Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March 3 2011, Milano, Italy Denis Kostin,

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
SRF Beam Test Facility at NML Jerry Leibfritz April 26, 2010.
CC2 Input Coupler Introduction, Installation, & Processing Tim Koeth November 16 th, 2005.
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
1 st stage Possible extension XFEL Cryo System Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13)
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Recent Result for the STF-2 Cryomodule Operation
Areal RF Station A. Vardanyan
Serial testing of XFEL cryomodules: results of the cryogenic heat load measurements  T Böckmann1, Y Bozhko1, W Gay2, P Halczynski2, B Petersen1, S Putselyk3,
Cryomodule test stand at ESS site
TESLA Type Cavity HOM Coupler Multipacting
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
5K or not? & TTF module thermal modeling update
Test plan of ESS HB elliptical cavity
XFEL Vacuum System Commissioning
TTF module thermal modeling
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
Test plan of ESS HB elliptical cavity
Findings in RF Power Couplers after operation on cavities in PXFEL2
ESS RF Development at Uppsala University
World Wide Fundamental Power Coupler meeting #3
XFEL cavities and cryomodules measurements at AMTF
Wolfgang Anders, BESSY, Berlin
V. Veshcherevich Cornell University
CW Operation of XFEL Modules
Main Coupler R&D at DESY
CW accelerating module test progress at DESY
Test plan of ESS HB elliptical cavity
EU-XFEL summary of performance degradation
FRIB summary of performance degradation - VTA to cryomodule
First High Power Test of the ESS Double Spoke Cavity package
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
Cryomodules Challenges for PERLE
Cryomodule Performance in FLASH and XFEL
Accelerator Physics Particle Acceleration
V. Veshcherevich Cornell University
ERL Director’s Review Main Linac
Exceptional Events During the Operation of the European XFEL
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin, MHF-SL, DESY.

Superconducting Accelerating Cryo-Module Tests at DESY 2 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Overview Module Test Stand CMTB Module Test Procedure Module Test Data Summary

Superconducting Accelerating Cryo-Module Tests at DESY 3 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Cryo Module Test Bench

Superconducting Accelerating Cryo-Module Tests at DESY 4 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy 70K shield Cavity typeTESLA Number of cavities8 Cavity length1.038 m Operating frequency1.3 GHz R/Q1036 Ω Accelerating Gradient MV/m Quality factor10 10 Q ext (input coupler)3×10 6 Operating temperature2 K LHe cooling 2K / 31mbar HERA cryoplant is used 12m 4K shield input coupler 2 phase LHe pipe He gas return pipe Module / Cryogenics

Superconducting Accelerating Cryo-Module Tests at DESY 5 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy CMTB RF System

Superconducting Accelerating Cryo-Module Tests at DESY 6 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy CMTB LLRF System data acquisition

Superconducting Accelerating Cryo-Module Tests at DESY 7 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Two gamma detectors are placed near the beam line on both ends of the module (by the end-caps). Gamma detector "GUN"Gamma detector "DUMP" module Module Gamma Radiation Measurement

Superconducting Accelerating Cryo-Module Tests at DESY 8 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Module Coupler Common pumping line Ion Getter PumpTi Sublimation Pump Beam line TSP/IGP connected in parallel and IGP used as a vacuum gauge. Module Vacuum System

Superconducting Accelerating Cryo-Module Tests at DESY 9 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy 3 times e- (charged particles) light in coupler vacuum light in wave guide (air side) temperature cold ceramic temperature warm ceramic vacuum coupler vacuum cavity bias voltage cryogenic OK low level RF gate on klystron all thresholds are hardware set Coupler Technical Interlock

Superconducting Accelerating Cryo-Module Tests at DESY 10 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy RF Conditioning Data / Controls A.Goessel, DESY.

