Growth Management Department, Collier County October 6, 2015 COMPLETE STREETS, SIDEWALK/PATHWAYS & MEDIAN LANDSCAPING OPTIONS.

Slides:



Advertisements
Similar presentations
An Overview of the Complete Streets Concept and a Review of NCDOT’s Proposed Complete Streets Guidelines PHC COMPLETE STREETS.
Advertisements

CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
US 98 / CR 30A beautification and Safety improvements
Southern Corridor Study Recommendations March 16, 2011.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Using LDRs to Implement Ped/Bike Change. LDRs – Land Development Regulations The collection of laws and regulations that govern the use of land, zoning,
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Miccosukee Road Resurfacing and Re-striping Public Input Requested On-Street Parking vs Bike Lanes.
Neighborhood Preservation and Revitalization Division Board of County Commissioners March 10, Neighborhood Improvement Plan.
Longmeadow Parkway Fox River Bridge Corridor
May 28, Vision Statement and Goals, Objectives and Performance Measures for the 2040 LRTP Status of these items: Draft Approved by LRTP Subcommittee.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Transportation Planning Organization(TPO) City Council Workshop November 12, 2013.
NBOZ Northlake Boulevard Overlay Zoning District Village of North Palm Beach Landscape Element Requirements.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Land Use Study for the Community of Winchester July 9, 2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
May 14, Our transportation system will provide a safe and accessible range of options that enhances existing urban areas communities while providing.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Community Development Department Construction Phase.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
SR 436 / SR 50 Area Redevelopment Plan Board of County Commissioners February 24, 2009 Board of County Commissioners February 24, 2009.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
Livingston County Transportation Connectivity Plan Final Report December 2013.
City of Ormond Beach Planning Board Workshop June 18, 2012 PMUD : Ormond Crossings Planned Mixed Use Development Rezoning.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Public Hearings D10, E11, F12 March 26, Today’s Public Hearings D C-TRAN-2 Comprehensive Plan amendment adoption E C-TRAN-1 Comprehensive.
Community Development Department Ryan’s Landing Planned Unit Development Application No
Orange County Public Works Board of County Commissioners Presentation June 21, 2011 Board of County Commissioners Presentation June 21, 2011 Landscaping.
City of Palm Coast Evaluation and Appraisal Report (EAR) Planning and Land Development Regulation Board Presentation October 20, 2010.
Complete Streets Training Module 4b – Designing for All Users.
Town of Fuquay-Varina Planning Board
Finance Committee & City Council October 10, 2016
Jefferson County SA Red Rocks Site Approval
Central Polk Parkway PD&E Study
Project Status & Right-of-Way Acquisition
Project Management Team Meeting #3
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Finance Committee & City Council August 8, 2016
Draft Transportation Element September 6, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
ROOSEVELT CITY GENERAL PLAN 2010
Chapter 4 Osceola County Land Development Code (LDC)
Committee Update August 27, 2018.
MPO Board Presentation
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Presentation transcript:

Growth Management Department, Collier County October 6, 2015 COMPLETE STREETS, SIDEWALK/PATHWAYS & MEDIAN LANDSCAPING OPTIONS

Agenda Welcome/Agenda Review – David Wilkison, GMD Complete Streets Presentation – Billy Hattaway, District 1 Secretary, FDOT Sidewalks & Pathways – Trinity Scott, GMD Public Comments – Sidewalks & Pathways Median Landscaping Options – Pam Lulich Discussion/Questions & Answers

Sidewalks/Pathways National Complete Streets Coalition states: “Complete Streets are streets for everyone. They are designed and operated to enable safe access for all users, including pedestrians, bicyclists, motorists and transit riders of all ages and abilities.”

Metropolitan Planning Organization: Metropolitan Planning Organization Board Technical Advisory Committee Citizens Advisory Committee Congestion Management System/Intelligent Transportation System Committee Pathway’s Advisory Committee LRTP Multi- Modal Element Pedestrian & Bicyclist Comprehensive Pathways Plan Walkable Community Studies Safety StudiesTransit Transit Development Plan Transportation Disadvantaged Service Plan ADA Transition Plan AirportsMaster Plans

2012 Comprehensive Pathways Plan

Walkable Community Studies

Collier Area Transit No sidewalk along the roadway.No connection from the sidewalk to the roadway.

Regulatory – Growth Management Plan Multi-modal system that is safe, cost effective to construct and maintain, accessible to all residents and visitors, energy-efficient and capable of serving existing and future demands. (Transportation Element) Encourage interconnections. (Policy 9.3)

Regulatory – Land Development Code  Minimum 5’ Sidewalk on both sides of the roadway.  Minimum 6’ Sidewalk on both sides of the roadway and bicycle lanes. Local RoadsCollector or Arterial Roads

Regulatory – Land Development Code Alternate designs that are equivalent in function and area may be approved.

