Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
City of Hubbard Transportation System Plan Update April 25, 2012.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Downtown Access Improvements Plan Town of Hillsborough 2014.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Public Works EVANSTON ILLINOIS September 29, 2014 Dodge Avenue/ETHS /Mason Park Bike Improvements Project Sat Nagar, P.E. Assistant Director of Engineering.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Board of County Commissioners September 25, 2012.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Community Development Department Construction Phase.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Phase 2: 30% Design Plans September 4 th, 2012.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
AWARD CONSTRUCTION CONTRACT FOR CITY HALL PARKING LOT REPAVING OTHER ADA UPDATES S AUSALITO C ITY C OUNCIL 14JAN14.
Sausalito Bike Racks Research Results January, 2014.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Sewer Improvement Project Contingent Award of Construction.
Downtown Marina and Promenade January 8, 2008 Agenda Items 6.05 & 6.09.
City of Charlottesville
City Council Meeting November 7, 2016
Project Status & Right-of-Way Acquisition
Complete Streets Award Program
District 3 Complete Streets Projects
Stanford Avenue/El Camino Real Intersection Improvements Project
Sausalito Downtown Public Restroom
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
River to Sea TPO Meeting US 92/International Speedway Boulevard
Measure A Financial Oversight Committee August 7, 2013
Early Voting Starts Oct. 20 | Election Day Nov
SE 12th Street Roadway Improvements February 8, 2005.
Bicycle and Pedestrian Update to City Council
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
VICTORIA CITY COUNCIL MEETING
Presentation transcript:

Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans

Sidewalks on Humboldt between Anchor and Bay are too narrow and do not, in places, conform to California Building Code for cross slopes or other barriers for persons with mobility disabilities Recommendation is to widen the sidewalks Council approval to widen the sidewalks is necessary before any other approvals can be sought

Tour coach loading/unloading is too narrow and congested

Narrow sidewalk with encroachments and obstructions

Inadequate width for queuing/loading/unloading of groups

West side inadequate width

West side inadequate width, excessive cross-slopes at driveway and overlap between pedestrian and vehicle parking in Lot 2

Proposed sidewalk widening

Summary Widen east side by 8 feet while preserving landscape strip between sidewalk and Sausalito Yacht Harbor parking lot Widen west side by 10 feet including loss of two sub-standard parking spaces in Lot 2 and conversion of 7 head-in/back-out diagonal spaces to 4 parallel spaces

Widen sidewalk and improve landscape strip

Widen sidewalk

Pause for questions …

Background: Sausalito Bridgeway Path (1970s – 1980s) General Plan Circulation and Parking Element objectives CP-2.0, CP-2.1, CP-2.1.8, CP-2.2.1, CP-2.3.2, CP CP-3.1, CP-3.2, CP-3.3, CP-3.4 CP-4.0, CP a- Marin County North South Bikeway Study (1994) 2009 NMTPP Bridgeway to Ferry Landing design project (constructed, 2012) Harbor & Downtown Action Committee final report (April 24, 2009) NMTPP Ferry Landing to Gate 6 Road Path Feasibility Study (Council November 16, 2010)

NMTPP Bridgeway to Ferry

EXISTING CONDITIONS

Bay Street 40’ wide street 6’ wide sidewalks 4 metered parking spcs Humbolt Street 60’ wide street 6.5’ wide sidewalk (east) 5.5’ wide sidewalk (west) 7 metered parking spcs Anchor Street 34’ wide street 4.25’ wide sidewalk 3 metered parking spcs EXISTING CONDITIONS

NMTPP Bridgeway to Ferry

H&DAC

NMTPP Bridgeway to Ferry: Briefing with City Council OMIT Committee 10/19/200910/26/2009 Direction to resolve design elements on Anchor, Bay, then Humbolt, stay within budget Discussion w/ Interested Parties – 10/27/2009 Rex/Olsen/Ulman – DHAC MCBC/TAM Council Member Weiner Sausalito Yacht Harbor Management Former Council Member Bob Mitchell

Anchor St. Improvements narrow street width from 34’ to 30’ widen sidewalk from 4.25’ to 8’ retain 2 lanes for automobiles add Class 2 bicycle lane improve pedestrian crosswalks retain existing street trees narrow parking lot 1 entrance to two lanes remove 3 metered parking stalls

Bay St. Improvements narrow street width from 40’ to 38’ widen northern sidewalk from 6’ to 8’ add Class 2 bicycle lane retain 2 lanes for automobiles retain 4 metered parking spaces improve pedestrian crosswalks retain existing street trees widen parking lot 3 entrance to two lanes

Anchor and Bay Improvements constructed 2012 Humboldt deferred to Path Plan Funding limitations

Segment 1 (Lots 1 & 2) Lot 1: Long-term phase Lot 2: Mid-term phase NMTPP Path Plan (Alta/Parisi)

Changes since Path Plan Right of Way acquisition considered too costly Additional study of bicycle and pedestrian usage following completion of Anchor and Bay segments by Staff, Sandis and Parisi Development of post-NMTPP funding options – TFCA and Ferry Terminal Improvements grants

CONCLUSION To better serve pedestrians, bicyclists and motor vehicle operators, Staff and consultants recommend that the City widen the sidewalks on Humboldt between Anchor and Bay Council approval to widen the sidewalks is necessary before any other approvals can be sought If the project includes a “bicycle facility,” the $83,000 TFCA grant is available

With Council approval: Staff will seek design review and other approvals necessary With other necessary approvals in hand, Staff will return to Council with any funding approvals necessary for construction or to seek authorization to invite bids for construction if additional bids are necessary Schedule is dependent upon approvals, but given funding construction would be completed winter 13/14 at the earliest

QUESTIONS AND COMMENTS