Module 3: Ensuring Sustainability Session 1. Empowerment of the Community 1 CBDRR Framework Training - Myanmar Red Cross Society.

Slides:



Advertisements
Similar presentations
Claudia de Windt Senior Legal Specialist Department of Sustainable Development Strengthening Humanitarian Assistance and Prevention and Response Coordination.
Advertisements

Instructional Decision Making
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
School Improvement Through Capacity Building The PLC Process.
The NDPC-SD Intervention Framework National Dropout Prevention Center for Students with Disabilities Clemson University © 2007 NDPC-SD – All rights reserved.
European Social Fund Evaluation in Italy Stefano Volpi Roma, 03 maggio 2011 Isfol Esf Evaluation Unit Human Resources Policies Evaluation Area Rome, Corso.
What You Will Learn From These Sessions
1 Why is the Core important? To set high expectations – for all students – for educators To attend to the learning needs of students To break through the.
Emergency Management Roundtable Core Principles of Emergency Management.
At the end of this module, participants should have a better understanding of the following : Elements of Gender Mainstreaming Basics of Gender Analysis.
Standards and Guidelines for Quality Assurance in the European
The participants should have understood the following basic principles: Integrating gender considerations into project design and implementation Assessing.
Felix Omunu Disaster Risk Reduction Officer, Oxfam GB
Student Learning Objectives The SLO Process Student Learning Objectives Training Series Module 3 of 3.
Theme III Introducing Greater Impact Orientation at the Institutional Level Group 6.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Training of Process Facilitators Training of Process Facilitators.
Monitoring and Evaluation for Adult Education Programmes Module 1 © 2013 PRIA International Academy | Appreciation Courses Monitoring and Evaluation for.
Evaluation in the GEF and Training Module on Terminal Evaluations
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 10, 2011.
1 What are Monitoring and Evaluation? How do we think about M&E in the context of the LAM Project?
ORGANIZATIONAL DEVELOPMENT GROUP FOR CAPACITY DEVELOPMENT IN SWHISA CONTEXT B.D June 2006 H.R.D I.D O.D.
UNDP-GEF Adaptation 0 0 Impact of National Communications on Process of Integrating Climate Change into National Development Policies UNFCCC Workshop on.
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
Developing Indicators
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 13: Assessing Maternity Protection in practice Maternity.
IAOD Evaluation Section, the Development Agenda (DA) and Development Oriented Activities Julia Flores Marfetan, Senior Evaluator.
The Instructional Decision-Making Process 1 hour presentation.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
Module 2 Stakeholder analysis. What’s in Module 2  Why do stakeholder analysis ?  Identifying the stakeholders  Assessing stakeholders importance and.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
March 26-28, 2013 SINGAPORE CDIO Asian Regional Meeting and Workshop on Engineering Education and Policies for Regional Leaders Programme Evaluation (CDIO.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Implementing Cash for Work Programs -Rationale -Benefits and risks -Implementing steps -Gender -Forms and tools Bangladesh Cash Working Group, Jan 2015.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Welcome to Save the Children’s Presentation on Household Economic and Food Security of Extreme Poor me to Save the Children’s Presentation on Household.
Session: Enhancing Partnerships and Capacity Mosese Sikivou SPC/SOPAC.
Indicators for Program Quality The Ethiopian Great Race P-shift Launch Workshop April 30, 2008.
The inspection of local area responsibilities for disabled children and young people and those who have special educational needs Mary Rayner HMI Lesley.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 24, 2009.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Results-based Monitoring, Training Workshop, Windhoek, Results-based Monitoring Purpose and tasks Steps 1 to 5 of establishing a RbM.
United Nations Development Programme Ministry of Labour and Social Policy Local Public Private Partnerships THE BULGARIAN EXPERIENCE.
Application of Human Rights Principles in Results Based Management Muhammad Usman Akram, Evaluation Advisor Adapted from RBM training held for UNDP BRC.
RMCH Grantee Final Close Out Strategy Phineas Muchenjekwa RMCH Program Grantee Close out Meeting – 28 August 2014.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 9, 2012.
Integrating Disaster Risk Reduction into Humanitarian Programmes Lessons learnt and recommendations following the FRIEND Program.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Enhancing capacity in the Child & Youth sector through situated supported distance learning Building Capacity through a Participatory Institutional Assessment.
Monitoring and evaluation Objectives of the Session  To Define Monitoring, impact assessment and Evaluation. (commonly know as M&E)  To know why Monitoring.
The Literacy and Numeracy Secretariat Le Secrétariat de la littératie et de la numératie October – octobre 2007 The School Effectiveness Framework A Collegial.
Development of Gender Sensitive M&E: Tools and Strategies.
Measuring Institutional Capacity for Sustainability Mark D. Bardini, Ph.D. Chemonics International AEA Webinar September 15, 2011.
Evaluation What is evaluation?
Module 9: Transition and Exit Strategy ASEAN Training of Trainers (TOT) on Disaster Recovery.
Monitoring and Evaluating Rural Advisory Services
Stakeholder consultations
& gender mainstreaming
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
LEARNING REPORT 2016 Disasters and Emergencies Preparedness Programme
Technical Cooperation Section SEDI- Executive Office
Session 4: SDG follow-up and review mechanisms
Evaluation in the GEF and Training Module on Terminal Evaluations
Building Knowledge about ESD Indicators
RRI Baseline and Endline
Mainstreaming Climate Change Adaptation
Integrating Gender into Rural Development M&E in Projects and Programs
Presentation transcript:

Module 3: Ensuring Sustainability Session 1. Empowerment of the Community 1 CBDRR Framework Training - Myanmar Red Cross Society

Objectives At the end of this session, the participants will be able to  Understand the difference between baseline and end- line studies.  Describe the benefits of baseline and end-line studies in measuring the impacts of the CBDRR activities on the ground. 2

Measuring the Impact of CBDRR Programs Provides evidence based changes within the target community Changes include attitudinal or behavioral changes of the community, changes in organizations and institutions or changes in policies and knowledge and capacities of the beneficiaries Showcases the importance and relevance of CBDRR 3

Baseline & Endline Study Baseline Study Takes place at the beginning of a CBDRR program Provides basic demographic and disaster risk related information covering current local experiences, knowledge and interpretation of risk Endline Study Takes place at the end of a program Collects same data as baseline study after the CBDRR interventions have been implemented Both data sets are compared to see what changes have taken place over time 4

Key Principles Participation Teamwork Systematic approach 5

Process of Baseline & Endline Study Formation of Data Collection Team Training of Data Collection Team Data Collection & Analysis Presentation of Findings 6

Formation of Data Collection Team Specific tasks of the team should be identified in a ToR Like all the other teams that are established during the CBDRR program, the team should be as heterogeneous as possible If possible, the data collection team should consist of the same people during the baseline and endline study 7

Training of Data Collection Team Data collection team needs to be oriented on the use of participatory learning and action tools and analysis methods A framework for the study including the different information sources and methods employed as well as anticipated challenges should be developed during the training If necessary, a shorter refresher training should be conducted before the endline study 8

Data Collection & Analysis Studies are mostly based on questionnaires Sample size: at least 10% of all households in a village Criteria for respondents: > 15 years of age, permanent resident of village All data gathered needs to undergo screening process to ensure that the data is relevant, accurate and complete 9

Keep in Mind… A quality control process needs to be in position to guarantee the high quality and reliability of the data. In general, the data, at the stage of collection, has to undergo screening process based on their precision, accuracy, relevance and completeness. There should be a gender balance with regard to the interviewees to ensure a better understanding of the situation on the ground. In both baseline and end-line studies, data gathering should cover the schools. 10

Presentation of Findings Reports are prepared by M&E office Should mainly feature quantitative data 11

Any Questions? 12

Module 3: Ensuring Sustainability Session 2. Empowerment of the Community 13 CBDRR Framework Training - Myanmar Red Cross Society

Session Objectives At the end of this session, the participants will be able to  Understand the importance of having an exit strategy from the beginning of the CBDRR program  Describe different elements essential in handing over of the program activities  Formulate a suitable exit strategy to ensure the proper handover 14

Exit Strategy A plan describing how the program intends to withdraw its resources while ensuring that achievement of the program goals is not jeopardized and that progress towards these goals will continue 15

Why Do We Need an Exit Strategy? To ensure the continuity of the risk reduction efforts To safeguard the investments that have been made To prevent the recurrence of the original problems To exhibit vote of confidence the program has entrusted to the community To allow the employment of participatory approaches encouraging the involvement of key stakeholders To provide ample notice to the stakeholders sufficiently preparatory time To strengthen the relations between the implementing agency, the cooperating partners and the target communities 16

Planning to Exit Planning of the exit strategy should start right in the beginning of the program Stakeholders should be prepared from the beginning about their tasks and responsibilities after the program Sustainability planning: the exit strategy should have benefits for the community irrespective of timing and context 17

Realizing the Exit Strategy Finalization of the exit point Strengthening the local partnerships and local capacities Revisiting the Action PlanProvision of HardwareMentorship 18

Finalization of Exit Point Time of final exit should be flexible:  Time limit  Achievement of program impacts  Achievement of benchmarks Different activities may require different exit points 19

Strengthening Local Partnerships All capacity building activities throughout the program should be conducted with the mind-set of getting ready not just for managing disaster risk reduction activities within the program but also beyond it Key activities:  Revisiting action plan  Provision of hardware  Mentorship 20

Revisiting the Action Plan Review the priorities of Action Plan against actual changes Identify changes in the risk situation on the ground If necessary, assist the community in revising the old Action Plan 21

Provision of Hardware Essential hardware such as emergency kits should be handed over Project documents and assessment reports/maps if available should be given to DMC as well 22

Mentorship MRCS should act as an on-going mentor to the recipient organization/community which can enhance the gradual transition during the period of shifting responsibilities and activities 23

Any Questions? 24