1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.

Slides:



Advertisements
Similar presentations
1 Electricity Markets and Policy Group Energy Analysis Department Exploration of Resource and Transmission Expansion Decisions in the Western Renewable.
Advertisements

SWG Resource Team Call May 21, Convert BA load assumptions to applicable states/provinces 2.Derive the RPS renewable energy requirements for.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Hawaii: 2020 Presented by Alex Waegel for Team Cake B.
Renewable Resources Development Report California Energy Commission Business Meeting November 19, 2003 Ann Peterson Project Manager Technology Systems.
October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Capacity Valuation.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
The Green Rush Implementing Renewables in California Dave Ashuckian, P.E. Deputy Director Division Of Ratepayer Advocates Power Association of Northern.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Renewable Net Short.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
TRANSMISSION COSTS. Summary  The availability and cost of transmission are primary components in the Net Market Value (NMV) calculation used to rank.
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Renewable Energy Cost Trends Levelized cents/kWh in constant $ Wind PV COE cents/kWh
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
SM SOUTHERN CALIFORNIA EDISON® Page 1 Discussion on CEC’s and SCE’s Forecast Differences Presentation at CEC Preliminary Demand Forecast Workshop July.
RPS Model Methodology Arne Olson, Partner Doug Allen, Consultant.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
1 Introduction, scope, context Terminology, high-level approach Methodology, Inputs, Assumptions –Portfolio development –Discounted core –Environmental.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
1 Energy Division Workshops: LTPP Planning Standards (Part 1) & Procurement Rulebook June 11, 2010 Workshop R , Tracks 1, 2, & 3.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Integrating Land Conservation and Renewable Energy Goals in California: A Study of Costs and Impacts Using the Optimal Renewable Energy Build-Out (ORB)
2010 Long-Term Procurement Plan 33% RPS Calculator Training California Public Utilities Commission January 7, 2011.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
1 Modeling Distributed Generation Adoption using Electric Rate Feedback Loops USAEE Austin, TX – November 2012 Mark Chew, Matt Heling, Colin Kerrigan,
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 12/17/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
RETI Workshop March 16, 2015 Arne Olson, Partner Lakshmi Alagappan, Sr. Managing Consultant Identifying High Value Renewable Resources.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016 Brian Horii, Senior Partner Snuller Price, Senior Partner Zach Ming, Consultant Kiran Chawla,
Pennsylvania Electric Supply GHG Forecast 1 Victoria Clark Stockholm Environment Institute - US Center 5/29/09.
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection.
Communities Renewable Energy Study
LNBA Subgroup: Avoided Transmission Value
DG Projections in the Western Interconnection
Results of Smart Charging Research
GDP and Population up – Emissions Down
Presentation transcript:

1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios

What is the RPS Calculator? An Excel-based forecasting and planning tool Forecasts plausible types, general locations, and amounts of renewable resources that will be procured to meet RPS goals Resource/Tx Selection Meet Yearly RPS Goal Select Using Value Dynamic Valuation Based on Portfolio Future Porfolio of Resources Type General Location Capacity & Energy Cost MODEL LOGICOUTPUT Load Forecast Existing Resources INPUTS Resource Cost & Potential Tx Capability & Costs 2

RPS Calculator Outputs Used as Inputs in Variety of Planning Processes Examples: RPS Calculator Portfolios LTTP: Procurement Planning CAISO TPP: Transmission Planning CARB/CEC: GHG Planning WECC: Transmission Planning IOUs: Bid Evaluation * *RPS Calc outputs inform TPP and TPP outputs are used by IOUs in their own modeling work 3

Dynamic Valuation is a Key Feature of RPS Calculator 6.0+ Cost & value of renewable generation changes over time due to: – Technological innovation – Financing and tax policies – Portfolio saturation effects – Avoided costs of energy & capacity Unlike prior versions of the RPS Calculator, v.6.0+ considers how each of these factors will impact the supply curve of renewables over time 4 Charts are generic and are shown for illustrative purposes 0%10%20%30%40%50% RPS Penetration (%) Capacity Value 0%10%20%30%40%50% RPS Penetration (%) Energy Value 0%10%20%30%40%50% RPS Penetration (%) Curtailment Cost