GMD Construction Coordination Coordination among Departments & Divisions:  During the planning & design phases of new construction projects (GMP Policy 4.6): Transit users Bicyclists Pedestrians Vehicles Trucks  During RRR projects (GMP Policy 4.7): Restriping for bike lanes Paved Shoulders

Facilities Constructed In Recent Years

Now Vs. Later: The Cost of Retrofit Project TypeTotal MilesDesign & Construction Costs Average Cost Per Mile Average Cost Per Linear Foot (LF) Incorporated into Capital Projects 137.3$11.8M$86,000$16.00 Stand-Alone Projects 20.18$6.15M$305,000$58.00 Current County budget for stand-alone sidewalk projects - $250,000 annually

Standard Vs. Enhanced Design  Standard Sidewalk Design  Enhanced Sidewalk Design

Conclusions Since 2000 nearly every Roadway Capital Project has incorporated the multi-modal needs of the community. Seeking an opportunity to:  Modify the Growth Management Plan to unify Goals, Objectives & Policies to be multi-modal in nature instead of compartmentalized.  Modify the Land Development Code to update Typical Cross-Sections to include multi-use paths.  Continue coordination efforts with Pathways Advisory Committee

Comments & Discussion:

Growth Management Department, Collier County October 6, 2015 MEDIAN LANDSCAPING OPTIONS: Impacts on Sight Visibility, Landscape Median Options, Potential Pilot Project

Site Visibility of Commercial Signage 2015-BCC approved amendments to Section General Landscape Requirements  Signs are setback 10 feet from the right of way line  One tree removed from the required buffer  Visibility triangle area is 15’ on each side of the signage for a total of 30 feet visibility. 15’-0” ROW Line 10’-0” Figure does not include double row hedge Visibility Triangle Area Sign Setback Sign No Canopy Tree Required

Median Landscape History ( ) : Naplescape Streetscape 90’s : Collier County Landscape Beautification Master Plan  Board approved funding for Type ‘B-C1’ landscape for median landscape  2006: FNGLA Landscape Award of Excellence Livingston Road; and Maintenance of US 41 East  2007: Fund 313 Funding Removed  : Installations through turnback money 2009 –Present: Modifications to Landscape Beautification Master Plan  Unfunded: Expansion of program through Developer, MSTU, or H.O.A. requiring Board approval for each request  Present: Public- Private Agreements U.S. 41 East

Completion DatesReady for LandscapingMiles 2008Immokalee Rd. (CR rd ) Collier Blvd. (GGB-Immokalee) North Santa Barbara (Davis to Copperleaf) Santa Barbara (Copperleaf – Logan) Collier Blvd. (US 41 East-Davis) Santa Barbara Extension (Rattlesnake to Davis) Oil Well Road (Immokalee to Everglades) Oil Well Road (Everglades to Camp Keis) /14Davis Blvd. (Radio Road to Collier Blvd.) /14Collier Blvd. (Davis to Golden Gate Canal) /14Collier Blvd. (Green to Golden Gate Blvd.) /14US 41 /951 Intersection Improvements /14Collier (US 41 to Fiddler’s Creek) Resurfacing /14Davis Blvd.(County Barn to 951)3.5 Prior 2001Airport Pulling (VBR to Imm. Rd) Not in 5- Year Plan 2.0 Prior 2001Vanderbilt Beach Road(US41-AP) Not in 5-Year Plan Orange Blossom (AP-Liv) Not in 5-Year Plan, Developer Pine Ridge Road (1 median West of Logan to 951) Not in 5-Year Plan Goodlette Frank (VBR to Immokalee Road) Not in 5 -Year Plan 0.5 TOTAL53.3 Inventory of Roadways Widened with Landscape Improvements Deferred Green Lines represent the tree inventory Blue lines are widened roadways without landscaping

Landscape Installation and Design Cost Per Mile (FY04-FY10) Fiscal YearMiles Installation Cost Per Fiscal Year LA Design Fees per Fiscal Year Total Cost Installation Contract Cost and Design Cost per Mile FY $1,664,074 $111,987 $1,776,061 $233,692 FY $3,338,958 $239,047 $3,578,005 $334,393 FY $2,380,924 $140,266 $2,521,191 $252,119 FY $2,382,359 $173,674 $2,556,033 $248,159 FY $4,470,203 $276,198 $4,746,401 $351,585 FY $1,608,231 $111,590 $1,719,821 $382,182 FY $2,266,039 $263,707 $2,529,746 $214, $19,427,258 $ 285,000 *Landscape Architectural cost were approximately $20,000 per mile and based on 2-3 mile project. *Overall Cost for Design and Installation is approximately $285,000 per mile.

