PANDA Forward Spectrometer Calorimeter (Shashlyk) Status Dmitry Morozov, IHEP (Protvino) PANDA LV Collaboration Meeting Nov 30 – Dec 4 2015 Vienna, Austria.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

NLC – The Next Linear Collider Project Colorado Univ. - Boulder Calorimetry-Arlington Calorimetry Detector Study Plans at Colorado Uriel Nauenberg for.
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Status of CLAS12 PCAL project
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Shashlik type calorimeter for SHIP experiment
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
Photo-detector and scintillator studies at ITEP Outline 1. Check of casting form 2. Study of MRS APD’s from CPTA 3. MC simulation of light collection in.
PANDA electromagnetic calorimeters Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group INSTR08 28 Feb - 05 Mar 2008.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
PHOBOS TOF Construction Status
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
Моделирование электромагнитного форм-фактора протона во времени-подобной области в среде PandaRoot Д. Морозов ИФВЭ (Протвино)
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
The Electromagnetic Calorimeter – 2005 Operation J. Sowinski for the Collaboration and the Builders Indiana Univ. Michigan State Univ. ANL MIT BNL Penn.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
Gain stability and the LYSO beam radiation monitor measurements
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Status and R&D development of Photon Calorimeter G. Atoian, S. Dhawan, V. Issakov, A. Poblaguev, M. Zeller, Physics Department, Yale University, New Haven,
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
TDR for the PANDA Forward Spectrometer Calorimeter (Shashlyk) Pavel Semenov IHEP, Protvino PANDA Collaboration Meeting, Giessen 20 March 2015.
Status of the PANDA Forward Spectrometer Calorimeter (Shashlyk) Pavel Semenov IHEP, Protvino PANDA-Russia Workshop FRRC, Moscow 27 May 2015.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
FTOF Status Anton A. Izotov, Frascati
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
 13 Readout Electronics A First Look 28-Jan-2004.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
COMPASS calorimeters S. Platchkov IRFU, CEA-Saclay GDR, 8-9 avril 2008
An update on ECAL simulations
Activities and Results from PNPI GATCHINA
The Electromagnetic Calorimetry of the PANDA Detector at FAIR
FSC status and plans Pavel Semenov IHEP, Protvino
NRC Kurchatov Institute, ITEP I. Korolko, M.Prokudin, Yu.Zaitsev
IHEP group Shashlyk activity towards TDR
A First Look J. Pilcher 12-Mar-2004
Preparation of the CLAS12 First Experiment Status and Time-Line
PANDA Forward Spectrometer Calorimeter (Shashlyk) status and plans
Presentation transcript:

PANDA Forward Spectrometer Calorimeter (Shashlyk) Status Dmitry Morozov, IHEP (Protvino) PANDA LV Collaboration Meeting Nov 30 – Dec Vienna, Austria

LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 2 Outline FSC Overview TDR status Readout electronics Software Contract preparation status Production and performance of prototypes Test stand facility at IHEP using cosmics Schedule Resources Conclusions

FSC Overview LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 3 Sizes are determined by a position at ~8 meters from the IP, opening in the Forward EMC Endcap (covers ~0.7% of solid angle) Depth by the space between Forward TOF and forward Muon Range system

FSC Requirements PropertyValue Energy resolution (σE/E)(2-3)%/√E(GeV) Photons energy threshold (E thresh )10 MeV (20 MeV tolerable) Single cell energy threshold (E 1 )3 MeV Noise, energy equivalent (σ Enoise )1 MeV Angular coverage0 0 – 5 0 Energy range10 MeV – 15 GeV Spatial resolution3.5 mm Load per cell1 MHz* Radiation hardness, maximum integrated doze 10 kGy* LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 4 * Based on luminosity 2x10 32 cm -1 s -1

FSC Design Sizes: ~3.6 m x 2.2 m Active zone: 3 m x 1.5 m (27x14 modules, 54x28 cells, 1476 channels) Beam pipe zone: 3x3 modules LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) layers of 0.3 mm lead and 1.5 mm scintillator, total length 680 mm Transverse size 55x55 mm 2 Light collection: 36 fibers Y11 (BCF91A),  1.0 mm PMT as a photodetector Quartz optical fiber for each cell for a precise PMT gain monitoring LED for each module as a light monitoring system

TDR Status Presented to Collaboration: March 2015 Discussion inside Collaboration: March – June 2015 Submitted to FAIR Expert Committee Experiments: June 2015 No questions/comments have been received from ECE up to now LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 6

Readout Electronics Similar to the target EMC readout the FSC readout chain contains digitizer, data concentrator and the Compute Node Digitizer processes data from the SADC (base line calculation, hit detection, feature extraction, pule up detection) SADC design is under development by Uppsala group 14 bit ADC, cover wide range from 3 MeV to 12 GeV signals: single range is enough to cover the whole energy range – proved “at the table”, still needs to be double checked at the test beam We prepare the test setup with shashlyk prototype and 16-channel SADC prototype from Pawel Marcinievsky Data concentrator collects data from several digitizers, pre-process data and provides connection to the PANDA time distribution system LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 7

