56 Resources u Icons represent resources u Dynamic resources must be assigned a path network u Resources position at nodes, not locations u “Specs” field.

Slides:



Advertisements
Similar presentations
MS-Access XP Lesson 1. Introduction to MS-Access Database Management System Software (DBMS) Store data in databases Database is a collection of table.
Advertisements

Benchmark Series Microsoft Access 2010 Level 1
Intro to Arena A Third Simulation. Model 3 We add more features to Model 2, also from Ch. 5 of Simulation with Arena. The justification for adding features.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
* Requisition Processing Common Problems * Budget Checking Errors * Run Controls * Process Scheduler Request & Process Monitor * Questions.
104 Phase 1 Model Features: u Imported background u Scale the drawing u Multiple resources u Multiple Routes u Entity Name and Graphic Change u Service.
UNESCO ICTLIP Module 4. Lesson 3 Database Design, and Information Storage and Retrieval Lesson 3. Information storage and retrieval using WinISIS.
Guide to Oracle10G1 Introduction To Forms Builder Chapter 5.
CS320n –Visual Programming LabVIEW Foundations. Visual ProgrammingLabVIEW Foundations2 What We Will Do Today Hand back and review the midterm Look at.
1 of 4 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Automating Tasks With Macros
The IDE (Integrated Development Environment) provides a DEBUGGER for locating and correcting errors in program logic (logic errors not syntax errors) The.
ServiceModel Demonstration A Small Office. 2 Create a New Model 1.Select File | New 2.In the 'General Information' dialog box, type a model name... in.
Automating Tasks With Macros. 2 Design a switchboard and dialog box for a graphical user interface Database developers interact directly with Access.
22 Building Simulation Models using ProModel. 23 Please Read Practice Model Shop Floor found on the next page.
CE-6 Discussion Tool Faculty Features. New Location – Always in “Course Tools” Column.
Textbook: Applied Simulation, modeling and Analysis using FlexSim
ExitTOC Run & Route Directions 2003 Editing Run and Route Directions Edulog.nt v9.2 Use the buttons to navigate the training package First PagePreviousNextLast.
Touch Screen Time Clock With Great Plains Manufacturing.
EProcurement Job Aid Requisitions & Receipts. Table of Contents Creating a Requisition Define Requisition Vendor.
Outlook 2007 Managing Your Time. Course contents  It’s all about choices  Get it right in the calendar  Finishing touches.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Outlook Project 2 Scheduling Management and Instant Messaging Using Outlook.
Education Google Calendar (GCal) English. Education Upon completion of this course, you will be able to:  Navigate the GCal interface  Search your calendar.
Microsoft Office Word 2013 Expert Microsoft Office Word 2013 Expert Courseware # 3251 Lesson 4: Working with Forms.
COMPREHENSIVE Excel Tutorial 8 Developing an Excel Application.
Chapter 9 Macros, Navigation Forms, PivotTables, and PivotCharts
Chapter 9 Introduction to ActionScript 3.0. Chapter 9 Lessons 1.Understand ActionScript Work with instances of movie clip symbols 3.Use code snippets.
Tutorial 6 Using Form Tools and Creating Custom Forms
NextGen Trustee Department Disbursements This class will cover the various methods of handling department disbursements. Whether entering them manually.
Introduction to the WebBoard Terry Dennis. The WebBoard - Our Connection The WebBoard URL is
Using Form Tools and Creating Custom Forms Microsoft Access 2010.
Creating a Web Site to Gather Data and Conduct Research.
Sequences and Conveyors By Dr. Jason Merrick. Simulation with Arena — Further Statistical Issues C11/2 Sequences Open the Arena File “BankNoSequences.doe”
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Automating Database Processing Chapter 6. Chapter Introduction Design and implement user-friendly menu – Called navigation form Macros – Automate repetitive.
Copyright 1997 PROMODEL Corporation UNIT TWO: SOFTWARE BASICS.
Promodel tutorial tutorial.
Management Information Systems MS Access MS Access is an application software that facilitates us to create Database Management Systems (DBMS)
Screen ViewModule Title: Notes: Branching Instructions: Audio Script: Page: Use Microsoft Outlook 1 Create a Distribution List A distribution list is a.
Productivity Programs Common Features and Commands.
1 Command Field: Use this field to go to transactions directly by entering the transaction code. The transaction codes can be found either in the SAP Easy.
Automating Database Processing
® Microsoft Office 2010 Access Tutorial 3 Maintaining and Querying a Database.
Key Applications Module Lesson 21 — Access Essentials
 Whether using paper forms or forms on the web, forms are used for gathering information. User enter information into designated areas, or fields. Forms.
MS Access 2007 Management Information Systems 1. Overview 2  What is MS Access?  Access Terminology  Access Window  Database Window  Create New Database.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
Visual Basic.NET Comprehensive Concepts and Techniques Chapter 8 Debugging, Creating Executable Files, and Distributing a Windows Application.
XP New Perspectives on Microsoft Office FrontPage 2003 Tutorial 7 1 Microsoft Office FrontPage 2003 Tutorial 7 – Creating and Using Templates in a Web.
Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.
Arena Simulation Language. Simulation with ArenaChapter 3 – A Guided Tour Through ArenaSlide 2 of 58 The Create Flowchart Module “Birth” node for entities.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Davisware GlobalEdge 2008 Payroll Main Menu Time Entry and Payroll Processing.
ExitTOC TIMSNT Introduction 2003-Part 3 1 Introduction to TIMSNT-Part 3 Part 3: Menu Items Runs, Driver Directions, Stops, Routes and Options Use the buttons.
HEI/OCAN College Access Program Data Submissions.
Templates. Several options available when using Templates.
Copyright © 2007 by Pearson Education 1 UNIT 6A COMBINATIONAL CIRCUIT DESIGN WITH VHDL by Gregory L. Moss Click hyperlink below to select: Tutorial for.
NextGen Trustee GL/Accounting This class will cover NextGen Financial Management for Trustee Offices. We will look at GL accounts, Transactions, Bank Reconciliation,
New Task Properties UI Change most tabs to Property/Value grids Provide option to dock Task Properties on the side (vertical layout) or on the bottom (horizontal.
Excel Tutorial 8 Developing an Excel Application
11 Scheduling.
Mail Merge And Macros in MS WORD
Building Configurable Forms
AIS Edge November 19, 2007.
Lesson Four: Building Custom Patient Lists
NextGen Purchasing Calendar Year End 1099 Process
NextGen Trustee General Ledger Accounting
Promodel tutorial tutorial ITSS - Modelos de simulación.
Two methods to observe tutorial
Approving Time in Kronos Manager/Supervisor Reference Guide
Presentation transcript:

56 Resources u Icons represent resources u Dynamic resources must be assigned a path network u Resources position at nodes, not locations u “Specs” field defines path, nodes, motion and rules

57 Resource edit table Resource selection Resources

58 Resource Specifications assign the path network, motion, node and rules information Resource Specifications assign the path network, motion, node and rules information

59 Resource Points let the resource occupy a position away from the node Resource Points let the resource occupy a position away from the node

60 Now, along with the instructor, enter the two Resources for the “Shop Floor” model Transporter Operator Resources

61 Processing What Am I ? Where Am I ? What Happens ? Now What Am I ? Where Do I Go ? Under What Circumstances ? How Do I Get There ?

62 Processing u Defines what entity at what location has what happening to it. u Select entity to be addressed in the Tools window. u Click on the initial entry location, then the first destination. Do remaining locations the same way. u Address individual Operation Logic and Move Logic entries as required

63 Select “Entity” to begin process definition Select “Entity” to begin process definition

64 1. Click on “Part_Storage” icon to begin process definition 1. Click on “Part_Storage” icon to begin process definition 2. Move arrow to first destination and click to record initial movement 2. Move arrow to first destination and click to record initial movement

65 Entity Output Change u If an Entity changes form its Output name may change u Select the new entity name from the pull down window in the output field

66 Raw_Part enters the Lathe Raw_Part enters the Lathe Finish_Part leaves the Lathe Finish_Part leaves the Lathe

67 Routing Rules Establish the condition for selecting the next location u FIRST Available - Go to the first listed location with available capacity u Quantity Field - Shows the number of entities that will go to the destination

68 Select the desired Routing Rule This is the Quantity indicator This is the Quantity indicator

69 Output Quantity u Create an Output Quantity of X in the quantity field of the routing dialogue box

70 Operation Logic u Operation Logic describes what happens to an entity at its current location u Operation Logic uses a series of statements or code to cause ProModel to do what you want u The Logic Builder can help you write these statements correctly

71 Operation Statements Cause an entity to do some action or activity u WAIT or ^ or TIME Causes an entity to wait at a location for a specified time Syntax:WAIT