Landscape Maintenance Cost Per Mile (FY03-FY14)

Potential Pilot Project: Goals Rural: Low Impact Landscape Design: To provide a new direction in sustainability, cost efficiency, and fiscal prudence.  Create a visual sense of place which consists of cold tolerant native plantings which match the existing surroundings.  Pilot Project Soil Evaluation Low Fertilization Low to Natural Irrigation Minimize Density of Planting Minimize trimming Plant palette specific to site Minimize Mulching Hurricane Resistant  Public Meeting - Visual Understanding  Study and Evaluation of long term aspects Design Roads that reduce the amount of impact. Streetscape Master Plan: Rural /East of 951: Conservation Zone

Typical Cross-Section for Roadways Rural/East of 951: Low Impact Design During Road Construction  Inverted Medians  Evaluate Specifications For Median Backfill  Retain native soils within median  Limited Clearing to preserve trees at storm water ponds  Reuse of materials Typical Cross-Section for Roadways

Potential Rural Landscape Project  Secure Funding  Work with Stakeholders to Develop a scope  Determine Project Location & Length Immokalee Road Golden Gate Blvd

Seeking an opportunity to revisit Right of Way design standards for rural Collier County Public participation will be encouraged throughout the process Pilot Project Right of way Cross Sections  Entire Cross Section reviewed Sight visibility of Commercial Properties has been addressed. Review for Complete Street Objectives: The required Canopy Trees could provide shade for sidewalks if sidewalks are placed closer to property lines. Review median cross-section for plant sustainability in rural Collier County Conclusion

Comments & Discussion:

Additional Information

Without Street Trees (B): $283,900 per mile and $42,914 Maintenance Fund Current Projects TECM Finish Dates Miles Landscape Const. Cost $283,900 per mile Cumu- lative Constr. Cost Maint. Cost $42,914 per mile FY14 Projected Maintenance Cost * Total Requested Maintenance Cost for FY14, 99.8 $4,282, Immokalee Interchange2FDO T$85,828$4,368, Immokalee Rd (CR rd ) $2,413,150 $364,769$4,733, Collier Blvd. (GGB-Immokalee) North 20083$851,700$3,264,850$128,742$4,862, Santa Barbara (Davis to Copperleaf $908,480$4,173,330$137,325$4,999, Santa Barbara (Copperleaf – Logan) 20091$283,900$4,173,330$42,914$5,042, Collier Blvd. (US 41 East-Davis) $2,129,250 $6,302,580$321,855$5,364, Santa Barbara Extension (Rattlesnake to Davis) 20102$567,800$6,870,380$85,828$5,450, Oil Well Road (Immokalee to Everglades) $1,249,160$8,119,540$188,822$5,638, Oil Well Road (Everglades to Camp Keis) $2,015,690$10,135,230$304,689$5,943, Davis Blvd (Radio Road to Collier Blvd.) FY13/14.74$210,086$10,345,316$31,756$5,975, Collier Blvd. (Davis to Golden Gate Canal) FY13/141.1$312,290$10,657,606$47,205$6,022, Collier Blvd. (Green to Golden Gate Blvd.) FY13/142$567,800$11,225,406$85,828$6,108,361 Subtotal42.54 TOTAL142.34

Fund Current Projects TECM Finish Dates Miles Landscape Const. Cost $283,900 per mile Cumulative Constr. Cost Maint. Cost $42,914 per mile Cumulative Annual Maint. Cost *Total Projected Cost Per Segment $11,225,406$6,108, US 41 /951 Intersection Improvements FY13/1 4 1$283,900$11,509,306$42,914$6,151, Collier (US 41 to Fiddler’s Creek) Resurfacing FY13/ $425,850$11,935,156$64,371$6,215, Davis Blvd (County Barn to 951)FY13/ $993,650$12,928,806$150,199$6,365, Airport Pulling (VBR to Immokalee Road) Not in 5 Year Work Program Prior $567,800$13,496,606$85,828 $6,451, Vanderbilt Beach Road (US 41 North – Airport Pulling) Not in 5 Year Work Program Prior $567,800 $14,064,406 $85,828$6,537, Orange Blossom (AP – Liv) Not in 5 Year Work Program /Landscape Existing Median $85,170$14,149,576$12,874$6,550, Pine Ridge Road (1 median West of Logan to 951) Not in 5 Year Work Program 20022$567,800$14,717,376$85,828$6,636, Goodlette Frank (VBR to Imm. Rd) Not in 5 Year Work Program /Landscape Existing Median $141,950 $14,859,326 $21,457$6,657,660 SUBTOTAL12.8 TOTAL COMPLETION COST155.14$14,859,326$6,657,660 Without Street Trees (B): $283,900 per mile and $42,914 Maintenance TECM Projects Scheduled for Completion

District 1: Public –Private Participation  FDOT - Florida Highway Beautification Grant 951 (.6 Miles) $100,000 construction  Copeland Shelters Two Shelters at Panther Park and Lake Gloria

District 2: Public –Private Participation  Palm River Linear Park  FDOT Grant: Immokalee Interchange Landscape  Landscape Maintenance Agreements along Livingston Corridor

District 3: Public –Private Participation  FDOT Grant: Immokalee Interchange Landscape  Arterial road median landscaping that was installed by an MSTU and accepted into the maintenance program.

District 4: Established Medians Original Naplescape Projects: US 41 and Davis Blvd. FDOT Grant: Landscape and Irrigation of Davis Blvd (FY 17) $200,000 construction

District 5: Public –Private Participation Immokalee MSTU Alternatives to median landscaping Pilot project