Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.

Slides:



Advertisements
Similar presentations
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
PUNTO ENERGIA Experience in Implementing and installing co-generation and energy- saving schemes Eng. Michele Vio President of AICARR Eng.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Overview of Liquid Cooling Systems Peter Rumsey, Rumsey Engineers.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
EHN1 North Wall Dismantling Schedule Bastien Rae.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Cooling Water and Heat Recovery system Thomas Hjern Harald Bäck Design Leader Process systems Conventional Facilities Accelerator Review November 3-4,
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
ME444 ENGINEERING PIPING SYSTEM DESIGN
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
EHN1 Cryogenics Integration
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Lecture Objectives: Discuss Final Project
IT-4189 Supply and installation of a cryogenic distribution system
EHN 1 CO2 Leaks inside the beam lines
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
CERN Data Centre ‘Building 513 on the Meyrin Site’
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Budget specification EHN1 Extension: Infrastructure (WG2)
EN-CV Progress EHN1 Extension Project
Technical data‘s of lubrication pumps of oil loaded gas compressors medium : lubrication oil with flare gas Low pressure compressors on oil platform 6.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Cooling systems for HL-LHC (WP17.3)
CEDAR Detector Ventilation System Review
Bidder’s conference – 21st May 2013
COOLING & VENTILATION INFRASTRUCTURE
Insertable B Layer Cooling System
EN-CV: P8 systems and Detector Cooling
Oddgeir Gudmundsson, Jan Eric Thorsen and Marek Brand
Maintenance at ALBA facility: Strategy for the conventional services
Summary of the presentation:
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV

Content 10 May 2016 Technical Review 2 1.Project frame (EHN1 facilities) 2.Demineralized water 3.Chilled water 4.Fire fighting system 5.Compressed air 6.Raw water (= Mixed water)

EHN1 facilities 3 Location: CERN Prevessin site Building size: ~ 300 m × 50 m Building equipped with cooling, ventilation, powering and handling systems to cover experiments needs Building will be extended to house 2 new large-size detector prototypes  Future neutrino experiments Hall extension length: ~ 72 m 10 May 2016 Technical Review

EHN1 facilities 4 Old pipework configuration 10 May 2016 Technical Review Current pipework configuration GHN106 technical gallery - North wall/Saleve side

Demineralized water 5 DW requirements Cooling of the 20 additional electromagnets (H2 and H4 beam lines) 10 May 2016 Technical Review Required flow rate ~ 60 m3/h Required cooling power ~ 2.2 MW

Demineralized water 6 Future layout Extension of the existing DW pipework New pipes for H4 beam line only ! 10 May 2016 Technical Review New DW pipes GHN19 gallery

Demineralized water 7 P&ID DW distribution network 10 May 2016 Technical Review

Demineralized water 8 Pumping & cooling capacities Pumping station located at BA81 4 pumps 225 barg (direct drive) + 1 pump ‘stand-by’ 10 May 2016 Technical Review Flowrate and power balance: Cooling flowrate of existing magnets will be strongly reduced (M2, P42, H6, K12,…) Cooling flowrate recovered (at least) ~ 99 m3/h Versus new cooling flowrate ~ 60 m3/h Cooling power recovered ~ 3.6 MW Versus new cooling power ~ 2.2 MW  DW pumping station is enough sized for ensuring the future needs

Chilled water 9 CW requirements Supplying of the 8 fan coils for barracks air-conditioning 10 May 2016 Technical Review Required flow rate ~ 9 m3/h Required cooling power ~ 50 kW

Chilled water 10 Future layout Extension of the existing CW pipework 4 barracks on Jura side and 4 barracks on Saleve side 10 May 2016 Technical Review

Chilled water 11 P&ID CW distribution network 10 May 2016 Technical Review Note: 2-ways control valves are included in HVAC contract !

Chilled water 1210 May 2016 Technical Review Pumping & cooling capacities Pumps PED 0541 (&PED 0542 ‘stand-by’) / Breguet-KSB ETAC 125/50/ mwc / Frequency driver  PED 0541 pump is enough sized to supply the new 8 fan coils Flowrate and power synthesis (considering PED 0541 Available flowrate is ~ 34 m3/h Available cooling power is ~ 198 kW  limited by the pump capacity (Chillers cooling power margin is about 500 kW) chillers (1.2 MW power each one)

Firefighting system 13 HSE and project requirements Requirements defined in technical note EDMS rev 0.1 APSAD R5 design rules 55 mm ‘Storz connections’ requested by fire brigade 10 May 2016 Technical Review RIA cabinets location proposal

Firefighting system 14 Future layout Extension of the existing FF pipework DN 33 RIA barg 10 May 2016 Technical Review

Firefighting system 15 P&ID Firefighting system 10 May 2016 Technical Review

Firefighting system 16 Design justification See technical note EDMS rev operating cases studied 10 May 2016 Technical Review Simulation n°1: 3 RIAs supplied simultaneously:  Flow rates can be ensured

Compressed air 17 CA requirements TE-CRG needs 20 (maximum flowrate) Delivery points set at regular intervals (every ~ 10 m) Compression station capacity (Bld. 860): 2 compressors GA90 (780 m3/h) + 1 compressor (850 m3/h) = 2410 barg Actual consumption : ~ 850 m3/h Enough sized for EHN1 extension consumption need ! 10 May 2016 Technical Review

Compressed air 18 Air velocity inside main pipe 10 May 2016 Technical Review

Compressed air 19 P&ID CA distribution network 10 May 2016 Technical Review

Raw water 20 RW requirements UR are still pending ! Number, location and racks type… to be confirmed 4 solutions studied ( sent on 13 April by JR to Users) 10 May 2016 Technical Review Solution Cooling power [kW] Maximum number of racks (18 kW/rack) Budget impactSchedule impact 1724 (max 5)NO (max 20)Minor Some works during EYETS Major Most of the works during EYETS Major Some works during EYETS

Raw water 21 RW production and distribution KSB Pump PED0501 (PED0502): mwc GEA heat exchanger (CW 7-12°C / RW 17-22°C) RW flow margin ~ 60 m3/h (350 kW) Solutions studied See draft P&IDs annexed 10 May 2016 Technical Review

Thanks for your attention!