How to organize ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Tracking Meeting December 8, 2006 Tracking Review at Beijing.

Slides:



Advertisements
Similar presentations
GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
Advertisements

CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
R Frey ESTB20111 Silicon-Tungsten Electromagnetic Calorimeter R&D Collaboration M. Breidenbach, D. Freytag, N. Graf, R. Herbst, G. Haller, J. Jaros, T.
Tracking Efficiency and Momentum Resolution Analysis Chris Meyer UCSC ILC Simulation Reconstruction Meeting March 13, 2007.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
Vertex 2010, University of Glasgow News on Vertex 2010 Chris Parkes, Lars Eklund.
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
IDAG Tracking Review  Groups have not yet submitted LOI  Avoid ‘temptation’ to regard as a Technical Design Review  Rules Specified –leave groups to.
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
7 th February 2007ILC ACFA workshop - Beijing 1 ILC Detector R&D Tracking Review – Progress Report Chris Damerell RAL On behalf of the ILC Detector R&D.
SiD Tracking Simulation: Status and Plans Richard Partridge for the SiD Tracking Group Vancouver Linear Collider Workshop July 19-22, 2006.
1 + DOE/NSF ILC Detector R&D Review June19-20, 2007 At Argonne National Laboratory Paul Grannis Jim Whitmore.
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
How we’re organizing ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Advisory Meeting December 11, 2006 Tracking Review at Beijing.
Workshop Goals SiD RAL Workshop April 14, 2008 John Jaros.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Overview of SiD Tracking Rob Kutschke,Fermilab LSWS07 June 1, 2007 (Layer 5) (Layer 1) VXD.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
7th November 2006ILC Regional meeting - Valencia 1 ILC detector R&D – new organisation Chris Damerell RAL On behalf of the ILC Detector R&D Panel (a Panel.
1 R&D Advances: SiW Calorimeter LCWS 2010 Beijing SiD Concept Meeting March 28, 2010 John Jaros for SiD SiW Group (thanks to Ray, Ryan, Mani, and Marco.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
A Fourth Detector Concept (no name, yet) Silicon Vertex: 3-4 layers, conventional Tracking TPC: 1 atm, moderate B field Calorimeter: measure all main fluctuations,
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
SiD Vertexing and Tracking Contribution to the LOI Bill Cooper Marcel Demarteau Ron Lipton Rich Partridge Dong Su For the SiD Vertex/Tracking Group SiD.
SiD Tracking Status Richard Partridge Brown / SLAC Fermilab ALCPG Meeting.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
SiD Tracking in the LOI and Future Plans Richard Partridge SLAC ALCPG 2009.
SiD Workshop, SLAC, Oct. 28, 2006, Marcel DemarteauSlide 1 Status of Tracking Design, Performance and R&D SLAC Oct. 27, 2006 SiD Workshop Marcel Demarteau,
Tracking: An Experimental Overview Richard Partridge Brown / SLAC Fermilab ALCPG Meeting.
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
Rich Partridge, Marcel Demarteau for the Tracking Group SiD Workshop April 11, 2007 Fermilab Tracking Review at Beijing Post-Mortem.
October 2014Silicon Pixel Tracker – Chris Damerell 1 Tracking sensor, one of 12,000, 8x8 cm 2, 2.56 Mpixels each Matching endcaps (only one layer shown)
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
SiD R&D Plan and Opportunities for New Collaborators
Test Beam Request for the Semi-Digital Hadronic Calorimeter
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Concluding remarks E. Migneco
SiD Calorimeter R&D Collaboration
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
detector development readout electronics interconnects bump bonding
Preparations for the SiD Workshop at Fermilab, April 9-11
The SiD Detector Outline Overview
January Collaboration Meeting
The DBD: Outline and Scope
SiD Tracking What’s Next?
Why do we want a TPC? P. Colas, CEA Saclay
Why do we want a TPC? P. Colas, CEA Saclay
The Silicon Detector Design Study European Kickoff Meeting
Presentation transcript:

How to organize ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Tracking Meeting December 8, 2006 Tracking Review at Beijing