Software New FSC geometry since PandaRoot revision Fixed many illegal geometry overlaps inside FSC volumes itself and with the beam pipe Checked with different versions of beampipe (201308, ) PID Bayesian algorithm The probability map (variations of p, E/p, Lateral moment, Z moments for 10 particle species) histograms BayesEMC.root was calculated by Ronald Kunne with rev (Jan 2012) at kinematical region: 0.2 GeV/c < p < 10 GeV/c, 5 0 < θ < We simulated and analyzed 10 7 events with extended region to cover FSC 0.1 GeV/c < p < 10 GeV/c, 0 0 < θ <  Revison used New BayesEMC.root is ready and can be incorporated to PandaRoot (after the final check by Ronald) Time Based simulation Pile-Up simulations (Modified waveforms) → planned (beg. of 2016) Reco using time information → planned (beg of 2016) Update geometry with passive elements → planned for 2016 LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 8

Contract preparation status TDR submitted to ECE on June 17, 2015 Pavel Semenov is preparing the Technical Specifications No problems since all the technologies are at hands at IHEP (Protvino) We expect positive decision of ECE in July 2016 After decision: Iterative process to reconcile the Technical Specs between TC and IHEP Discussion of the schedule of the production readiness prototype study and mass production modules delivery IHEP group has experience with FAIR contracts (EMC mechanical structure contract) The goal – to have the Contract ready to be signed by the fall of 2016 LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 9

Production of prototypes Type-1 KOPIO mold was used to produce 110x110 mm 2 tiles, Bicron BCF91A fibers, Tyvek wrapping around the module, four fixing pins per tile (correct spacing between plastic surface and lead for the full internal reflection), no Tyvek between scintillator and lead, fiber loop radius is 28 mm Type-2 KOPIO size tiles were milled in four quadratic parts (55x55mm 2 ), Bicron BCF91A fibers, 1 fixing pin per tile (incorrect spacing between plastic surface and lead), painted side faces of the tile, no Tyvek between scintillator and lead, fiber loop radius is 14 mm Type-3 55x55 mm 2 scintillator tiles were produced with new mold, Kuraray Y11 fibers, four fixing pins per tile, painted side faces of the tile, sheets of Tyvek between scintillator and lead, fiber loop radius is ~14 mm Type-4 55x55 mm 2 - same as Type-3 but NO Tyvek between scintillator and lead. Produced recently LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 10

Prototypes Performance Original KOPIO design (Type-1) – no reflector, only full internal reflection, showed good performance Prototype without reflector, made for PANDA, (Type-2) had a non- uniformity of light collection up to +/- 15% because of missing pins, keeping space between lead and tiles. For the same reason it might have reduced light output. PANDA prototype with Tyvek between lead and tiles as a reflector (Type-3) showed good light collection and increased light output. It is selected as base design in the TDR. To clarify the light output increase for the Type-3 prototype and study the performance of the module with enough pins but without a reflector a new set of modules was produced at IHEP. 6x6 array is ready to be tested. Tests by cosmic rays are being performed now Collaboration recommended to perform test beam. Where? Mainz? When? Light output for Type-4 Proto ADC dynamic coverage LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 11

Shashlyk cosmics test setup The complete readout chain in triggerless mode Signal sampling by one SIS3316 ‐ 250 ‐ 14 ADC utilizing developed feature extraction algorithm Study long-term stability and longitudinal homogeneity Time resolution measurements Quality control for production (24 modules at once – requires 3 ADCs and 48 PMTs) Tests of Cockroft-Walton HV control system Verification of the monitoring system LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 12 New shorter HV bases

Test stand online data Online GUI Baseline, Amplitude and Timestamp info extracted The data with cosmic muons is being collected now LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 13

Schedule Oct Dec 2019 – 3.5 years Collaboration contract of IHEP with FAIR on the FSC by using the Russian contributed money into FAIR; Oct 2016 – Apr 2017 – build and test production readiness prototype Apr Dec manufacture parts and assemble all modules; Oct Dec manufacture all the mechanical support parts in Russia; Dec purchase the photomultipliers and ship them directly from the manufacturer to Juelich, Germany; purchase the readout electronics (Uppsala University) and ship it to Juelich; Dec Feb shipping the modules to Germany; Dec Apr shipping mechanical support to Germany; Mar Aug pre-assembly and on-site tests of the FSC modules at Juelich; 2019 move the whole assembled and tested FSC from Juelich to the PANDA experimental hall at FAIR, install the FSC in the PANDA experimental hall LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 14

Resources Resources at IHEP: 28 people in total 17 FTE 14 experts from the IHEP PANDA (0.3 to 1 FTE), 2 full-time designers, 2 full-time engineers 5 FTE technicians from the IHEP Scintillator Department. 5 technicians from the IHEP Mechanical Workshop will be part-time involved SADC development will be done at Uppsala by Pawel Marcinievsky Our cost estimate has shown that we can provide all the workpackages (except ADC) for Euro (Costs in 2005) as it is fixed in PANDA CostBook Money profile: 2016 – 35% (Most of the materials should be purchased) 2017 – 35% 2018 – 20% 2019 – 10% LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 15

LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 16 Conclusions Expecting positive ECE decision in July 2016 Technical Specification preparation for the Contract is in progress The goal is to sign a contract at October 2016 Software is being developed New prototype is produced at IHEP Beam test needed at Mainz(?) To prove the coverage of ADC dynamic range To clarify the light output increase checking the difference between “Tyvek” and “No Tyvek” modules Cosmic test stand is assembled at IHEP (close to production facility) Production quality assurance Various tests 28 people at IHEP (17 FTE) + Uppsala group (SADC dev) Euro (2005 CostBook prices) +SADC costs 2019 – ready for commissioning at PANDA Cave

LV PCM - Vienna, Nov 30 - Dec 4 Dmitry Morozov (IHEP, Protvino) 17 Thank you!