The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240 sense wires Sense wires Potential wires Cathode CDF Central Outer Tracker
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 2 Field Sheet
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 3 Installation
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 4 COT Readout and Trigger
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 5 Expected Tracker Performance 3D tracking with high efficiency & purity Good momentum resolution with the COT Impact parameter resolution d (r ) ~ 6 20/p T [ m] d (rz) ~ 45 [ m] Efficient B tagging ~60 % efficiency in top ?
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 6 Oct 30 Nov 1: 36x36 store 34 4 x 10 **29 cm-2 s-1 –Establish operating points COT : different settings for discriminator thresholds & dE/dx width CLC : different settings for gas pressure, etc. –Establish triggers Level-1 : muon stub triggers, Min Bias & muon stub triggers, XFT Level-2 : running Level-2 processors, but not rejecting events, yet. Level-3 : testing filter modules, but not rejecting events, yet. –Online/DAQ system, online calibration & database, monitoring all work –Wrote > 5 million min-bias events with COT, silicon, Calor, Muons, etc –48 runs, 42 operator stop vs crash, Hz, Nov 2 Nov 3: 36x36 store 18 2 x 10 **29 cm-2 s-1 Nov 4 Nov 6: 36x36 store 35 3 x 10 **29 cm-2 s-1 ~Every Hardware and Software system was exercised ! Commissioning Run
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 7 First Collisions
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 8 Initial Performance Beam axis view COT track Residuals* = 242 m Stereo works YZ view *No alignment corrections, crude t 0 ’s and drift time to distance relationships, and no B-field corrections. We expect to reach or exceed our goal of 180 m resolution.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 9 36x36 store Nov. 3 : K o, reconstruction –Oppositely charged track pairs with large impact parameter and small z separation.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 10 EXtremely Fast Tracker (XFT) P T /P T **2 / **2 = 1.8% = 9mr Matching CMU Muon Stub Event triggered on XFT- muon match 2.3 Gev XFT track XFT Goals: Pt resolution < 2% : see = 1.8% resolution < 8 mrad: see = 9 mrad Will do better !
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 11 COT/XFT reconstruction
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 12 Beam offset offline d0 COT center line is off vertically by ~6 mm w.r.t. beamline XFT puts in beamline offset (roughly)