72 Operation Statements u GET Causes an entity to request the use of a resource Syntax:GET u FREE Causes an entity to release a previously captured resource Syntax:FREE

73 Operation Statements u USE Causes an entity to request a resource for a specified time and then release the resource Syntax:USE for u Usual Syntax of Get/Free Statements Get Operator Wait N(5,2) Free Operator

74 Operation Statements u ACCUM Accumulates, without consolidating, a specified quantity of entities at a location Syntax:ACCUM u GRAPHIC Causes an entity to change to a different graphic Syntax:GRAPHIC

75 Logic Builder u A way to enter logic or the names of defined items u Works from any field that accepts logic or expressions u An easy way to ensure the syntax is correct

76 Use the “Logic Builder” to create process logic or when you are unsure of the syntax. Use the “Logic Builder” to create process logic or when you are unsure of the syntax.

77 Gives a short explanation Buttons change with selected statement Buttons change with selected statement Other options are

78 1. Select a statement such as WAIT 1. Select a statement such as WAIT 2. Click on Time, Keypad or Build Expression or enter a time 2. Click on Time, Keypad or Build Expression or enter a time

79 When the expression or logic is completely built, click on Paste to place the logic in the window from which the Logic Builder was selected. Then you may Close the Logic Builder or keep it open for the next statement. When the expression or logic is completely built, click on Paste to place the logic in the window from which the Logic Builder was selected. Then you may Close the Logic Builder or keep it open for the next statement.

80 Move Logic u Activated from the Routing - Move Logic field u Specifies Path Network, Time or Resource to make the move u May apply logic before and after the actual move

81 Click on Move Logic to bring up the window Click on Move Logic to bring up the window Click on Build button or use right mouse button to bring up the Logic Builder window Click on Build button or use right mouse button to bring up the Logic Builder window

82 Basic category brings up standard Move statements Basic category brings up standard Move statements

83 Select the Resource with which the Entity is to move Select the Resource with which the Entity is to move Choose Paste and then Close when finished Choose Paste and then Close when finished

84 Arrivals u Select the entity to arrive from the Tools window u Click on the Arrival location u Edit Quantity Each, First Time, Occurrences and Frequency as appropriate

85 Arrivals u First Time may have an entry or be left blank u INFinite may be used in Occurrences to create an unending stream of arrivals u Frequency may be a constant, a macro, a variable or a distribution

86 1. Select “Entity” to arrive 2. Select “arrival” location

87 The First Time button brings up scheduling options The First Time button brings up scheduling options

88 Now, along with the instructor, enter the arrival pattern for the “Shop Floor” model Arrivals

89 Five Common Errors 1. No process defined at a destination 2. Missing a path network interface 3. Path network nodes not connected 4. Failure to release a resource 5. Failed arrivals due to insufficient capacity

90 No Process Defined This is the error message

91 Missing Interface This is the run time error message for a resource This is the run time error message for a resource

92 Two Unconnected Nodes N4 This is the run time error message This is the run time error message This is the break in the path This is the break in the path N3

93 Entity Exits with a Resource Job_Complete trying to Exit with Order_Tech Job_Complete trying to Exit with Order_Tech

94 Failed Arrivals This is the error message, seen at the end of the simulation run

95 Running the Simulation 1. Select Simulation Options first. a. Check the Output Path. b. Check run time options and clock precision. c. Select Output Reporting option. 2. Then select Run or Save and Run.

96 Select “options” before running the simulation to set values Select “options” before running the simulation to set values

97 Define run length by calendar date or weekly time for shift use Define run length by calendar date or weekly time for shift use... or define run length by hours... or leave blank... or define run length by hours... or leave blank Set the number of replications Set the number of replications

98 Select “Information” during run time to view in-process model status Select “Information” during run time to view in-process model status

99 Right Click Features 1. Layout widow - no edit table open a. Right click on a location lets you edit the location or the background b. Similarly, right click on resource, variable, etc. does the same thing c. Right click on the background lets you edit the background or most of the View menu options

100 Right Click Features 2. Layout window - edit table open a. Takes you to that record in the edit table b. Lets you delete the graphic or that particular record c. In Path Networks lets you add a joint or delete the segment d. In Processing lets you add a joint to the routing arrow, delete that routing or delete the entire process

101 Right click on the Transporter to bring up this edit option Right click on the Transporter to bring up this edit option

102 Right click on the background brings up these options Right click on the background brings up these options

103 Right click on a path segment takes you to the segment and gives you edit options Right click on a path segment takes you to the segment and gives you edit options