DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos 29-30 november 2010 Présenté par : JP. Marcovici Sigle.

Slides:



Advertisements
Similar presentations
EIS/Solar-B: 3. Electrical Interface to MDP EISMDP PIM HK PIM DHU DR analog data (temperature, current, etc.) S/C bus image compression status data command.
Advertisements

FloormapVS2i.
Supported by GSI, BMBF (06FY9099I), EU (FP7-WP26) A Prototype Readout System for the MVD of the CBM Experiment Christoph Schrader for the CBM-MVD Collaboration.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
CNES has scheduled the launch of PICARD microsatellite in October (1) SA (F) IRMB (B) PMOD (Ch) OCA Nice University IAS LMD (3) Yale university HAO.
1. THE OSIRIS TUNABLE FILTERS  OSIRIS uses two 100 mm aperture Fabry-Perot tunable filters. One of them is optimized for short wavelengths, and one for.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
SDW20051 Vincent Lapeyrère LESIA – Observatoire de Paris Calibration of flight model CCDs for CoRoT mission.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Developments of CCSDS Data Compression for Space Exploration in CSSAR/CAS Center for Space Science and Applied Research Chinese Academy of Sciences
Nice 03/12/2008 THE HELIOSEISMOLOGY PROGRAM OF PICARD T. Corbard, O.C.A. T. Appourchaux, I.A.S. P. Boumier, I.A.S. B. Gelly, THEMIS R.A. Garcia, S.J. Jiménez-Reyes,
A. Homs, BLISS Day Out – 15 Jan 2007 CCD detectors: spying with the Espia D. Fernandez A. Homs M. Perez C. Guilloud M. Papillon V. Rey V. A. Sole.
1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 1 EddiCam: The Eddington Photometric Camera Preliminary design.
L. Damé — ICSO 2000 — December 7. Presentation Content Key Mission aspects Scientific objectives Performance requirements SODISM/PICARD telescope concept.
ISUAL Test Verification Matrix H. Heetderks. TRR December, 20002NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- Imager Related.
Undergraduate Space Research Symposium University of Colorado Boulder
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
ISUAL Sprite Imager Electronic Design Stewart Harris.
1 Warsaw University of Technology Faculty of Electronics and Information Technology Institute of Electronic Systems HARDWARE SIMULATOR of the high-resolution.
Clock Board Test and Preliminary Acceptance Criteria Ciemat (Madrid), April 2009 Juan de Vicente, Javier Castilla, Gustavo Martínez.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Update of the French activities relevant to ILWS Jean-Yves Prado, CNES.
Solar Physics Task Group Solar Physics Task Group report written by the chair Todd Hoeksema reported by Werner Schmutz
Getting Ready for PICARD Helioseismology Program – Decembre NICE THE PICARD PAYLOAD DATA CENTER Grégory PRADELS
1-1 NET+OS Software Group Flash API Multiple flash memory bank support New Flash API introduction Detailed Flash API Function presentation Supporting.
TESIS on CORONAS-PHOTON S. V. Kuzin (XRAS) and TESIS Team.
PACS IIDR 01/02 Mar 2001 On-Board Data Compression1 On-Board Data Compression Concept A. N. Belbachir Vienna University of Technology.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
1 SOVAP - BOS (Bolometric Oscillation Sensor) DAVOS Scientific meeting A1: calibration A2: validation A3: Science products determination A4: Routine and.
Picard Consortium meeting – PMOD/WRC, Davos, Nov 2010 Instrument SOVAP ( IRMB A. Chevalier pour S. Dewitte)  Flight operations  Right shutter status.
Solar Irradiance (Swiss contributions to ILWS) 4th ILWS general meeting, Beijing, June 22-23, 2006 Werner Schmutz, PMOD/WRC, Switzerland (representing.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
1Corot Science Week, Berlin, December 2003 Inside the COROT machine Overview of global loop for COROT operations Description of COROT Subsystems.
Torsten Böker TIPS May 2, 2002 NICMOS post-cooldown detector performance 1) SMOV status 2) Dark current 3) Quantum efficiency 4) “First light”, focus and.
Davos consortium discussion. Possible topics 1.Interests common to PREMOS, SOVAP, SODISM 1.New lab experiments 2.cross calibration 3.Onboard synchronisation.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
1. 2 Content: ► 1pc Magnus Fusion Aircraft Vantage ► 1pc - Notebook based workstation for camera control and video display and storage ► 1pc - Peripherals.
ISUAL Data Formats & Science Data Processing S. Geller.
Lane Detection in OpenCL
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
Corot:Ubatuba Nov The Ground Segment: Data Processing. Software development in laboratories. Brazilian contribution. Michel Auvergne Réza Samadi.
Status DETECTORS: -Baseline for 2mm: -Baseline for 2mm: NICA 5a (144 pixels, IRAM, 30nm sputtering); average sensitivity: 6mK/Hz 0.5 (1Hz) corresponding.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
1 WFC3 – Critical Science Review Science Driven CEIs Requirements.
Status of PREMOS data SOLID Workshop 14th October 2013 G. Cessateur for the PREMOS team PMOD/WRC, Switzerland.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
ESA Living Planet - Begen – June B. Christophe, J-P. Marque, B. Foulon ESA LIVING PLANET SYMPOSIUM June 28 th -July 2 nd 2010 Bergen (Norway)
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
Full Mission Simulation Test Report RocketSat CU Boulder
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
NCKU_UCB_TohokuISUAL-IFR : DCM (version 2.0) July 9, 2001Tong-Long Fu 1 Data Compression Module ( DCM ) Tong-Long Fu Laboratory of RF-MW Photonics, Department.
OPTICAL SENSORS DESIGNED IN FRAME OF THE AEROFAST PROJECT IN SPACE RESEARCH CENTRE PAS On board instrumentation Pyroelectric sensor Imaging Multispectral.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Update of the French activities relevant to ILWS
OSIRIS Full Team Meeting Welcome, Introduction, Logistics
Joint Meeting of the CCSDS and the OMG-SDTF
The Solar Oblateness Measured On Board The PICARD Spacecraft,
OSIRIS operation summary
LYRA on PROBA2 and other PMOD/WRC irradiance experiments
VIRTIS Operations at Lutetia
Swiss contributions to ILWS 13. 6
Metis On-Board SW overview
Gérard Thuillier, Service d’Aéronomie du CNRS Jean-Yves Prado, CNES
SLAC DOE Program Review
Launch and On-orbit Checkout
Automatic Sunspots Detection in SODISM Solar Images
USP-IAG Universidade de São Paulo
Presentation transcript:

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle : LATMOS PLATFORM STATUS I

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 2 SOMMAIRE - STATUS OF PGCU AND FLIGHT SOFTWARE - OPERATING MODE - CHANGE OF CONFIGURATION - FLOW SODISM SCIENCE TM - SOME PRELIMINARY REPORT FOR SODISM - UPDATE OF THE OPERATIONNEL FLIGHT SOFWARE

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 3 STATUS OF PGCU AND FLIGHT SOFTWRE - Load a new operational flight software after launch with dump of the flash and verification by dowload of the code status : OK - Communications PGCU SODISM SOVAP PREMOS status : OK - No error detected - Patch operation (28/9/2010) status : OK

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 4 OPERATING MODES SODISM : ETH mode Decontamination, Nominal Scientific mode : Nominal mode, Night Mode, Distortion, Stellar PREMOS : Science and Night mode SYNCHRONIZATION : SODISM SOVAP Each day SODISM PREMOS : Twice per orbit for 215nm and 607nm with HEAD B Channel 1 and 2 SOVAP : A02, A03, A04,A09, A14 R04, R05, R06, R10 MUX0, MUX5

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 5 CHANGE OF CONFIGURATION SODISM : change thermal configuration DateTemp CCDDateTemp CCD 31/7/ °C4/9/ °C 3/8/ °C21/9/ °C PREMOS : change thermal configuration DateTemp CCDDateTemp CCD 26/7/2010TH1=24°C TH2=23°C 13/9/2010TH1=26°C TH2=25°C 6/9/2010TH1=26°C TH2=26°C SOVAP : mode used on board A02, A03, A04,A09, A14 R04, R05, R06, R10 MUX0, MUX5

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 6 FLOW SODISM SCIENCE TM They are two compression on board Lossless compression (PLLC) With degradation (Langevin) The compression rate of PLLC depend of the noise on the pixels of CCD So the commissioning period allow to define the size of limb PLTM and macro-pixels The perspective is to allow about 51 pixels of large for the diameter measurements

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 7 REPORT ABOUT SODISM SHUTTERS (Electronic point of view)

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 8 REPORT ABOUT SODISM SHUTTERS (Electronic point of view)

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 9 SODISM Filter wheels from 01/08 to 30/09 Pm : 2 steps correspond to 0.2 mm to 0.5 mm of movement on the filter Go and back to RAZ position Erreur de pas Roue Roue The requirement To have to steps or less of difference is respected Extract from a slide of M. Meissonnier (revue of end of Commissioning period)

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 10 When they are new requirements on the payload, the only possibility is to try to treat them, with the operational software 2 problems now 1) SOVAP: it become necessary to prevent all telecommand that close the right shutter 2) SOVAP : This requirement can becomes obsolete if need 3) SODISM : Necessity to have full images compressed by Langevin with filters helio Point 1 and 3 will be treated thanks to a new version of the software (planning max February 2011) Point 2 will be treated by a patch of the memory (very easy processes) UPDATE OF THE OPERATIONNEL FLIGHT SOFWARE