Infrastructure EHN1 extension Lau Gatignon, 7 March 2016.

Slides:



Advertisements
Similar presentations
Lau Gatignon / CERN for MDI team. MDI is very different between ILC and CLIC:  Organization wise (ILC in experiments, CLIC on machine side)  QD0 technology.
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
Overview of Liquid Cooling Systems Peter Rumsey, Rumsey Engineers.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
09 July EHN1 civil engineering project status (JUNE) Summary: Updating of the activities carried out on-site (Done) in JUNE List activities on going.
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
WEEK 1 You have 10 seconds to name…
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Baptism: No Water Down July 12, 2015 Baptism: No Water Down July 12, 2015.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
GSZAJNB818\MSSQLSERVER_SORD,1500 Table – OC_ST_Plan_Transactions_BPF GSZAJNB818\MSSQLSERVER_SORD,1500 Table – vw_Site_Action_Register_BPF Cancelled.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
25 June EHN1 civil engineering project status (MAY) Summary: Updating of the activities carried out on-site (Done) in MAY List activities on going.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
EN-CV activities for LHC during LS2
EHN1 Cryogenics Integration
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
CBETA Technical Review
EHN1 Extension planning
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Budget specification EHN1 Extension: Infrastructure (WG2)
EN-CV Progress EHN1 Extension Project
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
Spring-Ford Area School District
Solve: 1. 4<
Question & Suggestions March 17th
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Thing / Person:____________________ Dates:_________________
Updating the Transportation Impact Fee – The Proposed Calendar and Public Input Process Town Council Meeting March 15, 2017.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Infrastructure EHN1 extension Lau Gatignon, 7 March 2016

News Lau Gatignon, WA105 meeting2 Handover date civil engineering shifted to 16 September. A two-week period in July offered as compensation. Not obvious how to profit from this in view of legal and safety related constraints. Working on new planning and looking into the legal and safety aspects Impact on crane, protectionb of pits, access, …. MNP22 magnet can be removed when needed. Discussions under way on where to put it. Cryo has promised presentation for next week Specification of racks urgently needed. Chilled water cooling would be a major issue Cooling capacity issue for beam line magnets solved