Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.

Slides:



Advertisements
Similar presentations
- GDP 2011 versus 2010 – increase by 5.5%
Advertisements

Sharing of ISTS Charges & Losses Regulation
Amendment 3/5 Workshop.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility)
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2009.
SHARING OF ISTS TRANSMISSION CHARGES & LOSSES
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Module on Computation of PoC Transmission Charges
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Sharing of Inter State Transmission Charges National Load Despatch Centre Implementing Agency.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Billing, Collection and Disbursement Procedures
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Sharing of Inter-State Transmission Charges and Losses (PoC Regime) Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
CERC (Power System Development Fund) Regulations 2010.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Sharing of Inter-State Transmission Losses 11/29/
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Standards Review Subcommittee Update August 17, 2010.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Point of Connection Methodology for Sharing of Transmission Charges.
Philippine Feed-In Tariff System Implementation 1.
Sharing of Inter State Transmission Charges Eastern Regional Load Despatch Centre.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Implementation of Point of Connection (PoC) Methodology.
Local asset charging arrangements DCMF April 2008.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Point of connection Mechanism
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
Transmission Tariff Regulations. 1. ‘Applicant’ means a generating company or transmission licensee who has made an application for determination of tariff.
Interstate Transmission system
Association of providers of communal services in Republic of Macedonia - ADKOM Business planning in Macedonia – process starting as a request of the Regulator.
Operationalizing One Nation One Grid
Open Access.
Scheduling of Collective Transactions Through Power Exchange
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Sharing of Inter-State Transmission Losses
Congestion regulations
- GDP 2011 versus 2010 – increase by 5.5%
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Presentation transcript:

Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI

Introduction Notification of Regulations : 15 th June 2010 Applicable to:  Designated ISTS Customers  Inter State Transmission Licensees  NLDC, RLDC, SLDCs, and RPCsRegulation 1(2) Regulations shall come into force from  For a period of 5 years unless reviewed or extended by the CommissionRegulation1(3)

Scope of the Regulations Regulation 3 Power Stations / Generating Stations that are regional entities as defined in the Indian Electricity Grid Code (IEGC) State Electricity Boards / State Transmission Utilities connected with ISTS (on behalf of distribution companies, generators and other bulk customers connected to the transmission system owned by the SEB/STU/intrastate transmission licensee) Any bulk consumer directly connected with the ISTS Any designated entity representing a physically connected entity as per above clauses 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 3

Sharing of ISTS Charges and Losses Chapter 3 Principles:Regulation 4  Load Flow Based Method  Point of Connection Charging Method Mechanism Regulation 5  PoC Charges and Losses in advance  Based on Technical and Commercial Information provided by DICs, ISTS Transmission Licensees, NLDC, RLDCs and SLDCs  Charges for LTA/MTOA : Rs/MW/Month  Charges for STOA : Rs/MW/Hour

Important Definitions(1) Application Period “Application Period means the period of application of the charges determined as per these regulations and shall ordinarily be 12 (twelve) months coinciding with the Financial Year, which shall be further divided into multiple blocks of months representing the seasonal conditions and peak and other than peak conditions; “ 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 5

Important Definitions(2) Approved Injection “Approved Injection means the injection in MW vetted by Implementing Agency (IA) for the Designated ISTS Customer for each representative block of months, peak and other than peak scenarios at the ex-bus of the generator or any other injection point of the Designated ISTS Customer into the ISTS, and determined based on the generation data submitted by the Designated ISTS Customers incorporating total injection into the grid, considering the long term and medium term contracts” 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 6

Important Definitions(3) Designated ISTS Customers “Designated ISTS Customers (‘DIC’s) means the users of any segments/elements of the ISTS and shall include all generators, state transmission utilities, SEBs or load serving entities directly connected to the ISTS including Bulk Consumer and any other entity/person” 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 7

Important Definitions(4) Yearly Transmission Charges “Yearly Transmission Charge (YTC) means the Annual Transmission Charges for existing lines determined by the Commission in accordance with the Terms and Conditions of Tariff Regulations or adopted in the case of tariff based competitive bidding in accordance with the Transmission License Regulations as specified by the Commission and as in force from time to time and for new lines based on benchmarked capital costs” 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 8

