KALABAGH DAM PROJECT General Reservations of Provinces on KBD Feasibility PROJECT BY RABIA RASHEED SHEHRBANO AKBAR ZIL-E-HUMA AKBAR.

Slides:



Advertisements
Similar presentations
River Regulation / Dam Construction – Effects on Rivers and Streams.
Advertisements

John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
Kansas Westward Water Transportation: Setting the Stage Presented by: Mark Rude August 1, 2014 Kansas Water Congress.
Water for Nature in the Downstream Areas DR. BASHIR AHMAD.
COMPARISON BETWEEN BHASHA AND KALABAGH DAMS By Engr. Amjad Hussain Malik Chairman Institution of Engineers, Pakistan (IEP)
Selection of Capacity Selection of capacity depends on: Physical characteristics Physical characteristics Inflow outflow characteristics Inflow outflow.
Long Term Storage Long term storage means to store water during high inflows years for the benefit of low inflows years. Long term storage means to store.
PRESENTATION ON MANGLA DAM MADE BY: SYED ALI ZULQADAR. ROLL NO: 37.MAJOR: SES 5 th.
Merowe Dam: Details of Site & Engineering Design Suzanne Young February 19, 2004.
Survey of Existing Dams Environmental Engineering Clinic Week 2 - February 13, 2004 Teresa Yamana.
INDUS RIVER SYSTEM AUTHORITY (IRSA) “Inter Provincial Water Distribution and the Need for Reservoirs” Rao Irshad Ali Khan Member IRSA Punjab December.
California Water Issues and Wetlands
From last lesson…. Name 2+ countries/areas of the world with: Little or no water scarcity Physical water scarcity Approaching physical water scarcity Economic.
Water in California: Self-induced Scarcity Waterscape International Group.
Andrew Scanlon Environment and Sustainability Manager Hydro Tasmania Drought and Climate Change.
LT: I can explain positive and negative impacts of building a dam.
Hydropower Dams © The GlobalEd 2 Project Photo credit: Noodle snacks, Wikimedia Gordan Dam, a dammed hydro facility in Tasmania.
By: Alizar Rizvi Fatima Raza VIII-A. Mangla Dam is located on the Jhelum river. Kashmir, Pakistan. It is the 16th largest dam in the world. It was built.
Water Scenario of PAkistan
Three Gorges Project: A Project of the Century By: Xinyu Huang.
INDUS RIVER SYSTEM AUTHORITY (IRSA) “Water Apportionment Accord 1991, Indus River System Authority”
GCSE Geography Year 10. UNIT 2 WATER, LANDFORMS & PEOPLE.
Geography of Ancient Egypt
Dams Mehmet Özger (Barajlar) Department of Civil Engineering, I.T.U.
By Prof.Dr Engr.S.M.Bhutta
We Are Misusing Our Freshwater Earth’s surface is 71% saltwater Water is necessary for life, food, and shelter Global Health Issue – lack of water.
Prof. Dr. Engr. S.M. Bhutta.  Energy the lifeline of, industrial economic, development and quality of life.  Pakistan is the poorest of the poor as.
Neotech Institute of technology Department of Civil Engineering
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
Chapter 21: How We Obtain and Use Water. Water To understand water, we must understand its characteristics, and roles: –Water has a high capacity to absorb.
Presented by:- 21. Kunal Kaklij. 22. Ritesh Kedare. 23. Kuldeep Kharjul. 24. Salman Khatik.
The Three Gorges Dam IB SL. Hydroelectric Power A dam is built to trap water, usually in a valley where there is an existing lake. Water is allowed to.
Sediment Issues within Transboundary Basins Presented by Paul Bireta and Fernando Salas April 12, 2012.