Superconducting Accelerating Cryo-Module Tests at DESY 11 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Module Test Procedure (1)

Superconducting Accelerating Cryo-Module Tests at DESY 12 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Module Test Procedure (2)

Superconducting Accelerating Cryo-Module Tests at DESY 13 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Module Test Procedure (3)

Superconducting Accelerating Cryo-Module Tests at DESY 14 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Module Test Data coupler RF power conditioning8 couplers coupler sensors data history8 couplers k t (cavity probe calibration)8 cavities Q load (at 1.3 GHz)8 cavities Q ext_probe, Q ext_HOM1/2 (at 1.3 GHz)8 cavities frequency / spectra8 cavities E acc.X.start (single)8 cavities E acc.max (single, no Q o )8 cavities X-rays (E acc.max )8 cavities Q o (E acc )module X-rays(Eacc)module cavity conditioning data8 cavities HOM couplers Q ext (Freq_HOM)8 cavities coupler / cavity vacuum pressure e- probes signal (voltage) light (PM) signal (voltage) – not for the XFEL / AMTF spark detector (diode) signal (voltage) cold ceramics temperature (PT1000) T 70K warm ceramics temperature (IR/PT1000) T 300K coupler sensors data RF power / cavity gradient gamma radiation (X-rays) LHe level / pressure

Superconducting Accelerating Cryo-Module Tests at DESY 15 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Cryosystem/Cooldown Test temperature measurement: temperature sensors (cavities/couplers + cryogenics) data are stored. multiple cooldown / warm-up test. cavity resonance frequency measurement during the cooldown. cryogenic losses measurement based on temperature and LHe flow data: 2K, 4K and 70K static (infrastructure) and dynamic (RF power) losses. stretch-wire based module dimensional changes measurements.

Superconducting Accelerating Cryo-Module Tests at DESY 16 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy evaluated error margins for accelerating gradients in this test are about  %. RF Power Calibration R sh /Q=1030 , Lcavity=1.035m, Qload=3  10 6, f 0 =1.3GHz, Pfor  5kW, t fill =1300  s (for calibration, 500  s for flat-top) flat-top RF power pulse Cavities gradients for the 1.3 ms rectangular pulse RF Calibration / Cavity Test

Superconducting Accelerating Cryo-Module Tests at DESY 17 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Input RF Couplers coupling tuning range measured at CMTB operating value Q load =3  10 6 RF Couplers Q load Tests

Superconducting Accelerating Cryo-Module Tests at DESY 18 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy RF Couplers Conditioning History/Data (1) Light IL events 20  s pulses 50,100,200,400,800  s pulses Light IL events

Superconducting Accelerating Cryo-Module Tests at DESY 19 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy RF Couplers Conditioning History/Data (2) 1300  s pulses TSP fired Light IL events TSP saturated cryo works RF power sweep at 1300  s pulse coupler 1,2,6,8 activity

Superconducting Accelerating Cryo-Module Tests at DESY 20 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy RF Couplers Conditioning Time

Superconducting Accelerating Cryo-Module Tests at DESY 21 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Module Test Results: PXFEL1 Data (1) measured (CMTB)XFEL specification RF power, kW K losses, W K losses, W static cryo-losses:

Superconducting Accelerating Cryo-Module Tests at DESY 22 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Flat-top pulse μs operation at 10 Hz Module Test Results: PXFEL1 Data (2) dynamic cryo-losses gamma radiation Q 0 (E acc )

Superconducting Accelerating Cryo-Module Tests at DESY 23 Denis Kostin, MHF-SL, DESY. TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Summary High and low power RF tests, as well as cryogenic tests are conducted on the accelerating SRF modules and cavities/couplers using the Cryo Module Test Bench (CMTB) at DESY. 9 SRF modules (including one 3.9 GHz module) tested until now at CMTB. XFEL Accelerating Module Test Facility (AMTF) is under construction. SRF module test procedure was developed together with test data structure. Module test data is stored for each test and used for the performance analysis. New AMTF facility test data structure will be based upon CMTB and TTF data structure with implementation of module centered data clusters (not only cavity and couplers).