Slides:



Advertisements
Similar presentations
OSLC PLM Workgroup1 Towards detailed use cases and alignment to OSLC V0.2 Gray Bachelor 19 th July 2011.
Advertisements

Planning at CMM level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements Engineering.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
OSLC ALM-PLM interoperability Workgroup1 OSLC PLM workgroup 2012 Kick off meeting For discussion.
Open Standards that Open Markets™ © Open Applications Group © Open Applications Group, 2014 All Rights Reserved OAGi Semantic Refinement Method and Tool.
June 5–9 Orlando, Florida IBM Innovate 2011 Integrated Application Lifecycle Management / Product Lifecycle Management for System Development Environments.
8/28/2005ECEN5543 Req Elicitation1 Targets of Requirements Engineering ECEN 5543 SW Engineering of Standalone Programs University of Colorado, Boulder.
1 Software Configuration Management METU Computer Engineering CEng 492 Spring'2004.
1 Copyright © 2014 Tata Consultancy Services Limited Source Code Management using Rational Team Concert IBM Rational, Alliance & Technology Unit 2 July.
WRAP Technical Support System Project Update AoH Call October 19, 2005.
CSSE 375 Software Construction and Evolution: Configuration Management
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Query Health Business Working Group Kick-Off September 8, 2011.
For OSLC PLM Workgroup meeting 7th Dec Analysis of the OSLC Specs and the PLM Reference model in the context of SE Scenario #1 V0.6 December 7 th.
Web Development Process Description
RUP Requirements RUP Artifacts and Deliverables
FY14 Budget Process Community Review – March 5 th 2013.
OSLC Working group meeting1 PLM extensions proposal feedback Updated from OSLC workgroup call 18/10/11.
OSLC ALM-PLM interoperability Discussion. OSLC PLM extensions Product Product, Version isVersionOf AMG54556_002 Product, View hasView AMG54556/001-View.
Requirements Analysis
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
Rational Unified Process Fundamentals Module 4: Disciplines II.
© 2011 IBM Corporation OSLC Communications Workgroup 15 September 2011.
1 © 2012 IBM Corporation Eclipse Lyo Update
OSLC PLM Workgroup visit URL for terms of usage1 Open Services for Lifecycle Collaboration OSLC PLM Workgroup Systems Engineering scenario #1 Systems Engineer.
Eliciting integration scenarios Proposal for Meeting
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
Proposed TOSCA TC Timeline March 1, TC Deliverables Standards Track Work Products – “…is a Work Product produced and approved by a TC in accordance.
© 2011 IBM Corporation OSLC Communications Workgroup 21 March 2012.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
June 5–9 Orlando, Florida IBM Innovate 2011 Session Track Template Rainer Ersch Senior Research Scientist Siemens AG ALM-1180.
Figure 5.1 Hardware development process and information usage. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data.
OSLC PLM Workgroup1 ALM-PLM terms Prep for Oct 5th.
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
OSLC PLM Workgroup visit URL for terms of usage1 OSLC PLM Workgroup PLM Scenarios Systems Engineering scenario “Systems Engineer Reacts to Changed Requirements”
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
Market Systems Release Update Modifications Committee Meeting 55 June 19 th
OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor.
OSLC PLM Reference model April Summary of the OSLC PLM Reference Model V0.4 April 4th 2011 Gray Bachelor Mike Loeffler OSLC PLM Workgroup.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
OSLC Core extensions proposal
OSLC PLM Workgroup visit web-site for terms of usage1 Open Services for Lifecycle Collaboration OSLC PLM Workgroup Systems Engineering scenario #1 Systems.
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
Requirements Management Overview NIGMS Software Development.
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
OSLC RM 22 nd June 2009 Workgroup meeting
OSLC PLM Workgroup 7/12/20101 The PLM Reference model in the context of SE Scenario #1 V0.6 December 7 th 2010 Gray Bachelor Mike Loeffler OSLC PLM Workgroup.
OSLC PLM workgroup workings1 OSLC PLM Spec analysis Consolidation from previous discussions 29/3 inc meeting notes.
Ideas for the SPDX™ WG 1. Onboarding New Participants SPDX™ WG need to have a plan for onboarding new participating companies. Example:  I am Company.
© OSLC OSLC PLM Workgroup1 OSLC Core extensions proposal Update of the Core WG proposal V0.9.
Software Engineering Lecture 9: Configuration Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
Introduction to Software Engineering 1. Software Engineering Failures – Complexity – Change 2. What is Software Engineering? – Using engineering approaches.
© 2013 OSLC User Group for Communications OSLC Member Section at OASIS present state and outlook, 6 September 2013 Open Services for Lifecycle Collaboration.
CM Spec analysis Markup from discussion 15/3. Summary of the scenario by way of the key business entities & their relationships CR Req Implem System or.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
OSLC PLM Reference model February Summary of the OSLC PLM Reference Model V0.2 February 22 nd 2011 Gray Bachelor Mike Loeffler OSLC PLM Workgroup.
OSLC PLM Workgroup1 Towards detailed use cases and alignment to OSLC V0.1 Gray Bachelor 18 th July 2011.
Brussels, January 16th, Overview and status of the project.
SSG meeting N°27 on the 5th and 6th of July 2016
August ICA Agenda Time Topic 8:00 – 8:15
Global Grid Forum GridForge
SysML 2.0 Model Lifecycle Management (MLM) Working Group
CSE4939W/4940 CS & E Design Lab I/II
Street Manager High-level roadmap
CSE4939W/4940 CS & E Design Lab I/II
Presentation transcript:

Draft for discussion1 OSLC PLM roadmap discussion Aug 30 th 2011 Rainer Ersch Gray Bachelor V0.4 updated at meeting Aug 30th

Draft for discussion2 Purpose To update the priorities for the OSLC PLM Workgroup To identify where additional feedback or contribution is needed To identify support needed by the OSLC PLM Workgroup

Draft for discussion3 Current deliverables and activities 1.Updated description of scenarios to a common level 1.Story 2 Design implementation 2.Decide if need a more detailed discipline view 2.Feedback on scenarios the 1.Main scenario prequel 2.Requirements change handling detail 3.Examples to support the proposed PLM extensions 1.RTC CR context 2.Design implementation (topcased, RTC SCM, Rhapsody DM 4.Set of PLM extensions to meet the CM-Requirements change handling scope 1.CR association with product version and view definition 5.Working example of Lyo with the proposed PLM extensions 6.Interlock with other workgroups on proposed PLM extensions 7.Agreement of a first set of PLM extensions

Draft for discussion4 Pursuit of the PLM extensions for versioning / revision handling and views Compare the current SCM Spec Configuration handling and the PLM extensions for usage, conflict and then ability to co-exist with some refinement Potential aspect –Clarify terms < Priority –Identify alternative approaches –Typical / practical usage –Support for parallel devt –Repository / workspace updates –Relate to revision handling within product lines, variants –Relate to baselines, change sets and tracked resources –Examples to support –Stakeholders in the OSLC community

Draft for discussion5 Timing for versions and views 02- Sep 09- Sep 16- Sep 23- Sep 30- Sep 07- Oct 14- Oct 21- Oct 28- Oct 04- Nov 11- Nov 18- Nov 25- Nov 02- Dec 09- Dec 16- Dec OSLC roadmap OSLC PLM scenario updates Refine the 1st PLM extension proposal with prototyping in Lyo Review and finalise the 1st OSLC PLM extension Sample milestones OSLC WG meetings MainWkg MainWkg MainWkg MainWkg Main Scenarios detailed Extensions prototyped Extensions as draft Spec

Draft for discussion6 Other topics to schedule RELM dialog and scenarios –Feedback –Needs from WG ? KTH dialog and feedback –Move discussion to the AM WG ? –Fredrik to come back –Feedback requested for mid Oct PLMIG SW release to PLM scenario –Opportunity for 2012 ProSTEP Codex –Evaluate opportunity and effort after mid Sept PLM Business integration scenarios – Opportunity for 2012 PLM Lyo showcase DATE2012 workshop –Gray to submit a proposal March 2010 –Kartik/Steve > OSLC Comms

Draft for discussion7 OSLC PLM roadmap discussion Backup

Draft for discussion8 OSLC PLM operational scenarios IdentifiedAdoptionSpec alignment Activity diagram Use-casesSequence diagram Tool support / examples Additional Docs Product coding & classification PLM Wiki page Requirements driven engineering DOORS 9PLM Wiki page Word doc SE responds to change of requirements #1 Yes Core, CM RM, AM Yes topcased Yes High level in Ppt Yes topcased TC 8 DOORS 9.3 Topcased OntoSTEP PLM Wiki page Overview doc Product change owner assigns CR to product context 1 Propose #2 Core, CM RM, AM Yes ppt Yes High level in Ppt YesOverview doc Management of SW changes PLM Wiki page Management of issues PLM Wiki page DOORS-RTC Req change handling 2 Shipped in 4Q10 product Uses CM2.0 Outline ppt Yes topcased DOORS 9.3 RTC 3.0 RM wiki User Guide 1 New build up as a prequel to the main scenario 2 Based upon existing OSLC RM scenario

Draft for discussion9 OSLC PLM WG Sandbox context Lyo CM2 provider Lyo RM2’ provider Lyo AM provider SCM provider Web Browser eclipse client Web Server repos TC8 repos plmxml PLM Importer RDF Validator Res Shape xmi topcased Draft RTC DOORS