IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions.

Slides:



Advertisements
Similar presentations
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
Advertisements

The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Development plan and quality plan for your Project
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Effective Methods for Software and Systems Integration
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
DESY Participation in an External Experiment Joachim Mnich PRC Meeting
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Mini-2 and MMFE-8 Status at U. Arizona Kenneth Johns, Charlie Armijo, Bill Hart, Karen Palmer, Sarah Jones, Kayla Niu, Jonathan Snavely, Dan Tompkins University.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Converter Regulation Board Status WP PO 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Magnoni Luca Early Stage Researcher WP5 - ATLAS.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Type of funding scheme: STREP Work programme topics addressed: PHC 30 – 2015 Digital representation of health data to improve disease diagnosis and treatment.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
FP7-People-IAPP-2012 FTK - Project number: Paola Giannetti – INFN & University of Pisa 1 st EU Mid-Term Review meeting Brussels, November 7 th,
OUTLINE (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific.
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
Project number: Andreas Sakellariou – PRISMA ELECTRONICS 1 st EU Mid-Term Review meeting 7 November 2014.
Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
Calliope-Louisa Sotiropoulou C OGNITIVE I MAGING U SING FTK H ARDWARE M EETING ON M EDICAL I MAGING.
DISSEMINATION MEETING HEAT4U PROJECT Gas Absorption Heat Pump solution for existing residential buildings Luigi Tischer, Project Coordinator HEAT4U PROJECT.
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
Global Costs based on TP (6-10 y): ~1150 K€ Italy ~1150 K€ USA ~200 K€ Waseda ~300+ extra K€ new institutions Costs for 2013 run ~400 K€ Italy ~500 K€
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
IAPP - FTK workshop – Pisa march, 2013 Marco Piendibene – University of Pisa & INFN FTK and the AM system.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
ELENA installation progress F. Butin / ELENA collaboration.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
14.4. Readout systems for innovative calorimeters
Firmware development for the AM Board
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
IAPP - FTK workshop – Pisa march, 2013
FTK: update on progress, problems, need
FTK infrastructure in USA15 Status and plans for 2015 A
Project definition and organization milestones & work-plan
Summary of Deliverables & reached Milestones
AM system Status & Racks/crates issues
Pending technical issues and plans to address and solve
WP8 – Improvement and equipment of irradiation beam lines
Secondments & tasks Management meetings – Calendar
Early Stage Researcher: Panos Neroutsos
WP5: Dissemination, studies, web portal and tools
CMS RPC Endcap RE1 Status Report
BioMedBridges – Work Packages 2 & 12
Phase 2 R&D – Brief Introduction –
KICK OFF meeting - project presentation
Perugia SuperB Workshop June 16-19, 2009
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions

Participants UNIPI CAEN AUTH CERN PRIELE CNRS

List of Work Packages & WP leaders 1) Prototype Construction & Production Validation (PRIELE, M1-M42) 2) Infrastructure & Integration (CAEN, M1-M48) 3) Commissioning (CERN, M12-M48) 4) Architecture Simulation (UniPisa, M1-M48) 5) Image Processing (UniPisa, M25-M48) 6) Silicon Detectors (CNRS,M1-M48) 7) Outreach (AUTH, M1-M48) 8) Workshops & Trainings (AUTH, M1-M48)

Participation to Work Packages

WP1: Prototype Construction & Production Validation (Priele) Objectives Construction and standalone validation of an FTK processor based on Serial Link technology for Level 1 and Level 2 trigger applications Transfer of Knowledge to PRIELE for board assembly and validation and among all research institutions about Associative Memory technology on of SLP2 at PRIELE before integration at CAEN 128 AMchip04s Task 1: design Task 2: prototype design & assembly Task 3: prototype test

WP2: Infrastrucure & Integration (CAEN) Objectives Infrastructure construction and validation (racks, crates, power supplies, cooling) Validation/integration of prototypes from Europe, Japan and USA Software development for system test/control/monitoring Transfer of Knowledge among CAEN and research institutions Description of work T.2.3. Software development for tests of the VS T.2.4. Tests and validation of the baseline FTK system for the demonstrator After: T.2.2. Prototyping of a CAEN power supply for the final crate (5kW) T.2.5. Tests and validation of the SLP2-based system T.2.6. Tests and validation of the SLP1-based system T.2.7. Tests of cooling and mechanics of a rack with complete final crates SSB: Final Fit-HW DF USA ITALYUSA

WP3:Commissioning (CERN) Objectives Infrastructure installation and validation at point 1 (racks/crates/power supplies) Board installation/validation and running control/functional monitoring Transfer of Knowledge among CAEN and research institutions for board Commissioning/maintenance Description of work T.3.1. Installation of Infrastructures, validation tests & ToK T.3.2. Installation of boards (SLP2 or FTK baseline) for the demonstrator T.3.3. Tests and validation of the FTK demonstrator T.3.4. T.3.5 as T.3.2, T.3.3. for the first production T.3.6. T.3.7. as T.3.2, T.3.3. for the second production

WP4: Simulation (University of Pisa) Objectives Production of test vectors to validate hardware configurations Definition of Level 1/Level 2 architectures to optimize physics reach

WP5: Image Processing (University of Pisa) Objectives Test Associative Memory capability to extract relevant features from natural/medical images Evaluate impact on medical imaging/diagnosis and robotic automation

