CMS CB, 22 June 20071 CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June 2007 1.CMS Centre Status 2.New offices.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

Consoles and Hardware Status Erik Gottschalk. Overview Consoles will be installed Dec. 19 & 20 Network installation will begin Dec. 11 Installation of.
EClassroom Standards The University of West Florida.
LHCbComputing LHCb Computing Tasks. December Status of Computing Personnel m Currently available people insufficient to cover all activities o Estimate.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
1 CMS Education and Outreach Dave Barney & Lucas Taylor.
L. Taylor 2 March CMS Centres Worldwide See paper (attached to agenda) “How to create a CMS My Institute” which addresses the questions:
High Definition Videoconferencing for High Energy Physics, Erik Gottschalk 1 High Definition Videoconferencing for High Energy Physics Erik Gottschalk.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
US CMS Collaboration Meeting: April 7-8, LHC Remote Operations Center Erik Gottschalk Fermilab.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Brochure: Lucas Taylor CHEP 2009, Prague1CMS Centres Worldwide : A New Collaborative.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
CCC status report 14/12/2004D.Manglunki AB/OP 1 Status of the CERN Control Centre D. Manglunki AB/OP.
Steven Goldfarb LCG RTAG 12 CERN – 1 June 2004 LCG RTAG 12: Collaborative Tools Interim Report.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Steven Goldfarb Shaping Collaboration 2006 CICG, Geneva - 11 Dec 2006 LCG RTAG 12: The Collaborative Tool Needs of the LHC.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
CERN - IT Department CH-1211 Genève 23 Switzerland t Status of Collaborative Tools at CERN 13th June 2007 Tim Smith IT/UDS.
1 Collaborative CERN: Tim Smith Status of Collaborative Tools at CERN Shaping Collaboration 11 th December 2006 Tim Smith CERN/IT.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Lucas Taylor LHC Grid Fest CERN 3 rd Oct Collaborating at a distance 1 Collaborating at a Distance Lucas Taylor ▪ LHC Grid Fest ▪ 3 Oct 2008 ▪ CERN.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
Summary Collaborative tools track Eva Hladká Masaryk University & CESNET Czech Republic.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
R. Bailey, PS/SPS days, January 2005 Towards the CCC.
CERN: Plans to the future Joao Fernandes IT-UDS-AVC.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
The ATLAS Collaborative Tool Project A broad overview.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
DJ: WLCG CB – 25 January WLCG Overview Board Activities in the first year Full details (reports/overheads/minutes) are at:
EVM: 28 th June, Jurgen De Jonghe Collaborative Project Progress Tracking and Earned Value Management Jurgen De Jonghe IT-AIS
ATLAS M&O A: Collaborative Tools S. Goldfarb (5 June 2013)
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Status of Collaborative Tools at CERN LHC RRB Scrutiny Group 31 st August 2006 Tim Smith IT/UDS.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
Your-own-afs-password CMS Centre CMS System Login: Password: N.B. you must.
D.Manglunki - AB/OP CCC Ergonomics D.Manglunki - AB/OP.
Visit to CERN/CMS Jan 2006 Patricia McBride Fermilab Slides taken from presentations by Hans Hoffmann and Werner Jank.
Console Status Erik Gottschalk. Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
CMS Centre Project - Green Light Meeting
News and Introduction from CERN June 15th, 2005
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
East Area Renovation Project Team meeting # 2 – EDMS News
CMS Centres for Control, Monitoring, Offline Operations and Analysis
LIU Wire Scanner Milestones June 2017
CLIC / ILC Collaboration for CFS works
CMS Centres Worldwide CMS Centres Worldwide
Background B513 built in early 1970’s for mainframe era.
Mandate First draft plan is attached to agenda -- please give feedback
RWTCS Steering Commitee
A very first look at siting issues
CMS Centres for Control, Monitoring, Offline Operations and Analysis
Extension SR1 WP3 Electrical installations
Presentation transcript:

CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices in PS area 3.Video-conferencing

CMS CB, 22 June 2007 Lucas Taylor 2 Requirements Phase (Jan – Mar ’07 - see last CMS Week) CMS Centre” RTAG CMS NOTE / 010 Functions and requirements –Offline DQM, calibration, rapid analysis… –Computing operations –Communication with P5 Control Room, other remote centres Since last CMS Week –detailed technical studies –design work –project plans, costs… CMS Centre Vision Similar concepts 24 consoles Meeting rooms Office space FNAL Already operational

