GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 6 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
ISOC/SVACInstrument Analysis Meeting, Quatorze Juillet, 2006 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review LAT Requirement Verification Presentation 5 of 12 GLAST Large Area Telescope Gamma-ray Large Area.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
GLAST LAT Project5 April 2006 LAT System EngineeringLAT Verification Process GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
Environmental Test Planning
GLAST Large Area Telescope
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST LAT System Engineering
Thermal Vacuum Test: Plans and Procedures
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST LAT System Engineering
Integration and Test Organization Chart
Mechanical/Thermal Systems
Environmental Test Planning Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope LAT Test Planning Meeting Rich Baun SLAC (650)

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 2 Agenda  LAT Level Test Sequence  Baseline LAT Level Test Sequence  Test Groupings  LAT Environmental Test Sequences  Redundancy Configurations

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 3 LAT Level Test Sequence Final Pre-TV Sine VibeEMI/EMC LL Mount Radiators Acoustic L T-CycleT-Bal Remove Radiators Weight CG Ship to Spectrum C L L Receive, Unpack L T L Pack LAT L CSSCS Baseline FCS at SLAC Ship to NRL L LL Pre Post-Axis CS/CERS/RE L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E TCS Functional Test EMI/EMC Emissions/Susceptibility Test L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E TCS Functional Test EMI/EMC Emissions/Susceptibility Test Rev date: 8 June 2005 Full LAT Functional and FSW/HW Interface Test Thermal Vacuum Chamber

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 4 Baseline LAT Level CPT Test Sequence Basic Function Validation Register Tests Subsystem Response with LAT wide Functions Cross-strap LPTs LAT Performance Baseline Muons E2E T&DF Muon Tests Abbreviated CPTs Operational Settings LAT Characterization Timing LCI Calibration SVAC Muons Full LAT SVAC Tests Initialization Infrastructure Tests = Redundancy tests required Baseline CPT

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 5 Baseline CPT - Test Groupings (1/4)  Basic Function Validation –Purpose Initialization –Validate FSW conducted LAT initialization sequence –Prove FSW interfaces with flight hardware Infrastructure –Validate all LAT operational functions such as command, telemetry, Configuration and LCI files, FSW File Management, et. al. Register Tests –Utilize FSW utilities to verify function of all LAT registers

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 6 Baseline CPT - Test Groupings (2/4)  Subsystem Response –Purpose Abbreviated Comprehensive Performance Test (CPTs) –Verify subsystem performance remains in spec in LAT wide environment –Demonstrate the complete health of each subsystem –Collect trend data –Run in only all prime and all redundant configurations Limited Performance Tests (LPTs) –Perform quick check of subsystem performance in cross-strapped redundancy configurations –Prove functional

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 7 Baseline CPT - Test Groupings (3/4)  LAT Characterization –Purpose Initial Instrument Functional –High-level validation of the LAT as an integrated scientific instrument Timing –Measure and adjust LAT wide timing Calibration –Calibrate the LAT using LCI and Muons Operational Settings –Determine/adjust LAT operational settings as precursor to LAT Level Performance tests

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 8 Baseline CPT - Test Groupings (4/4)  LAT Performance –Purpose Baseline Muons –Establish Instrument Level baseline performance with Muons E2E Muon Tests –Verify T&DF performance using Muons Full LAT SVAC Tests –Collect necessary data for analysis to verify LAT meets all requirements in the SRD

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 9 Post-Ship LAT Test Sequence Basic Function Validation Register Tests Subsystem Response with LAT wide Functions Cross-strap LPTs LAT Performance Abbreviated CPTs Muon Runs Initialization Limited Infra Tests = Redundancy tests required Post-Ship Limited Performance Test

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 10 Post-Ship LPT - Test Groupings (1/2)  Basic Function Validation –Purpose Initialization –Prove all LAT interfaces not effected by shipment Limited Infrastructure –Validate core LAT operational functions such as command, telemetry, and Configuration and LCI files Register Tests –Utilize FSW utilities to verify function of all LAT registers post-ship

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 11 Post-Ship LPT - Test Groupings (2/2)  Subsystem Response –Purpose Abbreviated Comprehensive Performance Test (CPTs) –Verify subsystem performance remains in spec post-ship –Demonstrate the complete health of each subsystem post-ship –Collect trend data, establish baseline at NRL –Run in only all prime and all redundant configurations Limited Performance Tests (LPTs) –Perform quick check of subsystem performance in cross-strapped redundancy configurations post-ship  LAT Performance –Purpose Muon Run –Establish Instrument Level post-ship baseline performance with Muons

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 12 Sine Vibe LAT Test Sequence Basic Function Validation Register Tests Subsystem Response with LAT wide Functions Cross-strap LPTs LAT Performance Abbreviated CPTs Muon Runs Initialization Limited Infra Tests = Redundancy tests required Sine Vibe Limited Performance Test  Sine Vibe LPT repeated 4 times, one pre Sine Vibe and once after each axis

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 13 Sine Vibe LPTs - Test Groupings (1/2)  Basic Function Validation –Purpose Initialization –Pre-Sine Vibe: Prove all LAT interfaces not effected by move –Post Sine Vibe Axis: Prove all LAT interfaces not effected by Vibe Limited Infrastructure –Validate core LAT operational functions such as command, telemetry, and Configuration and LCI files post move and vibe Register Tests –Utilize FSW utilities to verify function of all LAT registers post move and vibe

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 14 Sine Vibe LPTs - Test Groupings (2/2)  Subsystem Response –Purpose Abbreviated Comprehensive Performance Test (CPTs) –Verify subsystem performance remains in spec post move and vibe –Demonstrate the complete health of each subsystem post move and vibe –Collect trend data, compare to previous runs at SLAC and NRL –Run in only all prime and all redundant configurations Limited Performance Tests (LPTs) –Perform quick check of subsystem performance in cross-strapped redundancy configurations post move and after each axis  LAT Performance –Purpose Muon Run –Establish Instrument Level performance with Muons post move and after each axis

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 15 Post Radiator Installation = Redundancy tests required  TCS LPT –Contents TBD

GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting 16 EMI/EMC Test Sequence = Redundancy tests required Basic Function Validation Register Tests Subsystem Response with LAT wide Functions Cross-strap LPTs LAT Performance Abbreviated CPTs Muon Runs Initialization Limited Infra Tests EMI/EMC Test Sequence EMC CECS EMI RERS Post EMI/EMC LPT LAT Performance Basic Function Subsystem Response