1 Harmonised Allocation Rules in EU ETS as from 2013 General introduction and overview of NIM process DG CLIMA Unit B.2. European Commission Member State.

Slides:



Advertisements
Similar presentations
European Commission: DG Environment Monitoring, Reporting and Verification in the EU ETS: Status and Implementation Stakeholder Day on the EU MRG Cologne.
Advertisements

December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
WTO Compatibility of «Green Border Taxes» Dr. Joëlle de Sépibus World Trade Institute, Bern.
Introduction to Article 45 (5) of the CLP Regulation
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
The EU Emission Trading System (ETS) Henriëtte Bersee Henriëtte Bersee Environment Counselor Environment Counselor Royal Netherlands Embassy Royal Netherlands.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
Session 5 :E-PRTR (EU-ETS) QUALITY CONTROL/QUALITY ASSESSMENT Iksan van der Putte.
The EU Emissions Trading System (ETS) Rationale and Lessons learnt Artur Runge-Metzger Head of International Climate Negotiations, European Commission.
PRME Seminar “Responsible Management of GHG Emissions” Fri 14 October 2011 Gujji Muthuswamy Department of Management Faculty of Business and Economics.
Understanding the proposed revision of the EU ETS Thomas Bernheim DG Environment Unit C.2 European Commission.
1 Decarbonsing the European Power Sector: is there a role for the EU ETS? Brussels, 31 May 2011 Jos Delbeke DG Climate Action European Commission.
European Commission Enterprise and Industry Market surveillance and automotive type-approval legislation - 28/06/2012 | ‹#› WP.29 Enforcement Working Group.
Lessons learned from EU Emissions Trading Scheme (ETS)
Phase III of the EU Emissions Trading System (EU ETS)
PROCUREMENT OVERSIGHT AND MONITORING – A MEANS FOR EFFECTIVE PROJECT IMPLEMENTATION 11 th PUBLIC PROCUREMENT KNOWLEDGE EXCHANGE FORUM June, 9-12, 2015.
Data interaction between the National Emission Inventory and EU ETS in Ireland Workshop on data consistency between National GHG inventories and Annual.
IPPC Directive state of play and future developements
Market Mechanisms to Curb Greenhouse Gases: Challenges and Future Directions Joe Kruger February 20, 2007 Joe Kruger February 20, 2007.
The implementation status of specific mechanisms under Kyoto Protocol EU-ETS 13 May 2013 Geta Diaconu.
Lessons from implementing the EU Emission Trading System DG Environment European Commission Side event 2009 Climate Change.
1 EU Emissions Trading Scheme – New System to allocate free Allowances from 2013 onwards IFIEC Energy Forum Brussels, 9 June 2011 Hans Bergman DG Climate.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
Regional Policy Major Projects in Cohesion Policy Major Projects Team, Unit G.1 Smart and Sustainable Growth Competence Centre, DG Regional and Urban Policy.
IFIEC EUROPE – International Federation of Industrial Energy Consumers 1 Climate Change Policy as Today’s Driver for Energy Policy Annette Loske, IFIEC.
-EU Climate and Energy Package- Mihai Tomescu Policy Officer, Unit ‘Energy and Environment’ Directorate-General Environment European Commission Enabling.
1 EUROPEAN COMMISSION CLIMATE CHANGE UNIT European Climate Change Programme: legislative action fluorinated gases Phil Callaghan European Commission DG.
EXECUTIVE ROUNDTABLE SERIES Aviation in the EU Emission Trading Scheme Sophie Hagège, M&A Partner June 3, 2010 KEY LEGAL CONSIDERATIONS GOVERNING THE NEXT.
Presentation “Green Investment Schemes – greenhouse gas emissions quotas trading mechanisms in Ukraine according to the Kyoto Protocol to the Convention.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
1 EUROPEAN COMMISSION CLIMATE CHANGE UNIT Meeting the Challenges of the Climate Change Programme Marianne WENNING European Commission DG ENV.E.1.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
