EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 Victor Alessandrini IDRIS - CNRS DEISA : status, strategies, perspectives.

Slides:



Advertisements
Similar presentations
Forschungszentrum Jülich in der Helmholtz-Gesellschaft December 2006 A European Grid Middleware Achim Streit
Advertisements

Inetrconnection of CNGrid and European Grid Infrastructure Depei Qian Beihang University Feb. 20, 2006.
Jorge Gasós Grid Technologies Unit European Commission The EU e Infrastructures Programme Workshop, Beijing, June 2005.
Current status of grids: the need for standards Mike Mineter TOE-NeSC, Edinburgh.
Ingrid Conferene, Ischia, April Stefan Heinzel, DEISA DEISA Towards a European HPC Infrastructure ( Topics Vision The DEISA/eDEISA.
1 Ideas About the Future of HPC in Europe “The views expressed in this presentation are those of the author and do not necessarily reflect the views of.
High-Performance Computing
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
Towards a Virtual European Supercomputing Infrastructure Vision & issues Sanzio Bassini
Towards a European Training Network in Scientific Computing Pekka Manninen, PhD CSC – IT Center for Science Ltd.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Infrastructure overview Arnold Meijster &
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
Silicon Graphics, Inc. Poster Presented by: SGI Proprietary Technologies for Breakthrough Research Rosario Caltabiano North East Higher Education & Research.
Problem-Solving Environments: The Next Level in Software Integration David W. Walker Cardiff University.
HPC-Europa2 Funding research visits in Europe
Amsterdam, 28 June 2006DEISA UNICORE tutorial UNICORE and the DEISA supercomputing grid Jules Wolfrat
Lisbon, August A. Streit DEISA Forschungszentrum Jülich in der Helmholtz-Gesellschaft Achim Streit
INFSO-RI Enabling Grids for E-sciencE Introduction to GRID computing Introduction GRID Tutorial Jules Wolfrat SARA.
1 Ideas About the Future of HPC in Europe “The views expressed in this presentation are those of the author and do not necessarily reflect the views of.
CSC Grid Activities Arto Teräs HIP Research Seminar February 18th 2005.
INFSO-RI Enabling Grids for E-sciencE Large Scale Grid Infrastructures: Status and Future Erwin Laure EGEE Technical Director CERN,
Chapter 2 Computer Clusters Lecture 2.1 Overview.
EUROPEAN UNION Polish Infrastructure for Supporting Computational Science in the European Research Space Cracow Grid Workshop’10 Kraków, October 11-13,
Forschungszentrum Jülich in der Helmholtz-Gesellschaft Grid Computing at NIC September 2005 Achim Streit + Team
 Cloud computing  Workflow  Workflow lifecycle  Workflow design  Workflow tools : xcp, eucalyptus, open nebula.
Experiences with using UNICORE in Production Grid Infrastructures DEISA and D-Grid Michael Rambadt
IPlant Collaborative Tools and Services Workshop iPlant Collaborative Tools and Services Workshop Collaborating with iPlant.
Mateo Valero Director Barcelona Supercomputing Center - Centro Nacional de Supercomputación México, April, 14th 2005.
EuroCAMP, Malaga, October 19, 2006 DEISA requirements for federations and AA Jules Wolfrat SARA
1Forschungszentrum Jülich  11:00 – 11:20UNICORE – A European Grid Middleware (20 min) Achim Streit (FZJ)  11:20 – 11:30Demonstration of UNICORE in DEISA.
GGF16 Athens, February DEISA Perspectives Towards cooperative extreme computing in Europe Victor Alessandrini IDRIS - CNRS
RI User Management in DEISA The DEISA VO view Jules Wolfrat SARA, HPDC’08 workshop June 24, 2008.
The John von Neumann Institute for Computing (NIC): A survey of its computer facilities and its Europe-wide computational science activities Norbert Attig.
A short introduction to the Worldwide LHC Computing Grid Maarten Litmaath (CERN)
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
Contact person: Prof. M. Niezgódka Prof. Piotr Bała ICM Interdisciplinary Centre for Mathematical and Computational Modelling Warsaw University,
© 2006 Open Grid Forum Enabling Pervasive Grids The OGF GIN Effort Erwin Laure GIN-CG co-chair, EGEE Technical Director
DataTAG Research and Technological Development for a Transatlantic Grid Abstract Several major international Grid development projects are underway at.
RI User Support in DEISA/PRACE EEF meeting 2 November 2010, Geneva Jules Wolfrat/Axel Berg SARA.
Forschungszentrum Jülich in der Helmholtz-Gesellschaft Experiences with using UNICORE in Production Grid Infrastructures DEISA and D-Grid Michael Rambadt.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
Grid Middleware Tutorial / Grid Technologies IntroSlide 1 /14 Grid Technologies Intro Ivan Degtyarenko ivan.degtyarenko dog csc dot fi CSC – The Finnish.
1 European e-Infrastructure experiences gained and way ahead OGF 20 / EGEE User’s Forum 9 th May 2007 Mário Campolargo European Commission - DG INFSO Head.
RI The DEISA Sustainability Model Wolfgang Gentzsch DEISA-2 and OGF rzg.mpg.de.
Research Infrastructures Information Day Brussels, March 25, 2003 Victor Alessandrini IDRIS - CNRS.
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
Terena conference, June 2004, Rhodes, Greece Norbert Meyer The effective integration of scientific instruments in the Grid.
April 10, 2008, Garching Claudio Gheller CINECA The DEISA HPC Grid for Astrophysical Applications.
Identity Management in DEISA/PRACE Vincent RIBAILLIER, Federated Identity Workshop, CERN, June 9 th, 2011.
Development of e-Science Application Portal on GAP WeiLong Ueng Academia Sinica Grid Computing
Fourth EGEE Conference Pise, October 23-28, 2005 DEISA Perspectives Towards cooperative extreme computing in Europe Victor Alessandrini IDRIS - CNRS
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
14, Chicago, IL, 2005 Science Gateways to DEISA Motivation, user requirements, and prototype example Thomas Soddemann, RZG, Germany.
E-Infrastructure the FP7 prospects Mário Campolargo European Commission - DG INFSO Head of Unit Research Infrastructures TERENA Networking Conference 2006.
The Evolution of the Italian HPC Infrastructure Carlo Cavazzoni CINECA – Supercomputing Application & Innovation 31 Marzo 2015.
European Perspective on Distributed Computing Luis C. Busquets Pérez European Commission - DG CONNECT eInfrastructures 17 September 2013.
Drug Discovery Workshop, Catania 2009 Molecular dynamics of protein unfolding using the DEISA-Grid Andrew Emerson, CINECA Supercomputing Centre, Bologna,
Page : 1 SC2004 Pittsburgh, November 12, 2004 DEISA : integrating HPC infrastructures in Europe DEISA : integrating HPC infrastructures in Europe Victor.
Monterey HPDC Workshop Experiences with MC-GPFS in DEISA Andreas Schott
DutchGrid KNMI KUN Delft Leiden VU ASTRON WCW Utrecht Telin Amsterdam Many organizations in the Netherlands are very active in Grid usage and development,
1 MSWG, Amsterdam, December 15, 2005 DEISA security Jules Wolfrat SARA.
Grids and SMEs: Experience and Perspectives Emanouil Atanassov, Todor Gurov, and Aneta Karaivanova Institute for Parallel Processing, Bulgarian Academy.
A European Grid Technology Achim Streit Jülich Supercomputing Centre (JSC)
Scientific Data Processing Portal and Heterogeneous Computing Resources at NRC “Kurchatov Institute” V. Aulov, D. Drizhuk, A. Klimentov, R. Mashinistov,
Bob Jones EGEE Technical Director
DEISA : integrating HPC infrastructures in Europe Prof
Grid Portal Services IeSE (the Integrated e-Science Environment)
Presentation transcript:

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 Victor Alessandrini IDRIS - CNRS DEISA : status, strategies, perspectives Towards cooperative extreme computing in Europe Victor Alessandrini IDRIS - CNRS

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 2 DEISA objectives To enable Europe’s terascale science by the integration of Europe’s most powerful supercomputing systems. Enabling scientific discovery across a broad spectrum of science and technology is the only criterion for success. DEISA is an European Supercomputing Service built on top of existing national services. This service is based on the deployment and operation of a persistent, production quality, distributed supercomputing environment with continental scope. The integration of national facilities and services, together with innovative operational models, is expected to add substantial value to existing infrastructures. Main focus is High Performance Computing (HPC).

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 3 BSC Barcelona Supercomputing Centre Spain CINECA Consortio Interuniversitario per il Calcolo Automatico Italy CSC Finnish Information Technology Centre for Science Finland EPCC/HPCx University of Edinburgh and CCLRC UK ECMWF European Centre for Medium-Range Weather Forecast UK (int) FZJ Research Centre Juelich Germany HLRS High Performance Computing Centre Stuttgart Germany IDRIS Institut du Développement et des Ressources France en Informatique Scientifique - CNRS LRZ Leibniz Rechenzentrum Munich Germany RZG Rechenzentrum Garching of the Max Planck Society Germany SARA Dutch National High Performance Computing The Netherlands and Networking centre Participating Sites