Water Use and Management Chapter 11, Section 2. Global Water Use Three types of major uses of water –1. Residential use –2. Industrial use –3. Agricultural.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Prof. R. Shanthini Jan 26, Hydroelectric - Hydroelectric - Solar - Wind - Geothermal - Marine (Wave and Tidal) - Biofuels (Biomass, Bioethanol and.
Chapter 7.3 (cont.) surface water Glen Canyon Dam was completed in 1963 designed to generate hydropower and create a reservoir to supply water to Arizona,
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
UZAIR KAMAL Mohsin Murad MAJID KHAN. Major Power Project Of The Country 92 miles downstream the confluence of Kabul and Indus Rivers 260 ft high structure.
Chapter 18. The Nile Problem Where Solution Other details 4 positives Clean water Irrigation Transport Tourism Electric power Fishing 4 negatives.
Assessment Statements – Describe and evaluate the sustainability of freshwater resource usage with reference to a case study.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
The Three Gorges Dam Project. Three Gorges Dam The largest dam in the world. Over a mile and a half long and 600 feet high. Has displaced over 1.5 million.
River Basin Management Why do we need water management schemes? Ecosystem approach to RBM Multi-purpose RBM Colorado case study.
Describe the features and characteristics of the Three Gorges Dam.
Global River Basin Usage How humans use water1.
ICAP SAFA Conference 2016 South Asia: Corridor of Opportunities Lahore, January 30, 2016 Mirza Hamid Hasan.
IMPACT OF FUTURE WATER USES OF AFGHANISTAN ON PAKISTAN 26 Augist 2015.
(b)Study Figure 2 which is an extract from a news website about the cause of floods in Pakistan in August With the help of Figure 2 explain why.
Chapter 21 Water Supply, Use and Management. Groundwater and Streams Groundwater –Water found below the Earth’s surface, within the zone of saturation,
Flowing Water By Mike, Holt, Natalie, Claire, Megan.
PRESS BRIEFING WATER AND POWER DEVELOPMENT AUTHORITY December 16, 2005 MEGA DAM PROJECTS.
Lesson Hydropower and Ocean Power. What Is Hydropower? 1. The movement of water is used to generate electricity. 2. Accounts for about 19% of the.
DAMODAR BASIN WATER MANAGEMENT-A REVIEW WITH NEW INITIATIVES- A CASE STUDY By SATYABRATA BANERJEE DY. CHIEF ENGINEER (CIVIL) & DEBASHIS GHOSH CHIEF ENGINEER-I.
Reclamation and Hoover Dam It’s All About The Water.
‘PAKISTAN DEVELOPMENT FORUM 2010’ GOVERNMENT OF GILGIT-BALTISTAN Reform Agenda-Road to Sustainable Economic Development.
What are the problems of managing a river? Socio-economic and environmental needs?
Extended Diploma Mechanical and Electrical Services Construction Dams and Reservoirs.
CLIMATE CHANGE AND WATER RESOURCES OF PAKISTAN
Objectives..describe and explain hard and soft flood prevention strategies Page GCSE Geography AQA A.
River Regulation / Dam Construction – Effects on Rivers and Streams.
INDUS RIVER SYSTEM AUTHORITY (IRSA) “Inter Provincial Water Issues − Challenges and Opportunities ”
Presenter: Dr Sheikh Saeed Ahmad
River Conwy - flood management
GANDHINAGAR INSTITUTE OF TECHNOLOGY
Population Casestudies
Human Effects on Hydrosphere Quality
GEOLOGICAL & ENVIRONMENTAL INVESTIGATIONS
Human Effects on Hydrosphere Quality
AICE QUESTION.
Presentation transcript:

KALABAGH DAM PROJECT General Reservations of Provinces on KBD Feasibility PROJECT BY RABIA RASHEED SHEHRBANO AKBAR ZIL-E-HUMA AKBAR

AIMS OF PROPOSED KBD To Generate Large Amounts of Low Cost Hydro Electric Power. To Increase the Energy Output of the Existing Tarbela Scheme. To Provide Additional Storage and Regulation on the Indus River. To Eliminate and Control the Flood Peaks in the River Indus. To Enhance Water Management by the Conjunctive Operation of Tarbela and KBD Reservoir. To Generate Large Amounts of Low Cost Hydro Electric Power. To Increase the Energy Output of the Existing Tarbela Scheme. To Provide Additional Storage and Regulation on the Indus River. To Eliminate and Control the Flood Peaks in the River Indus. To Enhance Water Management by the Conjunctive Operation of Tarbela and KBD Reservoir.

COST OF KBD Kalabagh Dam's Cost was Projected to be Rs 250 Billion in 1997 Which by the Year 2004 has Increased to the Tune of Rs 660 Billion, if Construction Work is Started Immediately. The Water and Power Development Authority (WAPDA) and Ministry of Water and Power have Calculated Afresh the Cost of the Kalabagh Dam Project Which was US $ 11 Billion in Kalabagh Dam's Cost was Projected to be Rs 250 Billion in 1997 Which by the Year 2004 has Increased to the Tune of Rs 660 Billion, if Construction Work is Started Immediately. The Water and Power Development Authority (WAPDA) and Ministry of Water and Power have Calculated Afresh the Cost of the Kalabagh Dam Project Which was US $ 11 Billion in 2004.

LOCATION MAP OF KBD

GHAZI BAROTHA POWER STATION

DISTINCTIVE CHARACTERISTICS OF KBD PROJECT LAND & ITS ACQUISITION acres Acquisition on the Basis of Easement PURPOSE OF RIGHT BANK CANAL Disposal of Floodwater Total Maximum Discharge Capacity of 2 Million Cusecs FUNCTIONS OF LEFT BANK CANAL Powerhouse Ultimate Power Generation Capacity of 3600 MW. KBD RESERVOIR Extend 92 Miles up the Indus Extend 36 miles up the Soan River Extend 10 miles up the Kabul River from the Kabul-Indus confluence

DISTINCTIVE CHARACTERISTICS OF KBD PROJECT AREA OF THE RESERVOIR The Reservoir Area would be 164 Sq. Miles in Total at Kabul Indus Confluece POPULATION TO BE DISPLACED FROM PUNJAB FROM NWFP COMPENSATION PLAN FOR DISPLACED POPULATION Minimum of 12.5 Acres Land Per Land Owning Family CLEARANCE OF THE DEPOSITED SEDIMENT FROM THE RESERVOIR Orifice Spillway

EXPECTED BENEFITS OF THE KBD PROJECT Enhancement in the Irrigation Water Supply. Enhancement in the Power Generation Capacity. Capacity (MW) Generation (GWH)

POWER GENERATION ESTIMATION

ELECTRICITY PRODUCERS TOTAL GENERATING CAPACITY WAPDA HYDEL6461 MW WAPDA THERMAL MW KESC176 MW INDEPENDENT PP 6365 MW PAKISTAN ATOMIC ENERGY COMMISSION 462 MW TOTAL24736 MW

ELECTRICITY STATISTICS TOTAL GENERATING CAPACITY 24,736 MW TOTAL PRODUCTION 9500 MW DEMAND 14,500 MW SHORTAGE 5000 MW

GENERAL OBSERVATIONS OF NWFP, SINDH & BALUCHISTAN

RESERVATIO NS OF NWFP RESERVATIO NS OF SINDH RESERVATIO N OF BALUCHISTA N FLOODING OF PESHAWAR & NOWSHEHRA VALLEY KBD WOULD RENDER SINDH INTO DESERT REDUCTION IN THE EXISTING SHARE OF IRRIGATION WATER DRAINAGE OF SURROUNDING AREA OF MARDAN, PABBI & SWABI PLAINS SINDH’S SHARE OF THE INDUS WATER WILL BE CURTAILED OPERATION OF MARDAN SCARP WOULD BE ADVERSLY AFFECTED LOCATION OF DAM ON FAULT LINE FERTILE CULTIVABLE LAND WOULD BE SUBMERGED HIGH LEVEL OUTLETS WOULD BE USED TO DIVERT WATER FROM THE RESERVOIR LARGE NUMBER OF PEOPLE WOULD BE DISPLACED NO SURPLUS WATER TO FILL KBD