CMS CB, 22 June 2007 Lucas Taylor 3 Technical Design Phase (Apr-May ’07 - baseline planning) Radiation –AB / SC: measured PS stray radiation, simulations –PS reconfigured, backup plan (concrete) Safety Commission Inspections –Measurements, evaluation of regulatory compliance –Fire safety, lighting levels, noise, temperature, air- conditioning, ventilation, –Ergonomic assessments - layout, workstations, furniture.. Acoustics –Measurements & simulations by external consultants

CMS CB, 22 June 2007 Lucas Taylor 4 Technical Design Phase (Apr-May ’07 - baseline planning) Taking account of these studies + experience of others… –CERN Control Centre (CCC) – also for CMS so aim to be consistent –Erich Keller AG – control room construction company …designed the “CMS Centre” and associated needs for technical services –Electrics, air-conditioning, networks, telephones… –Refurbishment / civil eng. - floors, ceilings, doors … –Explored alternatives to minimize costs HVAC options, cheaper materials, simpler consoles… Thanks to CERN / TS and AB, IT, PH, SC and FNAL

CMS CB, 22 June 2007 Lucas Taylor 5 buildings 6,8,9 Projector CMS Centre Office Projector 1m x 2m1m x 2ms1m x 2m Corridor width: 1.4 m Corridor width: 1.2 m Width from pillar to console: 0.5 m Projector Meeting Room (AB) Rest area / kitchen Outreach 26.0 m Corridor width: 1.2 m Office / Small Meeting Room Office / Small Meeting Room 11.4 m Meeting Room (CMS) Technical Design Phase (Apr-May ’07 - baseline planning) Main room 25 – 40 people ~same size as basketball court Meeting room: 40 people Meeting room: 20 people

CMS CB, 22 June 2007 Lucas Taylor 6 Projector 1m x 2m1m x 2ms1m x 2m Corridor width: 1.4 m Corridor width: 1.2 m Width from pillar to console: 0.5 m Projector 26.0 m Corridor width: 1.2 m 24 Operations / Monitoring Consoles Technical Design Phase (Apr-May ’07 - baseline planning) 2-3 screens for interactive work Services cabinet PCs, cables, ventilation 2-3 monitoring screens (e.g. displays from Control Room) CERN Control Centre

CMS CB, 22 June 2007 Lucas Taylor 7 Baseline Plan Green Light Review - 18th Jun ‘07 Assessed scope (WBS) and costs Agreed how to proceed –budget authorization for TS Dept –Project management and control Technical work starts next week From CMS S. CittolinTriDAS PM M. Della NegraEx spokesman M. KasemannComputing PM P. McBrideComputing PM A. PetrilliResource Manager D. SticklandControl Room PM L. TaylorCMS Centre PM From TS Dept. M. NonisHead TS-FM Y. BodyCooling, Ventilation A. FavreElectrical

CMS CB, 22 June 2007 Lucas Taylor 8 Installation & Commissioning (Jul ‘07 – Mar ‘08) Requirements defined (RTAG)Mar 07 Technical evaluation / design studiesMar–Jun Baseline plan completeJun –WBS, schedule, costs “Green Light Review”Jun Technical Service InstallationJul–Nov IT systems installationNov–Dec Commissioning of applications Jan–Feb 08 CMS Centre ready for LHC data-takingMar 08 –Currently we are ~ 2 weeks ahead of original schedule

CMS CB, 22 June 2007 Lucas Taylor 9 New Office Space in the PS Area

CMS CB, 22 June 2007 Lucas Taylor 10 Video- and Phone-Conferencing CERN Meeting Rooms –Completed a technical assessment of CMS rooms 40: S2-A01, S2-B01, R-A-10, R-B10, 2-A01, 5-A01 PS Area: , , ; P5 / SCX5, 28-S-029 –Full phone/video system in all rooms: ~ 500 kCHF –Decide priorities B40 auditorium, new room(s) in PS area … ? Some smaller rooms fitted for phone-conf only EVO now in production: –Groups please try it (VRVS support to early 2008)

CMS CB, 22 June 2007 Lucas Taylor 11 Video- and Phone-Conferencing Support At CERN: IT-UDS has made new proposal for support –In spirit of LCG recommendations of RTAG12 –Installation / management of equipment (we purchase) –Integration and on-call support of rooms / systems VRVS / EVO and H.323 (ECS / HERMES) –Phone-conferencing service – is still evolving –Integration with InDiCo: real / virtual room booking, click to launch collaborative tools, event archiving… General EVO support –Assess any remaining EVO development effort required to satisfy CMS needs and level of operational support –Propose a small technical advisory group Together with ATLAS, CERN, external experts … Priorities, compromises, alternatives?…and their costs –Aim for clear LHC-wide approach and funding model

CMS CB, 22 June Q & A 1.CMS Centre Status 2.New offices in PS area 3.Video-conferencing