DESIGN OF POLE CLIMBER FIRST MODE ENGINEERING: DAVID BRUNEAU – 201033750 MICAH BROWN – 201011186 LIAM ARSENAULT – 201011558 JUNWEI CHENPENG - 200918605.

Slides:



Advertisements
Similar presentations
TODAY ADD LEGO rubric to end of your lab write-up for LEGO NXT
Advertisements

Prototype Development of Automated Ring Main Unit System
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Miniature Modular Rack Launcher Combo Senior Design Group 3 Casey Brown Cyril John Keith Kirkpatrick Bryan Rickards.
Group 4 Nick Hatcher, Andrew Taylor, Neil Barnes, Jakob Combs, Chris Cook.
Intel Reverse Osmosis Membrane Removal Tool Team Members:Ron Groeger Jr. Chris Rogers Mike Neuwerth William Dilg PSU Advisor:Dr. Sailor Intel Engineering.
Team Members Industry Contact Academic Advisor Dr. Faryar Etesami.
GROUP 9: SENIOR DESIGN DEANNA MCKENZIE MICHAEL D. BROWN WILLIAM THORNTON Gunnery Control Handle 1.
University of the Pacific 1 Parabolic Food Aid Delivery System Mishari Al-Nahedh Chia Lee Lisa Mak December 5, 2002 Engineering 5 Section 6 University.
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
University of the Pacific1 PFADS Project Team P.O.C. Gavin Saito Miguel Perez Michael Bruch December 5, 2002 University of the Pacific Introduction to.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Bridge Report By Jenny. Gina. Eunji. Matt Team 5.
TEAM FTP LAB 5 Project PFADS n Kyle Harris n Sang Huynh n Bhupinder Shergill n Eric Stolp.
Bridge Project Presentation Group #2 Alex Odle Matt Simon Salim Hamed Micael Thiodet.
FIRST Robotics A view from the Systems Engineering Perspective Chris Mikus January 2, 2006 Rev 0.2.
Catheter Tube Assembly Process
PASCOR Group PASCOR Group Industry Adviser: Craig Smit Product Engineer Faculty Adviser: Chien Wern, Ph.D. Team Members: Jeremie Bilisari Steve Greene.
Baltimore Tool Chisel Test Stand Baltimore Tool President: Harry McCarty Baltimore Tool Representative: Dennis Shewbridge Consultant: Peter Popper Team.
W IND –2– H 2 O MECH 4010: Design I Group 12: Jeffrey Allen Daniel Barker Andrew Hildebrand Supervised by: Dr. Alex Kalamkarov Client: Dr. Graham Gagnon.
Eglin 1 Design of Acoustic Sensor Eye Housing Eglin 1 Design of Acoustic Sensor Eye Housing Group Members: Erik Fernandez Kevin Garvey William Heffner.
IV Tubing Organizer Blake Hondl, Amit Mehta, Ryan Pope, Kristen Sipsma, April Zehm, Katie Zenker BME 200/300 October 10, 2003.
General Instructions for “KidWind Light” wind tunnel.
FLUID POWER Christopher Peterson Intro to Tech and Science Education.
Pioneer DreamBook Tough V10 Rugged Notebook. Light weighted V10 with fully rugged protection combining high security, full Wireless Access function, dual.
Software Engineering Management Lecture 1 The Software Process.
By: Carrie Brown, Jim Carter, Micah Walker, Conner Reynolds
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Modifying a Paintball Regulator for BBIQ. The Necessary Stuff Sourcing Parts and Supplies is an Important Engineering Skill.
Mini-Submarine Randy Draeger Grant Stockton David Upp.
AP-1 5. Project Management. AP-2 Software Failure Software fails at a significant rate What is failure? Not delivering it on time is an estimation failure.
Problem Statement Project Proposal Design a device that will reduce the time of a medial malleolus fracture repair surgery Design a device that simplifies.
The Modular Multi-Surface Cleaner Members: Ho Zi Ming (2I1) Chen Mingkai (2A4) Ang Yi-Ian (2A4) Mervyn Ng (2A4) Members: Ho Zi Ming (2I1) Chen Mingkai.
FurniCube™ Hyeok Chun YoungGyoo Hwang Hooly Sim Jordan Woods Group 4.
Somerset Berkley Regional High School Robotics Engineering with LabView.
Contractor Alternate Design Serving the Public’s Best Interest.
Dog Grooming tool Team 17 Justin Proctor, Roy Mason, Jordan Chupp, Dennis Pugh Sponsor: Engineering To Go.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
Design Process The design process is a method of planning practical solutions to problems. The design process is never final; there are always multiple.
The Journey to a West Coast Drivetrain
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
Instron ® – A World Leader in Materials Testing An overview of recent changes and challenges facing rebar manufacturers, suppliers, and consumers Challenges.
Randy Draeger Grant Stockton David Upp
Somerset Berkley Regional High School Robotics Engineering with LabView.
Presented by: Angela Smith ∙ Dennis Hugo ∙ Kevin Messer Marie Barraclough and Austin Hanson.
Concepts of Engineering Module 2 Test Review. Review Questions Design problems are broken down into sub- problems because smaller problems must be solved.
Science Design Challenge: Marshmallow Tower To build a tower as high as possible using spaghetti, string, and tape, that would ... There are many ways.
Mini-Submarine Randy Draeger Grant Stockton David Upp.
Fluid Power Challenge Introduction & Hints
Fluid Power Challenge Suggested Workshop Lessons
Software Engineering Management
FINAL PRESENTATION Western Michigan University Advisors:
Unit 1 What is Project Management
Life Vest Challenge.
Oxidizer Tank and Delivery Team
Transforming Organizations
Kyle Harris Sang Huynh Bhupinder Shergill Eric Stolp
P17082 Biomechanical Elbow Model Detailed Design
Basic Categories Proof of Principle Model Form Study Model
Fluid Power Challenge Suggested Workshop Lessons
Engineering Design Process
1/10 prototype support tube
PASCOR Group Industry Adviser: Craig Smit Product Engineer
By: L.A. Parwani, Tyler Roberts, Michael Matthew, and Matt Williamson
Construction: Building and Beams
Somerset Berkley Regional High School
Business Succession Planning
Presentation transcript:

DESIGN OF POLE CLIMBER FIRST MODE ENGINEERING: DAVID BRUNEAU – MICAH BROWN – LIAM ARSENAULT – JUNWEI CHENPENG (A MEANS TO ADMINISTER VIBRATION BASED STRENGTH TESTING FOR IN SERVICE UTILITY POLES)

PROBLEM Newfoundland and Labrador Hydro desire a numerical means of testing the strength of rural in service utility poles Let poles stay in service for longer Prevent catastrophic pole failure Allow trending of pole strength and failure conditions Current tests are insufficient or inefficient Auditory hammer test Fly-by and video capture “Pole Tester” Source: CBC

1 - Climbs Pole 2 - Places Sensors 3 - Applies Impact PROJECT DELIVERABLE

CRITERIA & CONSTRAINTS Device must: Be lightweight Deliver multiple impacts Scale tapered utility pole Place multiple sensors and remove Be rugged enough to not break

DESIGN METHODOLOGY For each module FME Delivered: 1.Rough Design 2.Physical Proof of Concept 3.Refined Design Refined design should be buildable by skilled technicians 1 23

BUDGET Proof of Concept Budget: $500 Refined Design budget of ~$10,000 Refined Design construction: out of Term 8 Project scope

COMPLETED DESIGN - ASSEMBLY OF MODULES Impact Module Sensor Placement Module Both are mounted on the Climbing Module

CLIMBING MODULE – FINAL DESIGN 1 2

Conforms to taper of pole

CLIMBING MODULE – TESTING Lego ModelFriction Test Proof of Concept

FINAL DESIGN OF IMPACT MODULE Hose Clamp and Support Brace CO 2 Tank Supported

IMPACT MODULE – PROOF OF CONCEPT TESTING Delivering and Recoil Force Testing

IMPACT MODULE – TESTING Testing Results – ~200 lbf from paintball impact

IMPACT MODULE – TESTING Recoil Analysis Test with Detached Paintball MarkerKickback Force Due to Recoil

IMPACT MODULE – IMPULSE OF DRY SHOT Hammer HitCO2 Shot

SENSOR PLACEMENT MODULE – FINAL DESIGN

SENSOR PLACEMENT MODULE – PROTOTYPE TESTING Held down with C-Clamps Test Wood Piece

SENSOR PLACEMENT MODULE – DUMMY SENSOR Testing Results

SENSOR PLACEMENT MODULE – FINAL DESIGN Sensor Case with Spike attached

Design and testing considered successful Hand over to future students Weight reduction Testing CONCLUSIONS

QUESTIONS ?

THANK YOU!

CLIMBING MODULE – SETUP ON POLE