RESERVATIONS OF NWFP (KHYBERPAKHTOONKHUA) FLOODING OF PESHAWAR & NOWSHEHRA VALLEY DRAINAGE OF SURROUNDING AREA OF MARDAN, PABBI & SWABI PLAINS OPERATION OF MARDAN SCARP WOULD BE ADVERSLY AFFECTED FERTILE CULTIVABLE LAND WOULD BE SUBMERGED LARGE NUMBER OF PEOPLE WOULD BE DISPLACED FLOODING OF PESHAWAR & NOWSHEHRA VALLEY DRAINAGE OF SURROUNDING AREA OF MARDAN, PABBI & SWABI PLAINS OPERATION OF MARDAN SCARP WOULD BE ADVERSLY AFFECTED FERTILE CULTIVABLE LAND WOULD BE SUBMERGED LARGE NUMBER OF PEOPLE WOULD BE DISPLACED

RESERVATIONS OF SINDH KBD Will Render SINDH Into Desert No Constant Flow of Indus Sea Water Intrusion

RESERVATIONS OF SINDH Sindh’s Share of Indus Water will be Curtailed Water from KBD will go to Irrigate Farmlands in other Provinces at Their Cost

RESERVATIONS OF SINDH Location of Dam on Fault Line Highly Dangerous Area on Active Seismic Zone Underlying Rocks contain Numerous Fractures

RESERVATIONS OF SINDH High Level Outlets would be Used to Divert Water from the Reservoir

RESERVATIONS OF SINDH No Surplus Water to Fill KBD Reservoir Availability of Water in 3 Western Rivers = MAF Requirement of 4 Provinces = MAF Release below Kotri =10MAF Remainder = -0.76MAF Negative Balance Shows There is not Enough Water in River Indus to be Stored for Later Use. No Surplus Water to Fill KBD Reservoir Availability of Water in 3 Western Rivers = MAF Requirement of 4 Provinces = MAF Release below Kotri =10MAF Remainder = -0.76MAF Negative Balance Shows There is not Enough Water in River Indus to be Stored for Later Use.

RESERVATION OF BALUCHISTAN Reduction in the Existing Share of Irrigation Water

IMPACTS OF KBD PROJECT Population Displacement Agricultural land Submergence Back Water Effect In Nowshera Siltation Damage To Mangrove Forest And KACHO In Sindh Population Displacement Agricultural land Submergence Back Water Effect In Nowshera Siltation Damage To Mangrove Forest And KACHO In Sindh

POPULATION DISPLACEMENT Displacement and Resettlement of Population According to 1991 Projected Figures, will be 83,000 persons. A Resettlement Plan Includes Model Villages in Near Vicinity and Facilities for Alternative Employment is Prepared by WAPDA and Reviewed by WORLD BANK Experts.

AGRICULTURAL LAND SUBMERGENCE AREA OF THE RESERVOIR ACRES UNCULTIVABLE LAND ACRES UNCULTIVABLE LAND 74% OF TOTAL AREA AREA UNDER DRY FARMING 23.4% IRRIGATED 2.6% IRRIGATED ACRES OF TOTAL

BACK WATER EFFECT IN NOWSHERA The Reservoir Limit in the Kabul River Bed Ends about 10 Miles Downstream of Nowshera Town in the Adopted Project Scheme. With Prescribed Operation Sequence, There is No Danger of Backwater Effects Traveling to Nowshera Even in a Flood Similar to the Maximum Recorded Flood.

SILTATION No Siltation Problems will be Faced in Case of KBD. Dams Before KALABAGH Filter Out Much of the Silt, So the Rate of Buildup will Decrease. By Silt Deposition the Foundation of Dam is Protected.

MANGROVE FOREST AND KACHO IN SINDH Sindh has a Reservation that KBD will Adversely Affect its Mangrove Forest, Fish Production and Drinking Water Supply Below Kotri. Real Causes of this Reduction are Uncontrolled Overgrazing and Cutting due to Extreme Population Pressure of Karachi. Real Need is for Replanting Salt Tolerant Varieties with Provision for Controlled Doses of Freshwater. This Possibility would be Much Enhanced with an Upstream Storage Facility ike Kalabagh.

QUESTIONS?? ??