M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.

Slides:



Advertisements
Similar presentations
Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.
Advertisements

1 st Petal Prototype Fabrication completed October 27, 2008.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
ATLAS Frame PRR 1 W.O. Miller Feb US ATLAS Pixel Detector Global Supports PRR W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G. Gilchriese, E.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
M. Gilchriese Evaporative Cooling Tests of Pixel Disk Sectors June 2000 E. Anderssen, M. Gilchriese, F. Goozen, F. McCormack, J. Taylor, T. Weber, J. Wirth.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
Global Supports Update W.O. Miller October 2001 US ATLAS Pixel Detector Global Supports Status W.O. Miller, R. Smith, W.K. Miller, G. Hayman, R. Baer HYTEC.
M. Gilchriese Disk Rings and Assembly M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report September 28, 2000 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber,
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Update February, 2001 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber, F.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
ATLAS Pixel Detector Cooling Services Joining Techniques: Progress Report December 13, 2000 N. Hartman, E. Anderssen, M. Gilchriese, F. Goosen, T. Johnson,
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Global Supports CDR 1 W.O. Miller July 2001 US ATLAS Pixel Detector Disk Ring/Frame Status Review W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
M. Gilchriese Disk Sectors M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
M. Gilchriese Pixel Update October 3, M. Gilchriese 2 Outline Barrel status and repair strategy Revised ATLAS installation schedule Finishing pixel.
M. Gilchriese Stave Prototype Status Summary July 5, 2006.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
M. Gilchriese Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, J. Wirth October 11, 2001.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
M. Gilchriese - September 2000 Pixel Insertable Layouts September 2000.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort December, 2001 N. Hartman,
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
QCG Report Francesco Forti University and INFN, Pisa.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
M. Gilchriese Upgrade Stave Mechanics(Only) Status September 16, 2006.
Beam Pipe and Service Support Structure Production Progress
Design and fabrication of Endcap prototype sensors (petalet)
Presentation transcript:

M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J. Wirth and D. Uken Lawrence Berkeley National Laboratory W. Miller HYTEC, Inc

M. Gilchriese - February Design Sectors alone –ProE model has been checked into the LBNL drawing system. –“Flat” drawings have been/are being put into EDMS –Tooling drawings to be done in ProE and handled similarly –No major changes in design(except see below) but many minor changes as all dimensions, tolerances, etc are checked –Sector-section of Local Supports Requirements document updated. Disk model –Previous layout had disk support ring of 1 st disk(one closest to IP) reversed to provide more room for barrel services. This caused sectors for Disk 1’s to be different than sectors for Disk 2 and 3. –Decided to make all the same - reverse all disks => all sectors identical –Added benefit is that disk support ring can now be used for strain relief of tubes and pigtails using glued-on features on the disk support ring. –Disk model updated with latest design from Hytec but not yet checked into LBNL drawing system or into EDMS. This should be done shortly.

M. Gilchriese - February Sector Model Tube extended to pass over disk support ring All disks will now be like this

M. Gilchriese - February Frame Model Frame model has been updated to new envelopes and revised disks. Next step is cone/barrel interface and also length.

M. Gilchriese - February Prototypes Little new One sector is slowly being irradiated at LLNL source TV holography system commissioned at LBL –First sector measurements made and look OK(well within spec) –TVH system returned to Hytec for upgrade to in-plane measurements. Back in March. Materials on hand for building three more prototypes to current design dimensions. –One will use CGL to bond to Al tube. –Two will use AIT EG7658, a rigid bonding. –Current baseline with CGL has passed all tests and meets all requirements so far…but clearly a rigid bond is more comforting. Will start about now tests exposing sector(actually piece already irradiated to 50 Mrad) to C3F8 vapor to begin test of possible effects in case of maximum leak rate.

M. Gilchriese - February Production Aluminum tubes ordered. Minimum order will cover full production. Delivery by mid-June. Carbon-carbon plates for sectors and disk ring facings ordered. Also production order(20 plates). Delivery by early June…but have some concerns related to power crisis in California (furnace time).. Other materials(foam, cyanate ester, etc) have much shorter lead times, will order in coming months. Detailed production schedule. Will begin to measure progress vs plan in formal way(monthly status, % complete, etc) in April.

M. Gilchriese - February Frame Drilling Have started tooling for drilling precise holes in frame to locate disk mounts. Will try on prototype frame. Tooling under fabrication( )