FGM Report 17 th Cross Calibration Workshop Chris Carr, Elizabeth Lucek, Patrick Brown, Leah-Nani Alconcel, Barry Whiteside, Tim Oddy, Peter Fox, André.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
STAFF Report. 1.Status of data delivery 2.Delivery Plan 3.Status of data pipeline 4.STAFF/FGM cross calibration 5.Conclusions 2 15th Cross-Calibration.
FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
1 10th CAA Cross-Calibration meeting, Paris, 2-4 November 2009 STAFF/SC cross-calibration activities Patrick ROBERT, C. Burlaud & STAFF Team 2) The Calibrated.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
PDS M/C November 2012 PPI Data Migration Planning PPI PDS4 Data Migration Planning PDS Management Council November 28, 2012 T. King.
CAA 9th Cross-Calibration Workshop, Cambridge, England, 25th-27th March CLUSTER / STAFF ● status of calibration and archiving activities ● archiving.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
1 12th CAA Cross-Calibration meeting, Toulouse, Oct 2010 STAFF/SC Calibration & Cross-Calibration activities Patrick ROBERT & STAFF Team, LPP 2)
Cassini Archive Tracking System (CATS) Report Engineering Node November 30, 2006
1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
20 th CAA Cross-Calibration Workshop MPS, Göttingen, Germany Oct ESOC datasets.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
21 th CAA Cross-Calibration Workshop Leiden, Netherlands24-26 March ESOC datasets.
Cluster Active Archive 1 Drift Velocity/Electric Field Comparison: CIS, EDI, EFW, FGM Jonathan Kissi-Ameyaw Cluster Active Archive ESTEC.
9 th CAA Cross-Calibration Workshop, Jesus College, Cambridge, UK, March /17 CAA Graphics: Pre-generated/On-demand Panels and Cross-Calibration.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
CAA PEACE Status A.N. Fazakerley, I. Rozum, B. Mihaljcic.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
FGM report 5 th Operations Review of the CAA Elizabeth Lucek, Patrick Brown Chris Carr, Tim Oddy, André Balogh I mperial College London June 9 th 2010.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
20th CAA Cross Calibration Göttingen - October 15-16, 2014 Status of CIS Data Archival I. Dandouras, A. Barthe.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
Status of EDI Archiving and Calibration Activities March 25-26, 2013 Darmstadt.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, G. Watson, C. Anekallu UCL Department of Space and Climate Physics Mullard Space Science Laboratory 21.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
Investigation of a discrepancy between magnetic field magnitudes determined by the FGM and EDI instruments Jonny Gloag, Edita Georgescu, Elizabeth Lucek,
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, N. Doss, G. Watson UCL Department of Space and Climate Physics Mullard Space Science Laboratory 18 th.
16 th CAA Cross-Calibration Workshop IRAP, Toulouse, 6-9 November20121 Data gaps and spikes in FGM data.
8 th Cross-Calibration Workshop, Kinsale, Ireland, October 20081/14 Draft Replies and Actions to the Recommendations of the Review Panel for Final.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
21 th CAA Cross-Calibration Workshop Leiden, Netherlands24-26 March Introduction.
FGM report 9 th Cross Calibration Workshop Paul French, Elizabeth Lucek, Chris Carr, Patrick Brown, Tim Oddy, Andre Balogh Imperial College London March.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Cluster Active Archive
Status Report of EDI on the CAA
Cluster data sets P-A Lindqvist, KTH
CIS Data Archival Status
Cluster Active Archive – Wideband data BM2 mode
CSA Implementation overview since OR-8 Test campaigns Scheduled development plan Arnaud Masson CSA/CAA Operational Review 9 ESTEC, 04-June-2014.
20th CAA/DAA Cross Calibration Meeting
EDI – CAA STATUS REPORT EDI CAA Status
CAA-OR (End of Phase 1) CAA DWP Operations Review
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Annual Report of the DWP Experiment 9th CAA Operations Review
Annual Report of the FGM Experiment for the 8th Operations Review of the Cluster Active Archive (CAA) Chris Carr, Leah-Nani Alconcel, Patrick Brown,
10th CAA Operations Review Annual Report of the FGM Experiment
Measures of Model Performance
PAIN OUT network in Mexico
EMPLOYER TESTING On-Going Employees (one who has been with the employer for at least one standard measurement period) STANDARD MEASUREMENT PERIOD 3 – 12.
NGMS - Software workshop pre-release PR08 Archiving
2010 Nov 2011 January February March April May June July
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Presentation transcript:

FGM Report 17 th Cross Calibration Workshop Chris Carr, Elizabeth Lucek, Patrick Brown, Leah-Nani Alconcel, Barry Whiteside, Tim Oddy, Peter Fox, André Balogh ESOC March 2013

FGM Team Chris Carr – PI Patrick Brown – Instrument Manager Tim Oddy – Operations Engineer Leah-Nani Alconcel – Archive Engineer (on maternity leave) Peter Fox – Acting Archive Engineer Barry Whiteside - Calibration 17th Cross Calibration workshop March 25-27th

Primary FGM data delivered to CAA: Jan 2001 – April 2012 Magnetic field data: Full resolution, 5 vectors/second, spin averaged –Supporting files: GAPF (data gaps in processed data); VALF (data gaps introduced at validation stage – small number, generally only affects a few vectors at a time) Supporting FGM files delivered to CAA: Jan 2001 – April 2012 CAVF: caveat files provided only when data quality is affected by external effects –CALA: calibration accuracy files: No longer required Outlook –Routine data calibration has resumed after a pause during the tail season. –May, June and July 2012 will be delivered shortly. –Full dataset from 2012 estimated to be delivered by mid-2013 CAA Status of Data Submission 317th Cross Calibration workshop March 25-27th 2013

Server Migration –New servers have been installed. –Data and software have been transferred –Full-scale test of calibration pipeline on new machines will be carried out shortly. Calibration software maintenance –Calibration software for several parts of the pipeline have been over-hauled, leading to a substantial improvement in processing time. –All other things being equal, a month’s worth of data can now be calibrated in a little over a week. Paper for CAA cross-calibration results issue –Being written. –Will discuss the stability of FGM calibration parameters over time. Other Activities 417th Cross Calibration workshop March 25-27th 2013

FGM Action Items 17th Cross Calibration workshop March 25-27th

6 FGM Action Items