SiD Tracking Meeting, Dec. 8, 2006, M. Demarteau Slide 2 ILC Detector R&D Review Damerell panel will review tracking at Beijing GDE/ACFA meeting Sunday 4th Feb: ILC Workshop, opening plenaries Monday 5th Feb: Tracking Review - open session presentations, followed by dinner for all involved. Tuesday 6th Feb: Tracking Review - closed session discussions with individual groups Wednesday 7th Feb: ILC Workshop, closing plenaries Thursday 8th Feb: Tracking Review - closed session feedback of draft report to individual groups Tracking Review Committee (18 members, may have changed): Panel members (Damerell, Karlen, Kim, Lohmann, Weerts) RDB members (Elsen, Himel, Willis) Consultants (Braun-Munzinger, Giomataris, Sauli, Hamagaki, Heijne, Sadrozinski, Spieler, Unno) Two tracking organisers from Beijing workshop (Li Weiguo will select them)

SiD Tracking Meeting, Dec. 8, 2006, M. Demarteau Slide 3 Review Chris sent out a memo Nov. 30: “Guidelines for Participating Groups”; Follow-up memo this morning, Dec. 8 th Collaborations should decide how they would like to present work When bids are in, review committee will allocate time and make suggestions Time allocation: morning of 5 th : gaseous tracking LC-TPC two hours of presentations 4 th concept: one or two talks, to be negotiated with John Hauptman afternoon of 5 th : silicon tracking SiLC two hours of presentation SiD two hours of presentation Additional groups outside these 4 collaborations will be given typically a 15 min talk

SiD Tracking Meeting, Dec. 8, 2006, M. Demarteau Slide 4 Presentation Format Any effort integrated with the SiD concept can be part of the two hours of presentation allocated to SiD We contacted all tracking efforts we know off Brown U (Partridge) U of Colorado (Wagner) Kansas State, Bonn U (von Toerne) Purdue University (Bortoletto) SLAC-Fermilab (Nelson, Cooper) University of Michigan (Riles) UC Santa Cruz (Schumm) University of New Mexico (Seidel) UC Davis If any of these efforts would like to be included in the SiD allocation, we’d be happy to do so (we can negotiate for more time if need be) If groups would like to represent themselves they should let Chris know

SiD Tracking Meeting, Dec. 8, 2006, M. Demarteau Slide 5 Approach SiD specific part of the review Address core SiD philosophy: Emphasize uniform technology central and barrel region of SiD SiD is unique in forward region Need backup with tracking and benchmarking studies Description of SiD performance and software development Sensor R&D of double-metal layer with kPix chip readout Module design Barrel and forward disk design and mechanical support Emphasize that forward region needs R&D to optimize performance Assumed that software development (Brown, Colorado, KSU) be integral part of this section of the presentation Address core contributions from individual groups Alignment system Cable design kPiX, bump bonding Time over Threshold ? Thin silicon ? Do we reach out to include other efforts ?

SiD Tracking Meeting, Dec. 8, 2006, M. Demarteau Slide 6 Report Damerell review panel would like a written report by Jan. 28 Ideally the report should give an overview of the goals, starting from current status, up to the completion of their R&D programme, ready to start construction Scope indicated by panel (see next slide) is far too broad to be accomplished on such a short time scale Better strategy may be to start with SiD DOD or SiD section of DCR and highlight the R&D that is needed and give a solid estimate of the effort and M&S needed to complete the R&D This could nicely fit in with the call for the 5-year R&D proposals by the ALCPG We’re willing to help coordinate the effort for all the groups, but we need your feedback

SiD Tracking Meeting, Dec. 8, 2006, M. Demarteau Slide 7 Scope of Report Requested written report by Jan. 28 Overview of the goals, starting from current status, up to the completion of their R&D programme, ready to start construction: overall physics-driven performance goals track-finding efficiency, down to what lower limit of polar angle and momentum special case: tracks originating from B and D decays beyond the vertex detector forward tracking - a weak area or not? combination of difficult factors, such as long-lived decays, small polar angles, tracks in core of jets momentum resolution vs momentum and polar angle over full range dE/dx performance - how useful is this for physics? design of sensors, modules, and support structures readout electronics and DAQ system system power dissipation, quantifying the benefits of pulsed power if used cooling system cabling and fibre optics - power and data other infrastructure such as gas control systems overall mechanical stability - implications of push-pull on calibration needs vulnerability to errant beam bunches - 'fliers' overall material budget; implications of secondary interactions and photon conversions on system performance such as jet energy resolution other topics that lie in the cracks between tracking and other subsystems Report should discuss R&D program subdivided into work packages