SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.

Slides:



Advertisements
Similar presentations
General Information Software Robot Benri. Characteristics 1. Connect up to 16 cameras. 2. Do six different type of detections. 3. Define sub-areas where.
Advertisements

Training Purposes Only JEM EPO 17A JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
AZ Wing CAP Mission Aircrew Airborne Photographer Revision Jan 2015
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Stock Audit in Shoper 9 February 2010.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Discounted Cash Flow Valuation Chapter Six.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Determining the Target Cash Balance Chapter Twenty A.
Operations Section.
© 2004 Cisco Systems, Inc. All rights reserved. Managing Your Network Environment Managing Router Startup and Configuration INTRO v2.0—9-1.
Summary Photo Sources
Computer Startup Sequence Overview
Words + picturesPicturesWords Day Day
Tech Help CCAL Office. Contact Information  Technical Coordinator for CCAL, David Kleopfer  Make an appoint to.
 Go to YouTube and click “create account” on the top right of the page.YouTube  If you already have a Google account (i.e. gmail) then you may use this.
Factors and Multiples.
 In computer programming, a loop is a sequence of instruction s that is continually repeated until a certain condition is reached.  PHP Loops :  In.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
1 POIWG #38, July 2015 POIWG #38, July 2015 BIOTESC USOC, Switzerland Martin Haag & Jeannine Winkler BIOTESC
Visual Survey of HREP Ricardo C. Rodriguez POD Office Lead for HREP POIWG External Payload Splinter 25 Jul 2012 Approved for Public Release, Distribution.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
SURVEYOR Reporter - Overview SURVEYOR’s reporting module has an easy-to-use GUI interface, based on Microsoft Reporting Services Standard reports include:
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
SOC 110 Week 1 DQ 1 NEW Critical Thinking Video: Initial Child Protection Services Meeting Watch and discuss the "Initial Child Protection Services Meeting"
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Log on for Home Gym Reviews -
When I want to execute the subroutine I just give the command Write()
The Linux Command Line Chapter 10
Slope and similar triangles
Accounting Accounting collects information about users and processes
مديريت موثر جلسات Running a Meeting that Works
IBM Workload Automation
Chapter 11.
Storyboard Template Social Media Story For planning your
Scripts In Matlab.
Chapter 10.
C.2.10 Sample Questions.
© 2012 Elsevier, Inc. All rights reserved.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
VERSION CONTROL SVN (SubVersioN)
Level 1 +3SD +2SD +1SD Mean -1SD -2SD -3SD Level 2.
Copyright © 2013 Elsevier Inc. All rights reserved.
Chapter 12.
Chapter 6.
Forms.
© 2012 Elsevier, Inc. All rights reserved.
Chapter 01.
Chapter 08.
© 2015 Elsevier, Inc. All rights reserved.
Chapter 15.
Chapter 3.
© 2015 Elsevier, Inc. All rights reserved.
Presentation transcript:

SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University (SFU) Samples Order of Sample Numbers for Runs A, B, and C Baseline 6/28/12 PARC/M. Cash Crew Commanding Time Critical Unattended Additional Activities

BCAT-C1 OPERATIONS Initial Run: RUN A / SFU Sample 1 10 days BCATC1-SMPLX-A/PHOTO *#BCATC1-PL-REVIEW scheduled for any run operated by a new crewmember ** Historical photos of crew once during any SFU run :40 BCATC1-SFU_SMP-S/U_1 5 days :45:30 :10 BCATC1-INTERV-CHNG1 :10 5 days :15 BCATC1-IMAGE-XFER 1 – 2 days BCATC1-INTERV-CHNG2 ~6-8 hr BCATC1-SETUP-JEM :10 #BCATC1- PL-REVIEW* :30 2:10 BCATC1-VIDEO-SU :10 BCATC1-VIDEO-SU Baseline 6/28/12 :05 P/L-MPC-PLAYBACK P/L-MPC-PB START P/L-MPC-PB STOP For BCATC1-SETUP-JEM and BCATC1-SFU_SMP-S/U_1 Sample 1 only P/L-MPC-PB START P/L-MPC-PB STOP P/L-MPC-PLAYBACK For BCATC1-SFU_SMP-INIT and BCATC1-HW SU-PHOTOS Sample 1 only 4hr 2 hr Crew Commanding Time Critical Unattended Additional Activities BCATC1-SFU_SMP-INIT BCATC1-HW SU-PHOTOS :10 BCATC1-HISD-PHOTO** PARC/M. Cash JEM SD Video Camera For both days with SETUP-JEM, S/U_1, INIT, and HW SU-PHOTOS activities Crew checks Execution Notes for which Lens to use