CPUC Energy Division Recently Released Draft 2016 RPS Portfolios for LTPP/TPP Six portfolios were specified in “Assumptions and Scenarios” Document issued in CPUC’s draft Long Term Procurement Plan Proceeding Additional portfolios were studied as “sensitivities” to provide transparency on how different assumptions influence portfolio outcomes Background information available on RPS Calculator home page under “2016 RPS Portfolios” 5

Sensitivity Analysis: Case Descriptions Land Use: – “Environmental Baseline” assumption in RPS Calculator reflects no new generation land classified as RETI Category 1 or Category 2 – “DRECP/SJVP” assumption reflects increased procurement in specific areas (DFAs in DRECP, least-conflict in SJVP) In-State Wind: – Forces in 1,300 MW of highest-quality in-state wind Geothermal: – Reduces geothermal cost assumption and forces in 1,700 MW of geothermal resources High BEV: – Increases load and shifts load shape to account for charging (consistent with PATHWAYS project) Exports: – Allows 5,000 MW of energy to exported out of CAISO 6

Quantifying Sensitivity Impacts All portfolios were developed for the year 2030 (including default) ‒More divergence between portfolios occurs by 2030 than by 2026 ‒Allows clearer examination of difference between sensitivity and default Impact on each of five key portfolio metrics was calculated Total new generic generation (MW) Total transmission network upgrades (DNU) (MW) PV Ratio (PVR) (PV GWh as % of total renewable GWh)* Curtailment (% of RPS generation) Revenue Requirement ($) Average Rate (¢/kWh) 7 *PV GWh = RPS-eligible PV energy + behind the meter (BTM) PV energy; total renewable energy (RN) = all RPS-eligible energy + BTM rooftop PV energy

2016 RPS Portfolio Sensitivities Comparison (Total Generation in Year 2030) 8

2016 RPS Portfolio Sensitivities Results (Year 2030) Sensitivity Total Generic Buildout (MW) Total DNU (MW) PV Ratio (PV GWh/ RN GWh) Curtailmt (% RPS energy) Rev Reqmt ($MM) Avg Rate (¢/kWh) Default 5,4953, %37, Env Baseline 5,6894, %37, DRECP/SJVP 5,5804, %37, In-State Wind 4,3481, %37,469 * 30.6 * Geotherm. 2 2,7857, %37,632 *† 30.7 *† High BEV 6,9524, %37, Exports 3,5211, %37, Storage 4,1512, %38, *costs are not comparable with other portfolios because of forced-in resources †without assuming lower geothermal capital costs, rev. req. is $37,632 MM, avg. rate is 30.9¢/kWh 9

Conclusions from Individual Sensitivities Land Use: – More restrictive land use assumptions may increase curtailment by eliminating high quality in-state wind In-State Wind: – In-state wind connecting as energy-only resources may reduce overall portfolio costs if prioritized for available transmission capacity Geothermal: – Assuming a significantly lower geothermal costs, including in the Salton Sea area, reduces the amount of PV on the system by 2026 Electric Vehicles: – Battery electric vehicle adoption tends to increase solar PV selection and reduce curtailment Exports: – Exports can greatly reduce solar PV curtailment Storage: – Storage can greatly reduce solar PV curtailment, but at a higher cost than exports 10

Summary of Assumptions that Have Large Influence Within Tested Ranges 11 Sensitivity Total Generic Buildout (MW) Total DNU (MW) PV Ratio (PV GWh/ RN GWh) Curtailmt (% RPS energy) Rev Reqmt ($MM) Avg Rate (¢/kWh) Load BTM PV Energy-Only OOS Wind In-State Wind ---- Geothermal Env Baseline ++++ DRECP/SJVP +++ BEV Vehicles Exports Storage

Over Time, Declining Capacity Value and Increasing Curtailment Favor Wind 12