Research on Single-phase Ground Fault Locating for Non-effectively Grounded System in Shanghai Weibin Wang Shanghai Municipal Electric Power Company, China.

Slides:



Advertisements
Similar presentations
Introductory Circuit Analysis Robert L. Boylestad
Advertisements

Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Long RAnge Navigation version C
Distributed Intelligence Provides Self-Healing for the Grid
SELF-ORGANIZING MEDIA ACCESS MECHANISM OF A WIRELESS SENSOR NETWORK AHM QUAMRUZZAMAN.
IEC Short-circuit current making and breaking tests Taiwan-European HVAC apparatuses Accreditation and Certification forum Harethe El Ouadhane.
Chapter 11.
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
Frankfurt (Germany), 6-9 June 2011 FLEXIBLE THERMAL LOAD MANAGEMENT FOR ANCILLARY SERVICES MARKET: EXPERIENCE OF SWISS SMART GRID PILOT PROJECT Elvira.
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Electronics Cooling Mechanical Power Engineering Dept.
CIRCUIT BREAKER.
CheckMeter 2.3 Portable Working Standard Page 1 March 2009.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
Troubleshooting methods. Module contents  Avaya Wireless tools  Avaya Wireless Client Manager  Avaya Wireless AP Manager  Hardware indicators  Non.
Cellular IP: Proxy Service Reference: “Incorporating proxy services into wide area cellular IP networks”; Zhimei Jiang; Li Fung Chang; Kim, B.J.J.; Leung,
Greenbench: A Benchmark for Observing Power Grid Vulnerability Under Data-Centric Threats Mingkui Wei, Wenye Wang Department of Electrical and Computer.
Frankfurt (Germany), 6-9 June 2011 Ying Wang – China – Session2– Paper 0587 Voltage Sag Frequency Assessment Considering Customer Satisfaction Degree Ying.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
2 Stefano Agosta CERN IT/Communication Systems High-Speed Mobile Communications in Hostile Environments CHEP 2015 Okinawa 14/04/2015 High-Speed Mobile.
GML-3 GPRS BASED METER AND LOGGER THREE PHASE METER WITH INBUILT DATA LOGGER © Embuilt Technologies Visit us at Or For.
Introduction to Power System Dr. Jing Wang Head of Institute of Power Electronic and Electric Drive
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
1 Some Issues about Big Data in Power Grid Gary Quan.
Frankfurt (Germany), 6-9 June 2011  Speaker Jean LAVALLÉE  Authors Janislaw TARNOWSKI, Jacques CÔTÉ, André GAUDREAU, Pierre GINGRAS, Mircea IORDANESCU.
Critical Need for Communications Protection in a Deregulated Power Market 1999 IEEE/PES Ernest M. Duckworth Jr., P.E., Senior Member IEEE & John S. Duckworth,
SFT 2841 IN CONNECTED MODE Prepare setting files.
TWENTIES : EU project Massive integration of renewable T&D Smartgrids How cable dynamics may help ? ISCD Shanghai- October 18th, 2011 J ean-Louis.
Frankfurt (Germany), 6-9 June 2011 Shaoqing Ying– China – RIF Session 4 – 0806 Impact of an increasing Penetration of urban Photovoltaic systems and electric.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Frankfurt (Germany), 6-9 June 2011 Hans-Erik Olovsson – Sweden – Session 1 Network Components – Paper 0453 Innovative Compact 145/12 kV Indoor Air Insulated.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Frankfurt (Germany), 6-9 June 2011 Luciano Martini – IT – RIF S1 – Paper 0339 Development and Testing of Innovative Fault Current Limiters for Distribution.
Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen,
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
14/06/2004NORPIE Paralleling of 3-phase inverters a part of my PhD study: "Control and monitoring for distributed power supply“ which is a part of.
Frankfurt (Germany), 6-9 June 2011 Analysis of Protection Malfunctioning in Meshed Distribution Grids Evita PARABIRSING Dr. Edward COSTER Dr. Marjan POPOV.
Frankfurt (Germany), 6-9 June 2011 Lindinger– AT – RIF Session 2 – 0085 Martin J. Lindinger Herwig Renner Ernst Schmautzer Graz University of Technology.
HT-7 HIGH POWER MICROWAVE TEST SYSTEM AND EXPERIMENTS WANG Mao, LIU Yue-xiu, SHAN Jia-fang, LIU Fu-kun, XU Han-dong, YU Jia-wen Institute of Plasma Physics,
Frankfurt (Germany), 6-9 June 2011  In the future, traditional fuse based over- current protection of LV networks will not be applicable for LV microgrids.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
© 2005, Itron Inc. The Itron logo is integrated into the background and can not be modified, moved, added to, or altered in any way. Slide Heading Style.
Georg Koeppl, Dieter Braun Koeppl Power Experts ABB
Frankfurt (Germany), 6-9 June 2011  Manfred Wurm  EVN Netz GmbH, Austria Wurm – Austria – Session 3 – 0915 EARTH FAULT DISTANCE LOCALIZATION IN INDUCTIVE.
Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks.
ADVANCED SPECTRAL ANALYSIS OF OUT-OF-STEP OPERATION OF SYNCHRONOUS MACHINES Zbigniew Leonowicz BSI Riken, ABSP Lab. Wako-shi, Saitama, Japan
Advanced Sensors for the Smartgrid
Kaihua Xu, Di Zhang, Yuhua Liu, Ke Xu, Yuanhao Xi ISCCCA-13 Taiyuan, China Design of Deformation Monitoring Terminal System Based on STM32 STM
Frankfurt (Germany), 6-9 June 2011 Improving the data quality of the LV-connectivity Intro Problem statement  What  Why Proposed solution Case Conclusion.
Submitted to: Submitted by:
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
Solar tracker system.
CheckMeter 2.1 Portable Working Standard Page 1 March 2009.
Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 GAME ANALYSIS OF INTEREST GROUPS IN POLICY-PROCESSING OF POWER GRID CONSTRUCTION.
132KV GSS PIPAR CITY JODHPUR
Frankfurt (Germany), 6-9 June 2011 Paulo Pereira – Brazil – Session 2 – 0993 OPTIMIZATION OF VOLTAGE REGULATOR SETTINGS AND TRANSFORMER TAP ZONES IN DISTRIBUTION.
Frankfurt (Germany), 6-9 June 2011 Management of Partnership Networks in Electricity Distribution Business  Traditionally DSOs in Finland have done everything.
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Impact of Distributed Generation on Fault Induced Transients: A Case Study Sukumar Brahma Adly Girgis Clemson University Electric Power Research Association.
USER GUIDE TEMPERATURE CONTROLLER TR-2006 Hot runner temperature controller ShenZhen TanRex Electronic Co.ltd.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
iuyoiuyiouy Erik Hoff, Tore Skjellnes, prof. Lars Norum
Hao Zhai, Hao Yi, Zhirong Zeng, Zhenxiong Wang, Feng Wang, Fang Zhuo
Gaurav Sharma John Hannah Vivekanand Sivaraman
Gaurav Sharma John Hannah Vivekanand Sivaraman
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Exercise Session 11 Power systems.
Presentation transcript:

Research on Single-phase Ground Fault Locating for Non-effectively Grounded System in Shanghai Weibin Wang Shanghai Municipal Electric Power Company, China Weibin Wang – China – Session 3 – 0084

Frankfurt (Germany), 6-9 June 2011 Contents Weibin Wang – China – Session 3 – 0084 Introduction 1 Traditional Ways to Find the Fault Spot 2 Fault Locating System 3 4 Conclusions 5 Actual Application

Frankfurt (Germany), 6-9 June 2011  Several neutral point grounding modes for 10kV grids in Shanghai  Low resistance (urban & Pudong districts)  Arc suppression coil (west district)  Ungrounded system (some small area)  Fault locating system is used in the west district Weibin Wang – China – Session 3 – 0084 Introduction

Frankfurt (Germany), 6-9 June 2011  Recently, parallel resistance has been added nearby the arc suppression coil to increase the selection accuracy of ground fault feeder Weibin Wang – China – Session 3 – 0084 Introduction

Frankfurt (Germany), 6-9 June 2011  Manual search method - time-consuming, laborious  Fault feeder selector - can’t locate the fault spot  Old fault indicator - can only locate the short-circuit faults, it can’t locate the ground faults Weibin Wang – China – Session 3 – 0084 Traditional Ways to Find the Fault Spot

Frankfurt (Germany), 6-9 June 2011 Traditional ways to find the fault spot  What is the key? - single-phase ground faults are the most frequent type of faults - traditional ways are not valid for locating single-phase ground faults - people’s requirement is rising, the demand of reliability is also rising  So, it is necessary to find a valid way to locate the ground fault quickly Weibin Wang – China – Session 3 – 0084

Frankfurt (Germany), 6-9 June 2011 Fault Locating System  Principle : signal injection method - first select the fault feeder - inform the master station - the parallel resistance will be put in and ablate it for 6 times - a characteristic current will be produced - indicators before the fault spot will detect the characteristic current, the indicators after the fault spot will not. - send data to the master station - the fault spot can be determined

Frankfurt (Germany), 6-9 June 2011  Action series: the duration time is 100ms, the interval time is 10s  Judgment : fault indicators capture the characteristics current ≥ 5 times  Factors: - In order to distinguish the characteristic current from the grid disturbance, put in and ablate the parallel resistance for several times - Considering the cooling of parallel resistance, the interval time should be enough Weibin Wang – China – Session 3 – 0084 Fault Locating System put in the parallel resistance ablate the parallel resistance t Ia 100ms 10s

Frankfurt (Germany), 6-9 June 2011  size :120*190*50mm  Installation - they are always installed evenly on trunk lines, and on each branch joints - hang it on the line, then rotate it 90 degree clockwise to close - rotate it counterclockwise to release, then take it down Weibin Wang – China – Session 3 – 0084 Fault indicators

Frankfurt (Germany), 6-9 June 2011  Functions - communication with the arc suppression coil controller - analyze and locate the fault spot, and flash it in GIS - management of fault indicators - display fault current wave - history data storage Weibin Wang – China – Session 3 – 0084 Master station

Frankfurt (Germany), 6-9 June 2011  GPRS: operation cost is high (so many indicators), RF technology: cheaper  indicators—repeater—transfer one by one--master station  433Hz, it is free  self-checking periodically Weibin Wang – China – Session 3 – 0084 Communication

Frankfurt (Germany), 6-9 June 2011 Actual Application  The system was tested strictly for many times in the lab  Applied to two 10 kV over-head lines - 54 fault indicators, 20 wireless repeaters - installation was ended in January  Result - so far, so good - part of the performance has been optimized Weibin Wang – China – Session 3 – 0084

Frankfurt (Germany), 6-9 June 2011  The fault locating system can locate single- phase ground faults, short-circuit faults, disconnection, etc  It takes full use of the existing parallel resistance, thus reduces the investment  A communication interface should be set up between the arc suppression coil controller and the master station of fault locating  In the future, we will still improve its performance, and use more widely in 10kV grids Weibin Wang – China – Session 3 – 0084 Conclusions

Frankfurt (Germany), 6-9 June 2011 Thank You! Weibin Wang – China – Session 3 – 0084