Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.

Slides:



Advertisements
Similar presentations
22 settembre 2004A. Annovi1 SVT upgrade status A. Annovi - Assisi, 22 settembre 2004.
Advertisements

The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
FTK poster F. Crescioli Alberto Annovi
June 19, Outcome of the CERN meetings Preparing the upgrade R&D proposal M. Shochet.
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
MICE CMPB Alain Blondel 1 Highlights on MICE.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
FP7-People-IAPP-2012 FTK - Project number: Paola Giannetti – INFN & University of Pisa 1 st EU Mid-Term Review meeting Brussels, November 7 th,
OUTLINE (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific.
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Associative Memory design for the Fast Track processor (FTK) at Atlas I.Sacco (Scuola Superiore Sant’Anna) On behalf Amchip04 project (A. Annovi, M. Beretta,
IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
Status of FTK Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Fabruary 2, 2010 Status & Evolution of FTK (impact on Italian groups) Schedule.
Global Costs based on TP (6-10 y): ~1150 K€ Italy ~1150 K€ USA ~200 K€ Waseda ~300+ extra K€ new institutions Costs for 2013 run ~400 K€ Italy ~500 K€
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
Paola TDAQ FTK STATUS (valid for both Option A & B) Paola Giannetti for the FTK collaboration  Work done for each milestone since the TDAQ.
IAPP - FTK workshop – Pisa march, 2013 Marco Piendibene – University of Pisa & INFN FTK and the AM system.
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Status of FTK Paola Giannetti INFN Pisa for the FTK Group ATLAS Italia November 17, 2009.
Costo ~ 600 kE ATLAS: Frascati, Milano, Pavia, Pisa CMS: Firenze, Padova, Perugia, Pisa, Trieste Applicazioni: FTK Phase II, L1 Track Trigger, outside.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
AMBFTK Report AMBFTK: problems to solve Power distribution: Crates – compatibility with CDF crates? Thermal dissipation: Cooling Signals I/O:
New AMchip features Alberto Annovi INFN Frascati.
The AMchip on the AMBoard Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa.
UPDATE ON HARDWARE 1 1.VERTICAL SLICE & COOLING TESTS 1.ONLY a TEST STAND or a SMALL DEMONSTRATOR ?? 2.CRATE.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Outline The Pattern Matching and the Associative Memory (AM)
Firmware development for the AM Board
Federico Lasagni Manghi - University of Bologna
IAPP - FTK workshop – Pisa march, 2013
T-simulation OUTLINE Inputs to the T-simulation: chips, boards, crate mechanics and fan T-simulation performed into two steps: On large scale: simple AM.
FTK: update on progress, problems, need
Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa
The Associative Memory – AM = Bingo
FTK Update Approved by TDAQ in april
LAMB: Hardware & Firmware
FTK infrastructure in USA15 Status and plans for 2015 A
Project definition and organization milestones & work-plan
Milano Activities: an update Mauro Citterio On behalf of INFN Milano
Cost &Personnel Estimates Project Organization
Summary of Deliverables & reached Milestones
AM system Status & Racks/crates issues
* Initialization (power-up, run)
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
Pending technical issues and plans to address and solve
T1 Electronic status Conclusions Electronics Cards:
Meeting at CERN March 2011.
Secondments & tasks Management meetings – Calendar
DT Infrastructure: LV, HV, Gas
FTK variable resolution pattern banks
Report on Working Group # 2 The MU2E detector
KICK OFF meeting - project presentation
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with tested prototypes June 2013 University of Geneva joined FTK. Integration/commis./LAMB project LPNHE and University of Tessaloniki show interest – will sign IMOU Heidelberg got few funds (25 keuros x 4 years)- will sign the IMOU FTK IAPP project - manpower support CAEN & PRISMA ELECTRONINCS joining with IAPP

DONE January 2012 As much as possible with 8 PUs September 2012

MILESTONEs Patterns firing MHz Consumption ok, refined measurements ongoing Yield measurement ongoing, seems good – 100% expected at 30/09 During the September Technical Stop the VS will be Installed at Point 1. Data taking expected in Novemeber 100% expected at 31/12

AMCHIP04 big Jump in technology! (LNF, Pisa, Milano + ideas from USA) 4 65 nm mm 3.31 mm 64 patterns= 2 full custum cells Annovi, Beretta, Crescioli, Liberali, Sacco, Stabile, Hoff Consumption & perfomances OK Yield under Measurement NEW AMCHIP Next step: 32 kpatt instead of 8kp Serial links New package Flip BGA

AMBoard generations & tests 5 Old – CDF like 64 AMchips New – 128 AMchips 6 48 Volts 270 V 5V/ 345A, 3,3V/115A, 48V /81A, Final crate – Wiener AMBslim5 for standard test stands AMBslim5++ for cooling tests NEW:AMBFTK for 2015 (PI-MI) Under test in Pisa LAMBFTK to be assembled (PG-PI-PV) PI-PV

VERTICAL 1 for TDAQ Integration tests – all involved 2013

Cooling first, point 1 after 7 5V/ 345A, 3,3V/115A, 48V /81A, Final crate – Wiener versus CDF crate arrived from Fermilab PI-PV Wiener Crate CDF Crate Powerful 1U FAN We will put in the crate AMBoard+EDro together with boards full of resistors able to sink current Fermilab 2013

8 Integration, tests[Italy-Japan-USA]: AMBFTK + FTK_IM + [AUXFTK + DF + FLIC + …. From USA] Proto AMBoard Proto AUX The Processing Unit (PU) project The reality: AMBFTK + ProtoAUX in the crate today Proto-PU 2014: 10 AMBFTK+ 40 LAMBFTK

Summary 9 Milano: 5 k€ TS + AMchip05, 200 k€200 SJ su Pisa Pisa: 10 k€ new AMBFTK + 10 SJ CUT 7+7 SJ Pavia: 20 k€: LAMBFTK (small prod) + Test board LAMB CUT 7+7 SJ LNF: 20 k€ FTK_IM CUT 7+7 SJ Bologna: 5 k€ (spese di laboratorio) Tot: 260 keuro + 10 SJ SJ DIMENTICATI

Conclusions 10 We are working hard for both the Final FTK & the intermediate versions (vertical slice and demonstrator) First prototypes (chip and boards) under tests. the AMchip seems ok. the vertical slice plan has been reduced (LHC schedule). the TDR in 2013 should start final approvals A demonstrator expected in 2015, production will start after.