BCAT-C1 OPERATIONS RUN B / SFU Samples 2-7 First Run 10 days BCATC1-SMPLX-A/PHOTO BCATC1-SFU_SMP-S/U_1 :40 5 days :45 :10 BCATC1-INTERV-CHNG1 :10 5 days :15 BCATC1-IMAGE-XFER 1 – 2 days BCATC1-INTERV-CHNG2 :30 BCATC1-HW SU-PHOTOS ~6-8 hr Baseline 6/28/12 PARC/M. Cash Crew Commanding Time Critical Unattended Additional Activities BCATC1-SFU_SMP-INIT JEM SD Video Camera For both days with S/U_1, INIT, and HW SU-PHOTOS activities *BCATC1-PL-REVIEW scheduled for any run operated by a new crewmember

BCAT-C1 OPERATIONS RUN C / SFU Samples 1-7 Second Run 10 days BCATC1-SMPLX-A/PHOTO BCATC1-SFU_SMP-INIT BCATC1-SFU_SMP-S/U_2 :20 5 days :45 :10 BCATC1-INTERV-CHNG1 :10 5 days :15 BCATC1-IMAGE-XFER 1 – 2 days BCATC1-INTERV-CHNG2 ~6-8 hr Baseline 6/28/12 Crew Commanding Time Critical Unattended Additional Activities JEM SD Video Camera For both days with S/U_2 and INIT activities *BCATC1-PL-REVIEW scheduled for any run operated by a new crewmember

Run (Sample Number) D (8) G1Video E (8) D (9) E (9) D (10) E (10) BCAT-C1 New York University (NYU) Samples Order of Sample Numbers for Runs D and E Baseline 6/28/12 PARC/M. Cash Crew Commanding Time Critical Unattended Additional Activities

20 days BCATC1-SMPLX-A/PHOTO :40 10 days :30 :10 BCATC1-INTERV-CHNG3 :15 BCATC1-IMAGE-XFER BCATC1-HW SU-PHOTOS :30 10 days 1 – 2 days :10 BCATC1-VIDEO-SU :10 BCATC1-VIDEO-SU BCAT-C1 OPERATIONS RUN D / NYU Samples 8-10 First Run (Ops note to specify video for sample 8 only) Baseline 6/28/12 :05 P/L-MPC-PLAYBACK P/L-MPC-PB START P/L-MPC-PB STOP :05 P/L-MPC-PLAYBACK P/L-MPC-PB START P/L-MPC-PB STOP For BCATC1-NYU_SMP-S/U_1 Sample 8 only For BCATC1-NYU_SMP-INIT Sample 8 only PARC/M.Cash 2 hr 1 hr Crew Commanding Time Critical Unattended Additional Activities :10 BCATC1-NYU_SMP-S/U_1 BCATC1-NYU_SMP-INIT BCATC1-HISD-PHOTO** JEM SD Video Camera For both days with S/U_1, INIT, and HW SU-PHOTOS activities *BCATC1-PL-REVIEW scheduled for any run operated by a new crewmember ** Historical photos of crew once during any NYU run

20 days BCATC1-SMPLX-A/PHOTO BCATC1-NYU_SMP-INIT :20 10 days :30 :10 BCATC1-INTERV-CHNG3 :15 BCATC1-IMAGE-XFER 10 days 1 – 2 days BCAT-C1 OPERATIONS RUN E / NYU Samples 8-10 Second Run BCATC1-NYU_SMP-S/U_2 :30 BCATC1-HARDWARE-STOW** Baseline 6/28/12 PARC/M. Cash Crew Commanding Time Critical Unattended Additional Activities JEM SD Video Camera For both days with S/U_2 and INIT activities *BCATC1-PL-REVIEW scheduled for any run operated by a new crewmember **Performed only once, after Sample 10 is complete

BCAT-C1 PPO Change Log Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Baseline31/32 & Subs 6/28/12Nominal: 11.83Inc 31/32 Working PTP 5/9/12 Nominal: Reserve: Crew Roll-up for sample 1: Runs A&C, and sample 2: Runs B&C, for Inc31/32 PARC/M. Cash Baseline 6/28/12 *Crew rollup is not maintained real-time