Ahead4 Development Approach Copyright Ahead4.biz 2015.

Slides:



Advertisements
Similar presentations
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
Advertisements

© Tally Solutions Pvt. Ltd. All Rights Reserved Customisation of Shoper 9 October 2009.
Work Breakdown Structure.
Code 2 Layers. Step 1 Using 2 Layers Step 2: There are 2 layers Using 2 Layers.
NCS Grid Service Ken Meacham, IT Innovation Crystal Grid Workshop, Sept 2004.
Copyright © 2001 Bolton Institute Faculty of Technology Multimedia Integration and Applications Lecture 9: Production Management Damien Markey.
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Information Systems Development – The System Approach 1. “System.
Phase Difference = Phase Difference = 0.05.
Project Initiation Meeting Presented By: > > Office of the Chief Information Officer >
Implementing Disaster Recovery Plans
Web Project Methodology Move It Up Marketing Web Project Methodology in six steps to ensure quality and efficient projects.
FTP File Transfer Protocol. Introduction transfer file to/from remote host client/server model  client: side that initiates transfer (either to/from.
4th Phase : 4th Phase : CONTROL Why is control necessary? Because:  People make mistakes  External factors can have impact on the project  Requirements,
Words + picturesPicturesWords Day Day
ITIS 1210 Introduction to Web-Based Information Systems Chapter 23 How Web Host Servers Work.
Installation and Maintenance of Health IT Systems
SDK Phase 0 Software simulation environment on PC Assumed underway by Nintendo iReady can provide GB to RS232 adapter –allows GB to be connected to PC.
ALMA Integrated Computing Team Coordination & Planning Meeting #4 Santiago, November 2014 Reporting Software Principles M Chavan, ESO R Soto, ALMA.
Judith Wheeler, OCN Eastern Region Quality Reviewer Direct Claims Status Or, what do we need to see when undertaking a monitoring visit?
Procure Plus model 1. Scope 2. Kick start meeting 3. Initial surveys 4. Information for costs 7. Live on e-Procurement 6. Pre-contract meeting 5. Target.
CHT Project Progress Report 10/07 Simon. CHT Project Develop a resource management scheduling algorithm for CHT datacenter. ◦ Two types of jobs, interactive/latency-
EI Toolkit Sample Submitted: November 2003 Legacy System Retirement Report The following pages reflect a SAMPLE report used by Commercial Industry Company.
Market Systems Release Update Modifications Committee Meeting 55 June 19 th
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
By : SAG3 Members.  Cross platform client interface for Time recording/capturing  MS Project integration to Time tracker  integration to Time.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Herriman High Computer Programming 1A Software Development Cycle Things to Know.
Definition of Project Scope
Ed 5860 Curriculum in Detail October 13, What is a curriculum? A program put together A program put together Guideline or an outline grade-specific.
Next Generation Trnsport Impact Assessment Sub-project Jim Johnson, Florida DOT and Pamela Barry, Info Tech, Inc.
CompSci 44.1 Game Package Introduction to Jam’s Video Game Package.
1 Copyright © OpenSymmetry Inc. Proprietary Information Delivering Repeatable Results success is: a clear vision to achieve the next.
VOX Project Status T. Levshina. 5/7/2003LCG SEC meetings2 Goals, team and collaborators Purpose: To facilitate the remote participation of US based physicists.
© Questionnaire 27 th September 2010.
WEEK 6 Introduction to Project Management. Agenda Phase 4: Controlling.
1 Server Business Logic & OAuth Beta Overview October 4, 2010 Alan Hantke Product Development Server Business Logic Intuit Partner Platform Diane Weiss.
Progress of ITSM at Pomona College and the use of Footprints Information Technology Services IT Service Management and the Tools Supporting it Pomona College,
CHANGE MANAGEMENT - PART 2 MODULE 7
1 Presented by: Val Pennell, Test Tool Manager Date: March 9, 2004 Software Testing Tools – Load Testing.
Lesson Objectives 1) Review the steps involved in problem solving 2) Review the stages of the System Life Cycle 3) Describe what prototyping is and the.
Saskatchewan Polytechnic Employee Engagement Survey Saskatchewan Polytechnic Kick-Off Call.
Web Application Development Process
TK2023 Object-Oriented Software Engineering
Client1 Client2 Client3 Client4 My network setup Server Pix Des
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Their role within Schools and Colleges
Grid Code What is the Standard Modification Process? Panel
Copyrights apply.
This is the cover slide..
Software Quality Engineering
Chapter 1 (pages 4-9); Overview of SDLC
Copyright © Simon Wallace
SWEN 5230 Your Project Title
Release 3 Update December 2018.
Lesson 1 Understanding Software Quality Assurance
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
Their role within Schools and Colleges
DØRACE Workshop Summary
Overall Project RAG Status:
Training 01: Project Lifecycle & Business Technology Analysis
Their role within Schools and Colleges
C.2.10 Sample Questions.
Monitor Producer Consumer.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Project Management Techniques Project Management Life Cycle
CSS Consequential Programme Change Assurance March, 2019
For More Details:
RAASP DSC Change Management Committee update
Presentation transcript:

Ahead4 Development Approach Copyright Ahead4.biz 2015

ScopePlanDesignBuildTestDeployMaintain 7 phase development process Copyright Ahead4.biz 2015

7 main phases in more detail Scope Plan DesignBuildTest Deploy Maintain Agree main requirements with client Agree quotation and timing Wireframe and sample page/theme design Develop code, plug-ins, monitor, change management Test Extensively Test Internally Test Externally Put live on Ahead4 server or port to client server Provide support and minor modifications Copyright Ahead4.biz 2015 NB As we move through the process client approvals are required to progress.