Important Definitions(5) Transmission Service Agreement “Transmission Service Agreement (TSA) shall mean the agreement to be entered into between the Designated ISTS Customer(s) and ISTS Licensee(s) in terms of Chapter 6;” 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 9

Process to Determine PoC Charges and Losses Chapter 3 Data CollectionRegulation 7(1)  DICs, Transmission Licensees to submit Basic Network Data Network Data for Load Flow Analysis Regulation 7(1)(b)  Electrical Plant or line upto 132 kV  Generators connected at 110 kV Dedicated Transmission Lines Regulation 7(1)(c)  Owned and Operated by ISTS………. Included in Basic Network  Owned and Operated by Generator….Excluded

Information Procedures (1) Chapter 7 Data to be submitted by DICs  Basic Network Details  Demand or Injection Forecast for each season Data to be submitted by CTU, Owners of Deemed ISTS and Certified ISTS lines  Basic Network Details of ISTS, Deemed ISTS, Certified ISTS Lines  Entire Network Data for first year of Implementation and YTC  Dates and data of commissioning of any new transmission asset for subsequent years

Information Procedures (2) Injection and Withdrawal forecast for different blocks of months (Peak and Other than Peak): Regulation 16(4)  April to June…………………………… (May 15)  July to September……………………. (August 31)  October to November………………… (October 30)  December to February……………….. (January 15)  March…………………………………… (March 15) 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 12

Flow Chart for Data Acquisition CTU/Deemed ISTS/certified ISTSLicencees Implementing Agency Network ParametersLine wise YTC Designated ISTS Customers Nodal Injection / Withdrawal Long Term and Medium Term Injection / Withdrawal Approved Injection Approved Withdrawal Basic Network 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 13 Network Parameters

Nodal Generation / Demand Regulation 7(1)(d) / (e)  Based on Forecast provided by DICs  Forecast should be based on Long Term and Medium Term Contracts  Forecast Generation to be vetted by IA based on Historic Generation / Demand.  Changes in Generation /Demand to be Communicated to DICs IA to perform AC Load flow Regulation 7(1)(h) Converged Load Flow results to be verified by Validation Committee Regulation 7(1)(i)

Validation Committee Nominee from Commission to Chair the Committee Regulation 7(1)(g) Validation Committee Comprises two officials each from:  Implementing Agency  National Load Despatch Centre  Regional Power Committee  Central Transmission Utility  Central Electricity Authority  Central Electricity Regulatory Commission 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 15

Network Truncation Network Truncation by IA Regulation 7(1)(j)  Upto 400 kV except NER, where it shall be reduced to 132 kV Annexure I, Clause 2.3 Power inflow from Lower voltage Level : Generation Node Annexure I, Clause 2.3 Power outflow from Lower voltage Level : Demand Node Annexure I, Clause 2.3 AC Load Flow on Truncated Network Annexure I, Clause 2.3

Computation of PoC Charges (1) Average YTC per circuit km shall be used for computation of chargesRegulation 7(1)(l) YTC of substations to be apportioned in line Regulation 7(1)(m)  2/3 to higher voltage lines  1/3 to lower voltage lines  Apportionment among lines on the basis of length. PoC Charges to be computed for 5 blocks of month and peak and other the peak conditions

Computation of PoC Charges (2) Representative Blocks of Months Regulation 7(1)(o)  April to June  July to September  October to November  December to February  March Peak Hours : 8hrs Regulation 7(1)(o) Other the Peak Hours :16 Hrs Average YTC to be apportioned to peak and other than peak based on the no. of hours constituting these periods Regulation 7(1)(p) 50% recovery through Hybrid Methodology and 50% through Uniform Charge Sharing Mechanism Regulation 7(1)(q)

Computation of PoC Losses Loss Allocation Factor to be computed for each season using Hybrid Methodology Regulation 7(1)(r) 50% losses through Hybrid Method and 50% through Uniform Loss Allocation Mechanism Regulation 7(1)(s) Weighted average of LAF for peak and other than peak conditions shall be used Regulation 7(1)(s) Loss Application as per the Procedure prepared by NLDC

