Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Data Logger/ Daily Meter Reading Processes. New Daily Metered Site  DM Service Provider receives a request from Gas Shipper for installation of daily.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Why does OTEG need a charging subgroup? OTEG Open Meeting 3 July 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
Organising Meetings >>> Identifying the need for a meeting Planning a meeting Arranging a meeting Topic 1 Topic 2 Topic 3.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EHV generation charging methodology change Harvey Jones.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod Clarifications Transmission Workstream 6 August 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
The RGGI Auction Allocation Process: Concerns and Recommendations Presented by James H. Savitt, Ph.D To The RFF Auction Workshop in NYC 20 July 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Energy Market Regulatory Authority of TURKEY (EMRA) Yusuf GÜNAY President, Energy Market Regulatory Authority Budapest, Hungary May 19, th Annual.
European Developments Transmission Workgroup 3 rd May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Www2.nationalgrid.com/bsuos An Introduction to Balancing Services Use of System Charging (BSUOS)
CUSC Panel – 19th July 2016 Binoy dharsi
EU Tariffs Code Update Based on Refined Draft as of 30th October
Transmission Planning Code – Draft Document
An Introduction to Balancing Services Use of System Charging (BSUOS)
Holistic view of Charging Modifications – In flight 11th June 2018
Introduction to the UK Economy
SO Incentives from April 2010
TSC Modifications Panel Meeting
PARCA Security and Termination Amounts
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. CMP244: Extension of the TNUoS tariff notice period – National Grid actions 7 th July 2015

Action 3: 1 month notice period in transmission licence  Where does 1 month notice period come from within the Transmission licence?  Potentially Standard transmission licence condition C4.5  ‘Where [the licensee] has decided to implement any proposals to change use of system charges (other than in relation to charges to be made in respect of the balancing services activity), shall give the Authority notice of its decision and the date on which proposals will be implemented which shall not, without the consent of the Authority, be less than a month after the date on which the notice required by this sub-paragraph was given. 2

Action 7: OFTO arrangements around ‘unanticipated events’  Standard conditions E12. J3 and J4 of an OFTO’s licence define terms that can lead to an annual adjustment of the OFTO revenue stream.  Number of individual terms, that can be broadly grouped as:  Market revenue rate adjustment (main impact in first 1-2 years)  RPI adjustment  Availability incentive  Correction factor  Pass through items – to permit the OFTO to recover certain costs they are unable to control e.g. annual network rates. This includes a tender fee reconciliation in yr 1 or 2 of the OFTO’s licence, other rates plus a terms for ‘an income adjusting event revenue adjustment’.  An income adjusting event is defined as force majeure, an amendment to the STC not allowed for when OFTO revenue was set, or any other event deemed to be an income adjusting event by the Authority where costs have increased / decreased by a threshold amount. 3

4 Action 7: OFTO arrangements around ‘unanticipated events’ - continued

Action 9 – accuracy of OBR exchange rate forecast  Currently CUSC specifies use of the year ahead OBR Spring Euro exchange rate forecast i.e. Mar 2014 forecast for 15/16 tariffs.  Further work needed to determine impact on EU 838/2010 (action 8) 5 Actual outturn Forecast y-1 Forecast y / Euros to £ 1.16OBR not created 2013/ /15(1.27)

Action 11 - Inaccuracy of tariffs 15m ahead  Initial analysis undertaken that does not include impact of location  Looked at forecasts of transmission owner revenue, generation and HH / NHH demand 14 months ahead as per the initial view reports, to understand error margin 14 months ahead on each of these.  At a broad level, can understand tariffs as taking the forecast of revenue as the numerator, and charging this across the charging base (generation and demand) – the denominator. Revenue collection is of course split across the charging base via the G:D split, and across different components of demand (HH and NHH). 6

TO revenue forecasting 14 months ahead £m Nominal Initial View TNUoS Latest (TNUoS only) Difference actual and 14m MAR Error margin 2015/16 2,6502, % 2014/15 2,4332, % 2013/14 Price control2,100 n/a 2012/13 1,8131, % 2011/12 1,7271, % 2010/11 1,6031, % 7

Generation forecasting 14m ahead 8 GWInitial ViewActual Difference actual and 14m genError margin 2014/ % 2013/ % 2012/ % 2011/ % 2010/ %

Demand forecasting 14m ahead 9 HH MWInitial ViewDemand Rec Difference actual and 14m dmd Error margin 2014/15 16,100 14, % 2013/14 16,100 14, % 2012/13 17,167 15, % 2011/12 19,063 15, % 2010/11 18,578 16, % NHH Initial ViewDemand Rec Difference actual and 15m dmd Error margin 2014/ % 2013/ % 2012/ % 2011/ % 2010/ %

Impact on TO revenue recovery and tariffs  Looked at last 5 years looking at forecasts of revenue, generation and demand (applying the relevant proportions of revenue recovered from generation, NHH demand and HH demand respectively) to understand how these forecasting errors would affect TO revenue recovery and tariffs (at a high level – does not take account of locational factors).  Have run some Monte Carlo analysis to look at a worst case analysis (based on historical perfomance) also. 10

11 YearEstimated under / over recovery 15m ahead As a proportion of TO revenue 2014/15-£186.3m-7.6% 2013/14Price control 2012/13-£ % 2011/12-£89.2m-5.4% 2010/11-£40.7m-2.6% Worst case scenarios15/16: -£380m to +£140m +5.3% to -15.2% Impact on TO revenue recovery and tariffs

Action 15 – Timescale document  In progress  End product will be a ‘fishbone’ type diagram to look at timescale on information and potential error margin associated with this: 12

Other actions in progress  Action 8 – re-examination of the 7 and 14% margins calculated as part of CMP224  Actions 12,13,14 – impact on tariffs of a large change to generation (looking at the impact of a 10% change to generation or closing of the largest generation project in each zone) and impact of infrastructure delay  Action 19 – indicative value can be taken from the 2013 price control where revenue was over forecast by 16.3% 14 months ahead. In 2021 revenue terms this would be approx. £560m. 13