Management of Structures Aspirations and Reality Multi-storey car parks.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Environmental Project Commitments The Alberta Experience
Corporate Director Head of Planning and Transport Development Control Building Control Strategic Planning Transport Policy and Programmes Traffic and Parking.
Supervision and Administration
Department of Tourism Department of Tourism NTSS DRAFT REVIEW FRAMEWORK NTSF MEETING 17 SEPTEMBER 2014.
Getting The Theory Down to Earth Project Plan Dubai September 2007.
Feasibility of Cross-Jurisdiction Common Access Management Federation Agreements A Summary of Preliminary Findings.
Contractor Safety Management
Accident Prevention Programs What Will We Talk About? What is an accident? What is an accident prevention program? Basic elements of a program Where.
Facility Management. The International Facility Management Association defines facility management as a profession that encompasses multiple disciplines.
REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.
SEHAUC 2010 The New Safety Code HAUC (UK) JAG (UK)
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
ISO General Awareness Training
CSS Compliance Testing Project Presented by Chris Walker CSS 18 May 2005.
REPAIR MANUAL Dr. Mohammed Maslehuddin Research Institute
Introduction The service life of concrete elements in highway bridges is often limited by the corrosion deterioration of reinforcing bars. In cold regions,
SHE Code 34: Electrical Safety Safety, Health and Environment (SHE) Group.
Highways and Engineering Savings and Efficiencies Review November 2010.
Field Testing of Reinforced Concrete Structures (with references to International Standards) F.Papworth Buildings Mines Industrial Historical.
Audit Commission Presentation Salford City Council Consideration of the financial statements.
Tackling Concrete Problems in Old Buildings and their Control
Policy and Procedure Inspector Christian Ellis. Policy Statement About Policy It is best practice to have up to date, clear and standardised policies.
WG3 Leader: Michelle Bush International Working Forum for Regulatory Supervision of Legacy Sites (RSLS) – Technical Meeting October 2013.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
Establishing the accreditation programme. Agenda the context turning the principles into reality agreeing our terminology the process flow the governance.
Essex County Council Energy Performance Contracts 13th February 2013.
Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
COMPOSITE TRANSPORT WORKSHOP ON DAMAGE TOLERANCE AND MAINTENANCE The information presented in this presentation is designated as proprietary to Air Flight.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
JEETENDRA DAHAL MANAGER TECHNICAL SERVICES CITY OF PALMERSTON RISK BASED INFRASTRUCTURE INSPECTION SYSTEM.
SENJIT Code of Practice update and SEND Support Plans.
Why integrate the SAP into the social and economic processes and practices of sustainable development To ensure that the countries’ social and economic.
Dementia Screening at Stonehaven Medical Group Dr. Claire Johnston, Stonehaven Medical Group 2014 Part 1 - Audit Introduction The author recognised that.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
Performance Management Reporting: Quarter 4 Guide to Q4’s reporting Overall performance for Q4 Key Service Priorities Other performance indicators Next.
Llwyneinion Acid Tar Lagoon
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Update on EU Issues 10 th March 2010 Manchester Conference Centre Health and Safety Executive Major Hazards Policy Team Paul Edwards.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
SEC 410 Entire Course (UOP) SEC 410 Week 1 DQ 1 (UOP)  SEC 410 Week 1 Individual Physical Security Paper   SEC 410 Week 1 DQ 1   SEC 410 Week 1 DQ.
OHSAS Occupational health and safety management system.
Rarotonga 29 th January, What is an EMP? An EMP sets out how a business will undertake its operation to manage pollution risks. EMPs deal with pollution.
Institute of Building Materials Research Conservations Repair and Polymer Composites RWTH Aachen University, Germany “Who`s managing the quality in the.
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
CE UNIT 1  Maintenance is the act of keeping something in good condition by checking or repairing it regularly.
SEC 410 cart Expect Success/sec410cartdotcom FOR MORE CLASSES VISIT
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Maintaining Safety Standards
Maintaining Safety Standards
Safety Accountabilities
Rail Safety Worker Engineering and Design Competency
Project Development and Managing your Build Agenda
Presentation Title: View > Header & Footer
SHE Code 34: Electrical Safety
Engineering Project Tendering.
Involuntary Resettlement 0P 4.12: Planning Instruments
Standards, Best Practice Guidances and Thresholds
Controlling Project Cost and Schedule
Cross Compliance Implementation & Control in England
Bioprocess Engineer NOS Functional Map v4
Ensure safety devices are working prior to starting work
Presentation transcript:

Management of Structures Aspirations and Reality Multi-storey car parks

NCP since Pipers Row New technical services structure Consultant appointments Participation in technical studies ICE Recommendations Extensive structural appraisal programme Formal budgets for capital expenditure works Framework contracts Compliance with latest legislation

Aspirations for car park owners/operators Adopt ICE Recommendations Structural appraisals Obtain recommendations for further works Value engineering Formalise capital expenditure works Undertake essential/beneficial improvement works Minimal disruption to operation Public safety

ICE Recommendations for the inspection, maintenance and management of car park structures Life care plan –Appointment of an experienced engineer –Advice on structural safety –Inspection regime –Base line Safety certification –Assessment to current design standards

Base line Existing appraisal (less than 8 years old) New appraisal –Main building structure –External cladding –Vehicle impact barriers –Pedestrian guarding –Protective coatings –Associated elements

Desk study Record search –Building owners/operators –Local Authorities –Previous works contractors –Talk to locals Layout drawings Previous reports Review of records

Information gathering Supplementary site measure Condition survey Testing regime –Local breakouts for bar size & condition –Chloride contamination –Carbonation front –Cores for strength testing –Half cells for rates of corrosion

Assessments Local structural weakness Vulnerability of detail Robustness Strength of representative elements Integrity of cladding and fixings Adequacy of barriers Climbability Spalling concrete and associated risks

Structural appraisal Conclusions –Condition –Safety Recommendations –Further investigations –Repair works

Further survey Recommendations for further survey –Detailed hammer survey –Areas requiring specialist access –Intrusive investigations –Load testing –Drainage pressure jetting &/or CCTV survey

Reality Problem areas –Lack of record drawings –No reinforcement details –Elderly structures –Irregular geometry –Adjoining properties –Concealed fixings –Sub-standard support for vehicle impact barriers –Safety statement

Review of aspirations ICE Recommendations are easily adopted Structural appraisals are being undertaken Recommendations form basis for further works Value engineering used to align structural requirements with available capital Many improvements to building stock Minimal disruption to operation Public safety