Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at.

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
26 September 2000 High Voltage Plates and Capacitors Jack Fowler.
Hamamatsu Photonics K.K. Electron Tube Division R for ICECUBE 1.Delivery Record and Plan 2.Specification of R Test Result at Hamamatsu.
Antares/KM3NeT M. de Jong. neutrinos  p Scientific motivation: – origin cosmic rays – birth & composition relativistic jets – mechanism of cosmic particle.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
Electronic department Photonics-oriented data transmission network for the KM3NeT prototype detector Jelle Hogenbirk, Nikhef )* On behalf of the KM3NeT.
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
KM3NeT International Solvay Institutes 27  29 May 2015, Brussels, Belgium. Maarten de Jong Astro-particle and Oscillations Research with Cosmics in the.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
News from KM3NeT Uli Katz ECAP / Univ. Erlangen MANTS Meeting, Garching, October 2013.
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
The Trigger and Data Acquisition System for the KM3NeT neutrino telescope Carmelo Pellegrino Tommaso Chiarusi INFN - Sezione di Bologna VLVnT 2015 | Rome,
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
CLB meeting APC Tentative action/work list.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
Deployment Test Program P.Kooijman. Goal of tests Validation of the LOM deployment – Has had three previous tests – First included rudimentary cable –
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.
The Neutrino Telescope of the KM3NeT Deep-Sea Research Infrastructure Robert Lahmann for the KM3NeT Consortium Erlangen Centre for Astroparticle Physics.
Status report Els de Wolf Annual Meeting 2011, Nikhef.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Update on general technology From DOM electronics to KM3NeT subsea infra structure Interaction with other scientific projects Interaction with industries.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
KM3NeT Neutrino conference 2-7 June 2014, Boston, U.S.A. Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino telescope in.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
CEA Saclay – Institute of research into the fundamental laws of the Universe PPM DU Pre Production Model Detection Unit Status and plans Th. Stolarczyk.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
Multi-PMT DOM P.Kooijman University of Amsterdam-GRAPPA Presentation for SSC.
PPM 30/10/2012. In-situ validation programme Oct/Nov 2012: VEOC prototype in Atlantic (monitor fibres, pressure) Dec(?) 2012: multi-PMT.
DOM & DU tendering and assembly
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Status Optical System KM3NeT
DOM acceptance and calibration
On behalf of Patrick Lamare
Characterization of the ETEL and HZC 3+ inch PMTs
PPM: Description of the KM3NeT network by WP H
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
DOM integration meeting
Els de Wolf, Nikhef/UvA KM3NeT WP345-meeting 23 February 2009
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
Els de Wolf 20 February 2012, Catania
P.Kooijman, Nikhef KM3NeT, General Meeting, 20 February, Catania
miniDOM report Vlad Popa
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
PPM-DOM. SPM DOM LCM SS-part ILxx
Teacher name August phone: Enter text here.
Tropical cyclones movement
Change Tested or Implemented
2015 January February March April May June July August September
Presentation transcript:

Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at NIOZ PPM-DU – DOM 1 and 2 – VEOCs – DWDM components – shore station KM3NeT phase-1 – CLB – DWDM network, components – REAM specifications Actie punten AoB

PMT deliveries ETEL – October 5D79310 – November 3D79212 Hamamatsu – July1010 (6 -> Erlangen) – August1515 – September2525 (20 -> Erlangen) – October50 – November100

Feedback P. Lamare pressure test PPM-DOM – confirmed consequences of no spare PPM-DOM transport shore station to Foselev and/or IMP – Saclay will take care of installation (B. Vallage) – requested phone support from Nikhef evaluation of PPM-DOM – considers pre-evaluation of PPM-DOM (i.e. prior to deployment) fibre specifications for MEOC – will contact Alcatel for recommendations/options

Actie punten (11/10/2012) design specifications optical network / VEOC contact ETEL delivery PMTs (mjg) purchase DWDM components (EDFAs) for PPM-DU (Sander) check broadcast compatibility met CLB prototypes (Tasos  Saclay) evaluation of PPM-DOM (mjg  P. Lamare) PMT tests for PPM-DU (Paul K.) HV paint procedure (Ad B.) REAM specifications (Sander, Gerard,...) Fibre specifications MEOC Toulon (mjg  P. Lamare)

Actie punten (18/10/2012) Verify gain measurement Dark count measured at specified gain (i.e. not recommended HV) check gel thickness check mass of DOM put stretch results/theory on paper, Paul K. creep report to agenda, Eric order dyneema DM20 ropes (>> km), Edward PPM-DU meeting at Nikhef check NL shore station compatibility with PPM-DU, Tasos order 50 glass spheres, Patrick REAM specifications to CIP, Sander