Climate and Energy Package Open Days 2008 Workshop “ Climate change and the role of regions“ 7 October 2008 Martin Weiss European Commission DG ENV, unit.
12 June 2007 Aviation Emissions ETG submission to DEFRA Presentation of Draft Submission WG5/6 – 12 June 2007.
Climate Action Lessons from the ESD compliance cycle and its flexibility mechanisms: Current state of discussions Jürgen Salay European Commission, DG.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
1 Eurostat’s grant policy for 2010 Luxembourg, 23/03/2010 Unit A4 – Financial Management Section 3 – Grant procedures and agreements.
The EU Emissions Trading Scheme and its review Thomas Bernheim DG Environment, unit C.2 European Commission.
EU Emissions Trading. Context European Climate Change Programme (ECCP) European Climate Change Programme (ECCP) Directive on Greenhouse Gas Emissions.
January 20, 2006Rod Janssen EC Green Paper on Energy Efficiency Rod Janssen Energy Consultant.
Climate Action Meeting the EU’s Kyoto commitments & Avoiding a gap after 2012 Doha, 27 November 2012 Paolo CARIDI Policy Coordinator DG Climate Action.
Directive on the Authorisation of electronic communications networks & Services Directive (2002/20/EC) Authorisation Directive Presented by: Nelisa Gwele.
ETS POST REVISION THE LIME SECTOR Ms. Eleni Despotou EuLA Secretray General.
Financial Management of Rural Development Programmes DG AGRI, October 2005.
Climate Change October Main concepts Climate change – lasting change of some or all characteristics, describing the average weather condition Greenhouse.
1 European GHG emissions and the EU ETS Dr. Andreas Barkman Project manager GHG emissions and emission trading European Environment Agency.
The New Legislative Framework
WG 5/6 sub-group on Benchmarking ETG Draft Position Paper Benchmarking as an allocation methodology 14 May 2007 Jim Rushworth.
Land Use, Land Use Change and Forestry (LULUCF) European Commission expert group on forest fires Antalya, 26 April 2012 Ernst Schulte, DG ENV on behalf.
EU ETS Phase III – Monitoring, Reporting & Verification Andy Taylor Global Product Manager EU ETS.
EU Regulation on type-approval of hydrogen vehicles HFCV GTR – 4th SGS meeting Tokyo, Japan, September 2008 Ferenc PEKÁR Automotive Industry Unit.
June 2009 Regulation on pesticide statistics Pierre NADIN ESTAT E1- Farms, agro-environment and rural development
The EU ETS and the Modernisation Fund: European Power sector’s perspective Krzysztof Laskowski Climate Policy Advisor, EURELECTRIC Brussels, 4 May 2016.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
0 Allocation in phase 3 of EU ETS Case study: integrated pulp and paper mill.
ETS Post 2020 The view of Italian steel industry on carbon leakage Flavio Bregant Director General EPP ENVI/ITRE Hearing on ETS Post 2020 Bruxelles, 4.
0 Allocation in phase 3 of EU ETS Case study: integrated steel mill.
EUETS Allowance Auctioning Phase II EUETS Allowance Auctioning in the UK Lee Oliver Workshop on EU Emission Trading Scheme – Monitoring, Reporting and.
The failure of IA in the Council- case of the climate change package Malgorzata Kaluzynska Office of the Committee for European Integration.
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
EU’s CO2 Emissions Trading Scheme – Benchmarks for Free Allocation from 2013 Onwards 9 September 2010 Hans Bergman DG Climate Action European Commission.
Phase III of the EU Emissions Trading System (EU ETS)
Recent Cap and Trade Programs: EU ETS and RGGI
EU Reference Centres for Animal Welfare
The revision of the EU Emissions Trading System for phase 4 and the implementation process Stakeholder Meeting on the Preliminary Carbon Leakage List for.
SCP in the 7th Environmental Action Programme
Pedro Cruz Yábar Brussels, 21st June 2016
EU plan: Supporting directives • The EU Renewable Energy Directive was adopted at the end of 2008 • EU Renewable Energy Directive.
Carbon Leakage List – Methodology for the Quantitative Assessment
Presentation transcript:

1 Harmonised Allocation Rules in EU ETS as from 2013 General introduction and overview of NIM process DG CLIMA Unit B.2. European Commission Member State Workshops Zagreb, January 2012

2 Content 1.Climate and Energy Package 2.Key elements of the EU ETS 3.Overview of ETS implementation activities 4.Harmonised allocation rules 3rd trading period 5.Current activities and NIM process 6.Exclusion of small installations under Art. 27

3 Climate and energy package 5 June 2009: Publication in OJ L 140 of (inter alia): Directive 2009/29/EC amending directive 2003/87/EC (Review ETS) Decision No 406/2009/EC on the effort of MS to reduce their GHG emissions to meet the Community’s GHG reduction commitments up to 2020 Directive 2009/28/CE: absolute target +20% renewables gross energy consumption in EU

4 4 GHG Target: -20% compared to % compared to 2005 EU ETS -21% compared to 2005 Non ETS sectors -10% compared to Member State targets, stretching from -20% to +20%

5 Key elements of EU ETS The biggest cap&trade system Started in 2005 Abating emissions or buying emissions allowances? Reference periods: , , , … The compliance cycle: annual monitoring and reporting of emissions, verification of reported emissions and surrendering of allowances on the Registry

6 6 EU-wide cap Scope: extension & other adjustments (Annex I) Auctioning as the basic allocation method Transitional harmonised allocation rules (‘CIMs’) with “benchmarking” as reference Key elements of EU ETS

7 7 Free allocation NER for stationary installations If applicable, surplus Art 10a5 - only stationar installations - proportions shown are arbitrary - LRF to be reviewed by 2025 Auctioning NER300 EU-wide cap

8 8 Scope in : Sectors/activities: Power sector, energy intensive industry (iron and steel making, cement, lime, ceramics, pulp&paper, glass) Gas: CO2, opt-in di N2O Extended scope as from 2013: New sectors: Aluminium, bulk chemicals, aviation (as from 2012) New gases : PFC from aluminium production, N2O from the production of chemicals Possible inclusion of the maritime in case no agreement within the International Maritime Organization Scope

9 9 Auctioning is the basic allocation method – 100% auctioning for the power sector as from 2013 Phasing out of free allocation for industry based on benchmark: 80% free in 2013 – 30% free in 2020 – 0% free in 2027, unless… …sectors deemed to be exposed to carbon leakage risk, in this case the allocation is the 100% of the allocation calculated on the basis of the BM Harmonised allocation method

10 3 on ‘allocation of allowances’ Commission Decision 2011/278/EU published in the OJ on 17/05/2011 Assessment of the applications for specific rules for transitional free allocation for the modernisation of electricity generation (Art. 10c) Assessment of the NIMs for stationary installations Assessment of notifications under Art. 27 for the exclusion of small emitters Overview of ETS implementation activities

11 ‘monitoring & reporting’ & ‘verification & accreditation’ Regulations on M&R and A&V voted in Climate Change Committee in December 2011 Scrutiny procedure started in EP and Council  3 months and then adoption Concerning M&R: no major changes compared to Commission Decision 2007/589/EC Data collection in accordance with M&R rules and principles set in the decision Overview of ETS implementation activities

12 Auctioning Regulation n. 1031/2010 adopted on 12 November 2010 amended by Commission Regulation (Eu) No 1210/2011 defining the amount of allowances for early auctions A common auction platform for 20+ Member States option for Member States to set up own auction platform Simple auction format Predictable auction calendar Adequate oversight: a single auction monitor, solid know-your-customer checks and provisions to mitigate risk of market abuse Overview of ETS implementation activities

13 on ‘carbon leakage’ ‘direct CL’: end 2009 decision determining (sub)sectors deemed to be exposed to significant risk of carbon leakage (amended in 2011 (*)) ‘indirect CL’: public consultation( ** ) on rules of state aid in favour of (sub)sectors exposed to significant risk of carbon leakage due to costs relating to GHG emissions passed on in electricity prices. Public consultation closing by 31/01/2012 (*) (**) Overview of ETS implementation activities

