Flight Data Recorder (FDR) project status Master Student : Georgios Petropoulos Advisors : Joseph Timothy Foley Þorgeir Pálsson ITS Liason : Guðmundur.

Slides:



Advertisements
Similar presentations
Formatting Long Documents This resource will help you gain the skills to make a long document look good. Using these skills will save you lots of time.
Advertisements

Linking Program Review Data to Reports 1.Accessing & Using the Program Review Data Warehouse 2.Creating Hyperlinks in your Report 3.Exporting Colleague.
Lecture 6 Testing and Debugging on a Physical Android Device and other Power User Stuff.
Click on the Tools and Help button to bring up Tools and Help.
Teaching Room User Guide – Using the AV Pod, Projector and Screen If the touch panel is blank, press firmly to wake up. Start up the Pod To turn on the.
A Participant’s View of the Internet Assessment System (IAS)
Introducing the Canon Powershot 410 Digital Still Camera Click to advance to the next page.
Get android development environment running. Install – Get and install JDK 5 or 6 (see link in the.
1 Mobile Computing Mobile First (formerly Worklight) Copyright 2015 by Janson Industries.
Android: Hello World Frank Xu Gannon University. Steps Configuration ▫Android SDK ▫Android Development Tools (ADT)  Eclipse plug-in ▫Android SDK and.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
ANDROID PROGRAMMING MODULE 1 – GETTING STARTED
Setting up the Development Environment Copyright © SUPINFO. All rights reserved Preparation.
SET UP COMPUTER ** PLEASE BE AWARE SCREENSHOTS MAY NOT MATCH **
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Word Project 8 Working with Macros and Visual Basic for Applications (VBA)
SEEM4570: XAMPP, Eclipse, Summary of Html Kangfei Zhao Room 711,ERB
Tutorial: Configuring Your Microphone Duke University School of Nursing.
Lab 8 – C# Programming Adding two numbers CSCI 6303 – Principles of I.T. Dr. Abraham Fall 2012.
Wireless Mobility with Android 1 Presented by: Ung Yean MS. Computer Science American University, Washington DC, USA.
Back to content Final Presentation Mr. Phay Sok Thea, class “2B”, group 3, Networking Topic: Mail Client “Outlook Express” *At the end of the presentation.
1 Mobile Computing Set Up Copyright 2015 by Janson Industries.
High Speed Data Converter University
© 2016 Cengage Learning®. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Android Boot Camp.
Presented By: Muhammad Tariq Software Engineer Android Training course.
VistA Imaging Capture via Scanning. October VistA Imaging Capture via Scanning The information in this documentation includes only new and updated.
Installation Walk-Through Step 1 – Download the Installation Files
Android Hello World 1. Click on Start and type eclipse into the textbox 2.
Installing the Server Software The first step in creating a MagicInfo Pro digital signage system is to install and configure the MagicInfo Pro Server.
Using Microsoft Word & Excel §Open a new document in MS Word §Click on Tools & then Mail Merge l a dialogue box, like the one on this page, will appear.
1 PanelView ™ 300 Micro & MicroLogix ™ Lab 1. 2 Today you will receive training on the NEW PanelView 300 Micro operator terminal and the NEW version of.
First Venture into the Android World Chapter 1 Part 2.
Instructions.  Open up the letter that Adam has given to you  Format it so it look professional.
Remember…  Please do not…  Change the background.  Change the icons.  Change the font. Use Times New Roman (size 12 font).  Use color. We cannot print.
This is the Title slide. To insert a new slide, go to the Insert menu and select New Slide You can select from the slide layout for each new slide used.
 Given live by a presenter  Played without a presenter on a computer screen or on the Web  Slides provide a way to use text and graphics to introduce.
Quick guide to ASIMON configuration For version 3.0 or greater SAFETY AT WORK Date: 3/18/2009.
ANDROID APPLICATION DEVELOPMENT. ANDROID DEVELOPMENT DEVELOPER.ANDROID.COM/INDEX.HTML THE OFFICIAL SITE FOR ANDROID DEVELOPERS. PROVIDES THE ANDROID SDK.
EPICOLLECT Maggie Ortiz, EERI. EpiCollect Tutorial  This is a short tutorial prepared by EERI to walk you through creating an entry using EpiCollect.
This is how you invoke the Microsoft Visual Studio 2010 Software. All Programs >> Microsoft Visual Studio 2010.
TODAY Android Studio Installation Getting started Creating your 1 st App Beginning to understanding Intents.
Intoduction to Andriod studio Environment With a hello world program.
Precision Spine Inc. Mobile Device Setup. Android Devices.
Day 1 Session 2. Setup & Installation
Add Media in Company After Login Below screen will display
Obtaining the Required Tools
Wireless Mobility with Android
Enabling/Disabling JavaScript
Market Share. Market Share Market Share Android Dev Basics Android apps are developed in Java and XML. The hardest part of Android dev is coming up.
WEB TUTORIALS.
Mobile Application Development with MeeGo™ - Programming with SDK
How to make Parent Bookings
Software Setup & Validation
How to create an Itunes account to your computer
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
Introduction to PowerPoint
Print, Collate, and Staple
Creating forms by ‘AutoForm’
EVENT TITLE Time, Date Location
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
EVENT TITLE Time, Date Location
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
How to Format Your Paper MLA Style
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
Making a non-linear slide show
Department of Engineering Science EE 465 (CES 440) - Intro
Presentation transcript:

Flight Data Recorder (FDR) project status Master Student : Georgios Petropoulos Advisors : Joseph Timothy Foley Þorgeir Pálsson ITS Liason : Guðmundur Viktorsson

Avionics - Flight Data Recorder System Test (Project status) Data transfer standards  ARINC 429  ARINC 717 Georgios Petropoulos FDR project status

Digital Flight Data Acquisition Unit (DFDAU) => Flight Data Recorder (FDR) Low memory capacity => Loops the data every after 4 sec Speed 64 WPS WPS Sync word ( pointer to the start of the data reading ) ARINC 717 Protocol Georgios Petropoulos FDR project status

Linux ubuntu OS Document Test document 1 Test document 2 render PC tablet ARINC 717 Data Bridge usb AUsb mini Georgios Petropoulos FDR project status General Project’s graphical idea FDR box Other Device SAX or DOM API

Why Android? Android SDK Tools package AVD emulator configuration Java XML Java Android platform- programming languages Georgios Petropoulos FDR project status

XML general scheme - PDF documentation Georgios Petropoulos FDR project status

Java code examples (Eclipse)

Georgios Petropoulos FDR project status XML code examples (Eclipse)

ADC Data Bus Test ideas presentation Georgios Petropoulos FDR project status

Main page Georgios Petropoulos FDR project status

Begin FDR tester Exit “Welcome to the Data Flight Recorder system test” Avionics Flight_Data_Recorder Tester Welcome screen Georgios Petropoulos FDR project status

ARINC 429 Back “Aircraft Type _ Boeing 757” ARINC 717 Exit ? ? Avionics Flight_Data_Recorder Tester Entering - displaying the first options of the programme Georgios Petropoulos FDR project status

Fill the data needed in the boxes to proceed : Back Operators name Start time Location Next Avionics Flight_Data_Recorder Tester [Text] Inserting data to begin Georgios Petropoulos FDR project status

Back “Tests Menu” Avionics Flight_Data_Recorder Tester Run 1. Test I 2. Test II 3. Test III 4. Test IV 5. Test V 6. Test VI Choosing test to begin with Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” Avionics Flight_Data_Recorder Tester Run again SUBTASK (1) Do the ADC data bus test that follows: (a) Make sure the air data computing system is operational (PAGEBLOCK /501). (b) Set the Captain's ADC Source Select switch to the NORM position. (c) Push and hold the left air data computer switch on the P61 test panel for more than 7 seconds. (d) Set the SUBFRAME and WORD for each signal as shown in the ADC DATA BUS table. (e) Set the captain's ADC source select switch to the ALTN position. (f) Push and hold the right air data computer switch on the P61 test panel for more than 7 seconds. (g) Set the SUBFRAME and WORD for each signal as shown in the ADC DATA BUS table. ADC DATA BUS SIGNAL TEST SIGNALTESTER SETUPDISPLAY SUBFRAMEWORD ALTITUDE AIRSPEED Initial State (from the papers) Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” DONE “Do the ADC data bus test by following and completing each step in order” STEP 1 : Make sure the air data computing system is operational (PAGEBLOCK /501) SUBTASK Idea I Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” DONE STEP 2 : Set the Captain's ADC Source Select switch to the NORM position. SUBTASK Idea I Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” DONE STEP 3 : Push and hold the left air data computer switch on the P61 test panel for more than 7 seconds. SUBTASK Idea I Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” DONE STEP 4 : Set the SUBFRAME and WORD for each signal as shown below ALTITUDE Reference value : 0256 Measurement value: 0704 AIRSPEED Reference value : 0256 Measurement value: 0704 SUBTASK Idea I Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” Proceed SUBTASK Idea I Georgios Petropoulos FDR project status

EXIT “ADC Data Bus Test” TEST COMPLETED Please return to the “Tests options menu” by clicking the “Home” button and proceed to the next test or exit the programme by clicking the “EXIT” button Home Idea I Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” OK Idea II Begin and complete the ADC bus data test by following the instructions starting from below : Set the Captain's ADC Source Select switch to the NORM position. SUBTASK Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” OK Idea II Set the Captain's ADC Source Select switch to the NORM position. SUBTASK Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” OK Idea II Push and hold the left air data computer switch on the P61 test panel for more than 7 seconds. SUBTASK Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” OK Idea II Set the SUBFRAME and WORD for each signal as shown in the table below: SUBTASK ALTITUDEAIRSPEED Reference value Measurement value Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” OK Idea II. SUBTASK Georgios Petropoulos FDR project status

EXIT “ADC Data Bus Test” Home Idea II SUBTASK TEST COMPLETED SUCCESSFULLY Please return to the “Tests options menu” by clicking the “Home” button and proceed to the next test or exit the programme by clicking the “EXIT” button Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” OK Idea III Begin and complete the ADC bus data test by following the instructions starting from below : Set the Captain's ADC Source Select switch to the NORM position. SUBTASK Table Sjgnal test Georgios Petropoulos FDR project status

Return “ADC Data Bus Test” OK Idea III Set the SUBFRAME and WORD for each signal as shown in the table below: SUBTASK ALTITUDEAIRSPEED Reference value Measurement value Finish test Georgios Petropoulos FDR project status