The 96 Chann FED Tester: Greg Iles2 September 20031 96 Channel FED Tester Status –Prototype now fully populated with AOHs. –Forced to borrow seven 2-channel.

Slides:



Advertisements
Similar presentations
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Advertisements

TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
Quiz – An organic liquid enters a in. ID horizontal steel tube, 3.5 ft long, at a rate of 5000 lb/hr. You are given that the specific.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
LightABLE Production Status ID Week October 2014 Tony Weidberg1.
Summary of thermal conduction gas tests for ANITA Goal: To measure the heat transport of different gases in a force-convection condition.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
3 rd Grade Energy Vocabulary. What do we call thermal energy that moves without touching anything? ___________________________.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Chapter Eleven: Heat 11.1 Heat 11.2 Heat Transfer.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Status of NA62 straw electronics Webs Covers Services Readout.
HEAT 11.2.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
Temperature and Heat. Temperature Kinetic energy is the energy that matter has due to the movement of that matter or within the matter Kinetic energy.
23 October 2003Martin Postranecky, UCL CALICE CERC Testing Page 1 PRODUCTION BOARDS TESTING 1)9x PCBs 2)16x SCSI each = 144x Connectors 3)~ 70x SCSI Cables.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
UNDERSTANDING HEAT TRANSFER: CONDUCTION, CONVECTION AND RADIATION.
Bottom half – ch 0-5 placed & routed FE PS PROC FIFO TRIG OSC RX/SHAP ADC DAC VME.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
FEE Electronics progress PCB layout 18th March 2009.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
FED Temperature Measurements: Greg Iles31 March FED temperature measurements –Will components on FED exceed operating temperature in CMS? Analogue.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
DOM Thermal Test Sept X.Bai, D.Swarnkar,. 26”(L) X 28(1/4)”(W) X 20”(H) blue board box filled with fiber glass insulation blue board insulation.
Optical Calibration Updates Presentation for SK-UK Meeting 2016 Neil McCauley, Lauren Anthony, Adrian Pritchard, Joachim Rose 1.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
HE FEE Boards production status 26 th May 2016 Mandakini Patil 1.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Calorimeter Mu2e Development electronics Front-end Review
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Barrel TRT Module Cooling
Physical Science Chapter 6
PRODUCTION BOARDS TESTING
PRODUCTION BOARDS TESTING
Then cut lines (top sheet only!)
Chapter Eleven: Heat 11.1 Heat 11.2 Heat Transfer.
Notes 6: Transferring Thermal Energy
Presentation transcript:

The 96 Chann FED Tester: Greg Iles2 September Channel FED Tester Status –Prototype now fully populated with AOHs. –Forced to borrow seven 2-channel AOHs due to late delivery of the AOHs we requested. 17 optical channels instead of 24 Our sixty-four 3- channel AOHs should arrive late Sept. –Optical output of AOHs NOT yet tested !!!

The 96 Chann FED Tester: Greg Iles2 September Temperature Control of AOHs AOH temperature control working at present, but not optimum. –Bottom AOHs -> too cold, top AOHs too hot –Hot air rising inside perspex box. Improve ventilation in perspex box. –Balance between available heating power and cooling effects Some extra heating power possible Insulate backside of PCB Temp sensor measures AOH temperature via thermal bridge Perspex part of AOH support (not visible) insulates it from the PCB Power dissipated here and conducted to AOH via thermal bridge Combined ADC & DAC measures temperature and modulates heating power FPGA measures temperature, performs PID calculation to calculate heating power required I2C bus

The 96 Chann FED Tester: Greg Iles2 September Fibre Mayhem AOHs a very long time ago with 1m of fibre pigtail.... –After 96 chan concept developed (Feb/March) we tried to reduce the fibre pigtail length => Not possible At present we have approx 3x1.5m and 7x2x0.56m = 11.5m In future we will have 24x1m = 24m –The 4 fibre reels doesn’t quite work because of insufficient room for cable and connector insertion. Ad-hoc solutions works for 13m, but is it OK for 24m ? Long-term is this OK ?

The 96 Chann FED Tester: Greg Iles2 September Data from FE0 (Jon ?) Very preliminary data from front-end FPGA –ADC sampling point not correct –2 channels not working...(one saturated, the other at zero) –Need to modify configuration file to drive all 12 channels with the same pattern.

The 96 Chann FED Tester: Greg Iles2 September Data from FE1 (Jon ?) Very preliminary data from front-end FPGA –Again ADC sampling point not correct –1 channels not working...(set at midlevel)

The 96 Chann FED Tester: Greg Iles2 September Conclusions When do we order a further 4 FED Testers ? –It will take 4 weeks for further FED Tester to arrive Remaining 3 FED Testers arrive 2 weeks later –Ideally like to sort out the following first Thermal management of AOHs Fibre optic cable management – Better solutions ??? Understand data arriving at FED –Minor corrections to artwork. Ready to generate artwork files...