Zoning Criteria for Zoning of nodes:Regulations7(1)(t)  Costs within the same range  Geographically and electrically proximate  Nodes with connective to Thermal Generators > 1500 MW or Hydro Generators > 500 MW to be taken as separate zone.  Demand zones : Sate Control Area  Except NER states which are to taken as one zone. Zonal Charges : Weighted Average of Nodal Charges Annexure I, Clause 2.2 Revision of Zones in a financial year  Significant Changes in Power System  Prior approval from commission Regulations7(1)(t)(vi) 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 20

Implementing Agency (IA) Chapter 8 For First Two YearsRegulation 18(1)  NLDC shall be Implementing Agency Procedures to be prepared by IA  Procedure for Data Collection  Procedure for Loss Sharing  Procedure for Transmission Charge Computation Expenses of IA to be included in YTC and approved by Commission Regulation 18(4) 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 21

Information on Public Domain Regulation 17 Approved Basic Network Data and Assumptions, if any Zonal or nodal transmission charges for each block of month Zonal or Nodal Transmission losses data Schedule of Charges payable by each constituent after undertaking necessary true up costs 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 22

Treatment of HVDC Annexure I Clause 2.7 Zero Marginal Participation for HVDC Line  HVDC line flow regulated by power order. MP Method can not recover its cost directly. HVDC line can be modeled as:  Load at sending end  Generator at receiving end 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 23

Indirect Method for HVDC Cost Allocation Compute Transmission Charges for all load and generators with all HVDC lines in service. Disconnect HVDC line and again compute new transmission charges for all loads and generators Compute difference between nodal charges with or without HVDC. Identify nodes which benefits with the presence of HVDC Allocate HVDC line cost to the identified nodes. 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 24

Accounting Regulation 10 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 25 Regional Transmission Accounts (1 st Working Day of Every Month for the previous Month) Regional Transmission Deviation Accounts (15 th Day of Every Month for the previous Month) Regional Power Committee

Billing (1) Regulation 11 Responsibility of Central Transmission Utility (CTU)  Based on Accounts issued by RPC Long Term Customers shall be billed directly for:  Own Transmission Charges  Generator Transmission Charges in proportion to MW entitlement after “Commercial Operation” Generators shall be billed only for deviations. Bill to be raised only on DIC’s  SEB/STU may recover such charges from DISCOMs, Generators and Bulk Consumers. 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 26

Billing (2) 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 27 Central Transmission Utility First Part (Based on Approved Injection/Withdrawal and PoC Charge) Third Part (Adjustments Based on FERV,Interest, Rescheduling of Commissioning) Fourth Part (Deviations) Second Part (Recovery of Charges for Additional Medium Term Open Access) 1 st Day of a Month Biannually (1 st Day of September and March 15 th Day of a Month

Treatment of Deviations Regulation 11(7) Deviation Calculation after considering Short Term Open Access. Charge to be Calculated on Block wise Deviation Deviations by Generator shall not be charged to Long Term Customers No additional Charge for Deviations in case :  Rescheduling of Maintenance Schedule and Certified by RPC 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 28 Deviation = Metered MW – (Approved Injection/Withdrawal+ Approved Short Term Open Access)

Treatment of Deviations (1) 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 29 Generator Net Injection Net Drawl 1.25 times PoC Charge Deviation upto than 20% Deviation Greater than 20% PoC Charge 1.25 times PoC Charge

Treatment of Deviations (2) 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 30 Demand Net Drawl Net Injection 1.25 times PoC Charge Deviation upto than 20% Deviation Greater than 20% PoC Charge 1.25 times PoC Charge

Collection and Disbursement Regulation 14 CTU to collect charges on behalf of ISTS service providers. CTU to disburse in proportion to Monthly Transmission Charges. Payment and Disbursement shall be executed through RTGS. Delayed Payments shall result in pro-rata reduction in all payouts Payment Security as per detailed procedure prepared by CTU 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 31

Transmission Service Agreement Governs the provision of transmission services and charging for the same. CTU shall publish the draft Model Transmission Service Agreement on its website and invite public comments on the same. Signing of the Transmission Service agreement shall not be a pre-condition for construction of new network elements by the CTU and Transmission Licensees 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 32

Revenue Sharing Agreement  Between CTU and ISTS Transmission Licensees  For disbursing monthly transmission charges among various transmission licensees Amendments of Contracts  Realignment of all existing contracts within 60 days of notification of TSA 6/24/2016 राष्ट्रीय भार प्रेषण केंद्र 33

THANK YOU