Market coupling for Baltic Cable Paul Giesbertz 5 th Stakeholder Group Meeting Northern Europe ERI 26 May 2010, Copenhagen.

Slides:



Advertisements
Similar presentations
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Advertisements

Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Copyright Nord Pool Spot AS © June 27, 2006Anders Plejdrup Houmøller1 The KONTEK bidding area Anders Plejdrup Houmøller General Manager Nord Pool Spot.
Towards Regional Independent Operators – a main driver for successful market integration.
Erik Rakhou - Energiekamer 19th Madrid Forum 22 March 2011 Amendment of the Guidelines of Good Practice for Storage System Operators - Capacity allocation.
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Stakeholder Group Meeting 26. May 2010 Action Plan of the Region 2010 Finn Dehlbæk.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
Energy Agency of the Republic of Serbia
Matti Supponen Electricity and Gas unit 3rd Internal Market package EUROPEAN COMMISSION EEF
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
Transmission Congestion Rights – Credit Perspective April 17, 2014.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Day ahead market coupling on German – Danish interconnectors Mr Finn Dehlbæk DERA, Denmark The Regional Initiatives: Progress and Prospects Conference.
COMMENTS TO THE SOUTH-WEST EUROPE ELECTRICITY REGIONAL ENERGY MARKET Draft detailed action plan version 1, 22 June 2007.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
All Island Single Electricity Market IWFA Update Laura Brien
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
ERGEG Northern Europe Regional Initiative – Welcome to Stakeholder meeting (”Miniforum”) 27th June 2006.
Nord Pool Spot update 11th Baltic Electricity Market Mini-Forum October 01, 2010 Hando Sutter, Nord Pool Spot AS.
1 Market coupling Commission de Régulation de l’Electricité et du Gaz Fonctionnement Technique des Marchés September 2010 Common CSE – CWE RCC Meeting.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
CASC.EU – Capacity Allocation Service Company CASC.EU SA 23/11/10CASC-EU S.A. (R)
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Europe Links 17 Power Markets as Spain, Portugal Set to Join Day-ahead power markets are set to be linked from Portugal to Finland as the European Union.
Congestion Management
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Market Architectures Integrating Ancillary Services from Distributed Energy Resources Olivier Devolder Head of Energy Group N-SIDE.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
IG meeting, December 5th, 2012, DERA premises, Copenhagen
IFA Market Coupling Update
ETSO Comments on the draft Congestion Management Guidelines
Regulators’ update on Congestion Management and Balancing
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Presentation transcript:

Market coupling for Baltic Cable Paul Giesbertz 5 th Stakeholder Group Meeting Northern Europe ERI 26 May 2010, Copenhagen

Contents –Past activities since 2008 –Status of Market Coupling Results of first days of market coupling How does it work Open issues on market coupling –Other issues

Past activities since 2008 –Baltic Cable AB has been ready to implement market coupling on voluntary basis since 2008 –Start of EMCC market coupling in 2008 was halted before Baltic Cable could join. Baltic Cable had a valid agreement with EMCC and was about to start market coupling as soon as the functionality was proven. –EMCC relaunched in Nov 2009 –Agreement Baltic Cable – EMCC for Market Coupling had to be renewed and was signed on 9 April –Market coupling started on May 10 (delivery date: May 11) with satisfactory results so far

Results day 1 (May 11) HourATC SE-DEATC DE-SEFlow SE-DEFlow DE-SEPrice spread No adverse flows (negative price spreads) Ramping constraint ATC is restricted by SvK

Results day 2 (May 12) HourATC SE-DEATC DE-SEFlow SE-DEFlow DE-SEPrice spread No adverse flows (negative price spreads) ATC is restricted by SvK Ramping constraint High flows (and losses) but no revenues

Results day 3 (May 13) HourATC SE-DEATC DE-SEFlow SE-DEFlow DE-SEPrice spread Some hours with adverse flows (negative price spreads)

Status of market coupling – How does it work? (1) –Baltic Cable is nominating capacity to EMCC each morning. The capacity is fully firm (financial consequences for Baltic Cable) even if capacity is curtailed by Transpower or in case of outage. –EMMC buys and sells at the power exchanges on behalf of Baltic Cable –Baltic Cable remains owner of capacity; EMCC makes market coupling available –Baltic Cable is balance responsible to TSOs –Baltic Cable buys power for losses

Status of market coupling – How does it work? (2) –Baltic Cable is part of the ”cut 2 optimisation” –Baltic Cable receives congestion rents minus fees to be paid to EMCC –Baltic Cable has option to stop market coupling directly if CWE-EMCC market coupling leads to improper market results –SvK will delete the variable transmission fee

Status of market coupling - Open issues for future (1) –Solutions for deadband (to avoid that costs of losses are higher than congestion rents) Market coupling started with a 0% deadband, but EMCC will introduce deadband ultimately –Capacity restrictions imposed by TSOs in intra- day domain (only German side) restrictions in intra-day domain have increased over last year. Baltic Cable might be forced to reduce capacity, anticipating possible restrictions by TransPower.

Status of market coupling - Open issues for future (2) –Technical limitations of Baltic Cable not yet fully modelled in market coupling process Minimum flow requirement of 60 MW Flow change limitations: max 560 MW after change of flow direction –Full detailled transparency of functioning of market coupling mechanism not assured due to Intellectual Property rights?

Other issues for future –Capacity restrictions imposed by TSOs SE-side: will hopefully improve as result of self commitments of SvK in EC-case DE-side: restrictions in intra-day domain have increased over last year. Our view is that current practice is in conflict with Art 1.7 of Congestion Management Guidelines. –Ramping constraint (600 MW/hour) Not clear whether these constraints are justified But, more importantly, if they are justified TSOs should solve them. –New merchant cables to Sweden seem to require dominant involvement of SvK Is this compliant with EU legislation?

Thank you!