WP6:Silicon Detectors (CNRS) Objectives Optimizationof CAEN power supply for LHC pixel detectors (phase-II) Description of work T.6.1. Setup of a test bench for PS performance evaluation at CAEN T.6.2 Measurements on PSes equipped with undamaged readout chips (FEI4 devices) T.6.3. Optimization of PSes with irradiated devices T.6.4. Tests with optimized Pses

Documents: 90 MB Most relevant: 9 MB

Deliverables & reached Milestones Milestones this year Deliverables: who is going to write what Done & to be done of the Outreach plan

Milestone no. name WP Delivery Comments Leader date M.4.1. Demo general simulation ok UniPisa M6 Demonstrator simulated architecture ok basical AMBFTK simulation OK, see tests described by Kostas Kordas M.1.1. Slp2 prototype ok at Priele PRIELE M12 SLP2 prototype validated at PRIELE Ongoing work (see Marco’s and Saverio’s talks) M.1.2. Prototypes Atlas Review PRIELE M12 Atlas evaluation of FTK prototypes M.2.1. Demonstrator ok at Caen CAEN M12 Demonstrator runs flawlessly at Caen Integration with AUX card Deadlines under the corner: Milestones in 2013 AMBoard (a) SSB: Final Fit-HW DF Proto AUX

OUTREACH MILESTONES M.7.1.-M.7.3.Open Days results verificationAUTH M8, M20,M32 M.7.4. –M.7.6.WorkS. days results verification AUTH M6, M18,M30 JULY M.7.7. –M.7.9.Summer schools results AUTH M7, M19,M31 Summer School: VHDL language and ISE Xilinx CAD July 1 – Workshop DAY: July ? IAPP Open day: inside the “Department congressino” FTK communicates to students April

OUTREACH SCHEDULE

Calliope from AUTH Andreas from PRIELE Marco from UNIPI Simone from UNIPI The FTK group at the IAPP Poster during the “UNIPI congressino” Federico from UNIPI & the students FIRST OUTREACH ACTIVITY: April IAPP day Open LAB – posters on FPGA-based Supercomputer – ATLAS

Workshop Day July Seminars to students for: – Trigger in HEP – FPGA applications outside HEP LHC e l’ago nel pagliaio

Su Nastro DETECTOR 40 TB/s 1/10 9 interazioni 2 “Divine Commedie” ogni 25 nsec FTK 25 us b e b b b  e   hb b  Potente come un centro di calcolo ma occupa lo spazio di un computer p p H → Z 0 Z 0 → 4  Dov’e` il bosone di Higgs ? 10  s per rispondere

 Gli esperimenti. La nuova particella: Higgs SM ? Kostas Kordas (Aristotle University of Thessaloniki)  Il problema del Trigger Kostas Kordas (Aristotle University of Thessaloniki)  Memoria Associativa (AM) per vedere l’Higgs in 10  s Mauro Dell’Orso (Universita` di Pisa)  Logica programmabile (FPGAs) per calcolo intensivo: un esempio per ricostruzione di immagini Calliope- Louisa Sotiropoulou (Aristotle University of Thessaloniki) Tutto questo spiegato con parole semplici e comprensibili

SUMMER SCHOOL Lessons and exercises immediately after To complete a project (see figure) and simulate it Lab section the last day See the school web site for details: Teacher: Calliope-Louisa seconded from AUTH to Pisa Teacher assistants: Marco Piendibene to be seconded to Priele Daniel Magalotti (INFN-PG) : interested to recruitment Between Students: Kostas Kordas seconded from AUTH to Pisa Dimitrios Dimas seconded from Priele to Pisa Guido Volpi (CERN): interested to recruitment Other students: Jafar Shojaii (Uni. Milan), Cinzia Decesare (Uni. Milan), + altro Milan, Takashi Kubota (Uni. Melbourne), Mariano Falcitelli (CNR Pisa), Emanuele Raffaele (studente ingegneria, S. Anna Pisa), + altra ragazza Uni Pisa (chi e’?)

The School: Great success For lunch all together At the end: a document for each one The teaching team

Del. no.Deliverable Title Nature Dissemination level Delivery date D.2.1. VS infrastructure at CAEN for FTK demonstrator integration R RE M6 D.4.1. FTK Demonstrator detailed simulation R RE M9 D.4.2. Test Vectors for the FTK demonstrator R RE M10 D.2.2. FTK demonstrator fully integrated with old power supply Pub PU M12 D.1.1. SLP2 prototype constructed at PRIELE Pub PU M12 D.6.1 Test bench R RE M12 D.7.1. IAPP project open days R PU M7, M19, M31, M43 D.7.2. Workshop days R PU M5, M17,M29, M41 D.7.3. Summer school weeks R PU M6, M18,M30, M42 D.7.4 D.8.3 World wide web site for dissemination R PU M6, M18, M30, M48 what to report? D.8.1. FTK Workshops R RE M1, M13, M30, M46 D.8.2. Trainings (next is CAEN)R RE M1, M5, M9,M19, M29, M47 Let’s do it in July! DELIVERABLE SUMMARY ASK PO about Deliverables classified ad Report.

CONCLUSIONS TIME IS RUNNING FAST A LOT OF REPORTS TO PREPARE (HOPEFULLY) OUTREACH AND TRAININGS high rate HOWEVER WE HAVE IN HANDS THE EXPECTED RESULTS!