CLBv2 issues Diego Real 5 March 2015. https://isvn.ific.uv.es/repos/KM3NeT A SVN repository created for KM3NeT svn+ssh://isvn.ific.uv.es/repos/KM3NeT.

Slides:



Advertisements
Similar presentations
April 30, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Advertisements

EES: Burn – in test Eliminate infant mortality: Not possible to detect it with AOI, FPT, X-ray or ICT! 1.
1. THE OSIRIS TUNABLE FILTERS  OSIRIS uses two 100 mm aperture Fabry-Perot tunable filters. One of them is optimized for short wavelengths, and one for.
Target Control Electronics Upgrade 08/01/2009 J. Leaver P. Smith.
System Development Life Cycle (SDLC)
October 8, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Series 2: Project Management Advanced Project Management for Behavioral Health Electronic Health Records (EHRs) 9/2013 From the CIHS Video Series “Ten.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
P. Jansweijer Nikhef Amsterdam Electronics- Technology October 15, 20091VLVnT-09 Athens Measuring propagation delay over a coded serial communication channel.
CLBv2 Planning: Production of 6 prototypes -> December st Pre-serie 50 units -> April 2014 (following with the current planning) (Need to purchase.
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
1 G4MICE Design Iteration Malcolm Ellis MICE Video Conference 21 st April 2004.
February 26, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
August 06, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
July 10, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
May 29, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
Meeting LePix Bologna dicembre 2010 D Pantano DAQ boards status DAQ BOX sistems: DAQ BOX sistems: 2 DAQ BOX at CERN 2 DAQ BOX at CERN In Padova all is.
December 04, 2013KM3NeT, CLBv2 Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
January 28, 2015CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
August 22, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
July, IFIC (CSIC – Universidad de Valencia) CLB: MULTIBOOT 1.
TEL62 update Franco Spinella INFN-Pisa 28/3/2012 CERN- TDAQ WG.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Receiving 91 PB this week: A little bit more of work load! (We will be for a while production guys :) Test bench separated in two parts: 1.- The PB will.
December 10, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
29 Oct, 2014 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
LM32 DEVELOPMENTS ONGOING WORK ON TDCs AND OTHER ISSUES (LM32) Diego Real David Calvo CLB group online meeting, 27 March
March 27, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology November 21, 2012KM3NeT, CLBv2 Meeting via EVO KM3NeT CLBv2 1.
CLB meeting APC Tentative action/work list.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Status of ARGUS support Peter Solagna – EGI.eu.
Electronics Department Amsterdam 5-July-2010 Sander Mos 1 Status and progress of NIK* Logic WPFL - 5 July 2010 Amsterdam * Network Interface Kit.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology September 19, 2012KM3NeT, CLB/DAQ Videocon KM3NeT CLBv2 1.
July 31, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
CEA Saclay – Institute of research into the fundamental laws of the Universe PPM DU Pre Production Model Detection Unit Status and plans Th. Stolarczyk.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
October 29, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Test boxes software and first tests V. Kulikovskiy.
April 10, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
2 protos in MASER (One in Valencia, One sent to Nikhef)
DAQ read out system Status Report
Alessandro Lonardo Referente Locale TT Sezione di Roma 1 Piero Vicini
“FPGA shore station demonstrator for KM3NeT”
WBS 1.03 Readout Systems Scope, Cost and Schedule
Concluding remarks E. Migneco
TileCal upgrade EVO meeting Demonstrator tesks
CLB development at INFN Genova
Kostas Manolopoulos Tasos Belias
System Development Life Cycle (SDLC)
10/month is the present production rate 2 FTE + sporadic contributions
Next steps - with notes from during the meeting 24 March 2016
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
HL-LHC upgrade at IPHC news
ASIC to FPGA Conversion
ANTARES Budget - Common Fund and new MoU
Detector Proto-Technical board Sep 30, 2010
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

CLBv2 issues Diego Real 5 March 2015

A SVN repository created for KM3NeT svn+ssh://isvn.ific.uv.es/repos/KM3NeT Access via https or ssh: Two possibilities to access : To use a cern account. Send to Diego Real to allow permission to the repository. (already To those that do not have a cern account the IFIC is preparing a restricted IFIC account to allow access to the repository. Under test at the moment 2

6 KC705 requested in a coordinated way for KM3Net: 1.- APC 2.- Nikhef 3.- INFN – Genova 4.- IFIC 5.- INFN – Bologna 6.- NOA - UA UNIVERSITY PROGRAM For the moment 2 approved to the IFIC (It was requested only one!) Expanding an original idea by Annarita Margiotta

Evaluating Altera would also interesting. It will increase KM3NeT bargaining power. Arria V of Logic elements costs 80 $ (5000 pieces) and Altera claims that the power consumption is lower than the Xilinx equivalent (70T) NOA and UA (Tasos and Kostas) are requesting funding for migrating the CLBv2 design to the Arria V FPGA Altera has compromised to proportionate 2 Arria V Evaluation Boards to support the migration

They have started to prepare the application to Eurostarts: Next week they will provide a document explaining the project to a pool of companies from Italy interested in the Eurostarts application. S7 have also one possible partner in Germany

To explore the possibility to use the technology developed for CLBv2 to obtain more funding: PF7 for next year (S7-Nikhef-IFIC-NOA-UA-INFN Genova- INFN-Bologna- APC) Funding for groups from countries not signing the MoU Funding for groups with money blocked for other developments

Steering Comitee

Design, Preparation of the Production, Organization of the Production and the Validation:  Shore Station  CLBv2 (and associated instrumentation) o Firmware o Embedded software o Hardware  Octopus Board  PMT Bases

These tasks have to be coordinated with other groups: DAQ group Instrumentation group Quality group Electronics group

CLBv2 – Leo Wiggers Nikhef (2) Peter Jansweijer Mesfin Gebyehu Vincent Van Beveren IFIC (1.5) David Calvo Diego Real INFN – Genova (2) Vladimir Kulikovskiy Paolo Musico 1 Post-doc (April) 1 Physics (April) INFN – Bologna (0.5) Simone Biagi Reliability APC (0.5) Sthèphane Colognes On-shore Station NOA - UA (0.2) Kostas Manolopoulos Tasos Belias CLBv2 Hardware: Seven Solution – Eurostarts Application Octopus Board Nikhef Jan-Willem Schmelling PMT Bases Nikhef Electronics group Diego Real

PMT Bases Design almost finished Preparation to the production already started Exists already a cost estimation for massive production Octopus board Design almost finished. Some small modification needed Preparation of the production not started yet Man power needed to continue these tasks Not prioritary ….. For the moment

CLBv2: 1º KC705 evaluation board for prototype: Firmware development Test of the design 2.-CLBv2 hardware prototyping + validation 3.- Establishment the CLBv2 test bench 4.- Preparation of the production 5.- Production + validation 6.- Delivery to the integration sites Once finished the design on the KC705 two lines of actuation to do in parallel to the main line depending resources: 1º Downgrade the design to ARTIX (reducing cost) 2º Migrate and evaluate ALTERA and Lattice (increasing bargaining power)

To explore the possibility to use the technology developed for CLBv2 to obtain more funding: PF7 for next year (S7-Nikhef-IFIC-NOA-UA-INFN Genova- INFN-Bologna- APC) Groups from countries not signing the MoU Groups with no Funding for KM3NeT developments