14 Harmonised allocation rules – benchmarking for free allocation Benchmark = X Allowances per unit of product produced Benchmark x historical production = allocation A benchmark does not represent a physical emission limit or a target to reach Operators are allowed to buy allowances if necessary or reduce emissions, financing such reductions by selling the saved allowances

15 __ ____15/12/2010______2011______30/09/2011_____……28/02/2013 Developing CIMs CCC vote on the CIMs NIMs develop ment NIMs submissi on & approval Issuance of free allowances to installations Current activities and NIM process

16 Member State perspective 1. Setting up the legal basis for data collection&verification 2. Identification of incumbent installations (Guidance on interpretation of the annex 1 activities(*)) 3. Collecting data 4. Calculating preliminary allocations Advisable: consultation phase with operators 5. Submitting the NIMs to the Commission for assessment (*) Current activities and NIM process

17 1.NIMs assessment (DG CLIMA) 2.Completeness checks of NIMs lists & methodology reports, NIMs tables 3.Compliance checks of NIMs list & methodology reports (correct application of rules, plausibility checks, etc.) 4.Decision on the NIM Current activities and NIM process

18 NIMs process: Assessment phase Submission Completeness check Compliance check positive Decision on non-rejection Decision on rejection if necessary positive if necessary negative

19 DG Clima’s tasks and activitiesMember States’ tasks and activities Acceptance/rejection of the NIM list at installation level. Legal form to be decided. After notification by all MS the Commission determines the CSCF Uploading the table in the common Registry Receiving EC Decision on the NIM Calculating final allocation to installations with the application of the CSCF Submitting the final table to the Registry (also requirement foreseen in the forthcoming Registry regulation) Current activities and NIM process

20 Installations subject to the provisions under Article 27: ‘Installations which have reported to the competent authority emissions of less than tonnes of carbon dioxide equivalent and, where they carry out combustion activities, have a rated thermal input below 35MW,[…], and which are subject to measures that will achieve an equivalent contribution to emission reductions’ ‘Hospitals[*] may also be excluded if they undertake equivalent measures’ Main purpose of exclusion (Recital 11 of the revised ETS Directive): “This threshold offers the maximum gain, in relative terms, of reduction of administrative costs for each tonne of CO2 equivalent excluded from the system, for reasons of administrative simplicity. [*] For a definition see Guidance on Interpretation of Annex I of the EU ETS Directive endorsed by CCC on 18 March 2010 Exclusion of small installations

21 Any measure adopted at national level shall be in line with the following 'cornerstones', which represent the main criteria for the assessment of the relevant notification under Article 27: Reducing administrative burden for the operators Following Recital 11 of the revised ETS directive, the main aim of equivalent measure under Article 27 should be the reduction of administrative burden for the operators. Possible examples: simplification in the permitting procedures (i.e. number and cases in which a permit needs to be updated) or measures whereby capacity increases/decreases do not need to be taken into account, or simplified verification requirements. Exclusion of small installations

22 …'cornerstones‘ Equivalent contribution to emissions reductions Additional: Member States will have to substantiate that the proposed measure(s) is(are) additional; in case a measure would also apply to the installation if it remained under the EU ETS, it cannot qualify as equivalent; At installation level: the measure(s) shall be applicable and applied at installation level Consistent with the principles of the ETS Directive: the equivalent measure shall be consistent with the Directive's overall objective. Not entailing distortions of competition introducing different costs per ton of CO2 emitted above the relevant benchmark level (the carbon leakage exposure status of the sub- installations of the installation concerned needs to be taken into account) Exclusion of small installations

23 non-paper distributed to the Member States after the WG3, giving an example of equivalent measure In order to allow for a proper assessment of the notification, Member States should notify together with the list of installations the national legislation that will apply to the excluded installation, in particular the acts setting out the equivalent measures, and thus supporting the exclusion Exclusion of small installations

24