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 4 The DEISA supercomputing environment ( processors and 145 Tf in 2006, more than 190 Tf in 2007) IBM AIX Super-cluster –FZJ-Julich, 1312 processors, 8,9 teraflops peak –RZG – Garching, 748 processors, 3,8 teraflops peak –IDRIS, 1024 processors, 6.7 teraflops peak –CINECA, 512 processors, 2,6 teraflops peak –CSC, 512 processors, 2,6 teraflops peak –ECMWF, 2 systems of 2276 processors each, 33 teraflops peak –HPCx, 1600 processors, 12 teraflops peak BSC, IBM PowerPC Linux system (MareNostrum) 4864 processeurs, 40 teraflops peak SARA, SGI ALTIX Linux system, 416 processors, 2,2 teraflops peak LRZ, Linux cluster (2.7 teraflops) moving to SGI ALTIX system (5120 processors and 33 teraflops peak in 2006, 70 teraflops peak in 2007) HLRS, NEC SX8 vector system, 646 processors, 12,7 teraflops peak. Systems interconnected with dedicated 1Gb/s network – currently upgrading to 10 Gb/s – provided by GEANT and NRENs

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 5 How is DEISA enhancing HPC services in Europe? Running larger parallel applications in individual sites, by a cooperative reorganization of the global computational workload on the whole infrastructure, or by the operation of the job migration service inside the AIX super-cluster. Enabling workflow applications with UNICORE (complex applications that are pipelined over several computing platforms) Enabling coupled multiphysics Grid applications (when it makes sense) Providing a global data management service whose primordial objectives are: –Integrating distributed data with distributed computing platforms –Enabling efficient, high performance access to remote datasets (with Global File Systems and stripped GridFTP). We believe that this service is critical for the operation of (possible) future European petascale systems –Integrating hierarchical storage management and databases in the supercomputing Grid. Deploying portals as a way to hide complex environments to new users communities, and to interoperate with another existing grid infrastructures.

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 6 The most basic DEISA services UNIfied access to COmputing REsources (UNICORE). Global access to all the computing resources for batch processing, including workflow applications (in production) Co-scheduling service. Needed to support grid applications with synchronous access to resources, as well as high performance data movement Global data management. Integrating distributed data with distributed computing platforms, including hierarchical storage management and databases. Major highlights are: –High performance remote I/O and data sharing with global file systems, using full network bandwidth (in production) –High performance transfers of large data sets, using full network bandwidth (ends 2006) GridFTP Co-scheduled, parallel data mover tasks

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 7 Basic services: workflow simulations using UNICORE UNICORE supports complex simulations that are pipelined over several heterogeneous platforms (workflows). UNICORE handles workflows as a unique job and transparently moves the output – input data along the pipeline. UNICORE clients that monitor the application can run in laptops. UNICORE has a user friendly graphical interface. DEISA has developed a command line interface for UNICORE. UNICORE infrastructure including all sites has full production status.

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 8 Linux SGI SARA (NL) LRZ (DE) DEISA Global File System integration in 2006 (based on IBM’s GPFS) CINECA (IT) FZJ (DE) ECMWF (UK) IDRIS (FR) AIX IBM domain RZG (DE) BSC (ES) LINUX Power-PC CSC (FI) HPC Common Global File System similar architectures / operation systems High bandwidth (10 Gbit/s) High Performance Common Global File System various architectures / operating systems High bandwidth (up to 10 Gbit/s)

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 9 Enabling science The DEISA Extreme Computing Initiative: identification, deployment and operation of a number of « flagship » applications in selected areas of science and technology. Applications are selected on the basis of scientific excellence, innovation potential and relevance criteria (the application must require the extended infrastructure services) European call for proposals: May-June every year (first one took place in 2005) Evaluation June -> September. We had in Extreme Computing Proposals 29 projects were retained for operation in Full information on DEISA Web server (

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 10 Extreme Computing proposals Bioinformatics 4 Biophysics 3 Astrophysics 11 Fluid Dynamics 6 Materials Sciences 11 Cosmology 3 Climate, Environment 5 Quantum Chemistry 5 Plasma Physics 2 QCD, Quantum computing 3 Profiles of applications in operation in 2005 – 2006 Huge parallel applications running in single remote nodes (dominant) Data Intensive applications of different kinds. Workflows (about 10%)

EGEE Workshop on Management of Rights in Production Grids Paris, June 19th, 2006 V. Alessandrini IDRIS-CNRS 11 Conclusions DEISA is reexamining its operational model to adapt to the expected evolution of HPC in Europe in the next few years. The big challenge is always enabling new, first class computational science. DEISA aims at deploying a persistent, basic European infrastructure for general purpose high performance computing. Our next challenge is establishing an efficient organization embracing all relevant HPC organizations in Europe. Interfaced with other grid-enabled complementary infrastructures, DEISA expects to contribute to a global European eInfrastructure for science and technology.